負荷電納 的英文怎麼說

中文拼音 [diàn]
負荷電納 英文
load susceptance
  • : Ⅰ名詞1 (負擔) burden; load 2 (虧損) loss 3 (失敗) defeat Ⅱ動詞1 [書面語] (背) carry on th...
  • : 荷名詞(蓮) lotus
  • : Ⅰ名詞1 (有電荷存在和電荷變化的現象) electricity 2 (電報) telegram; cable Ⅱ動詞1 (觸電) give...
  • : Ⅰ動詞1 (收進來; 放進來) receive; admit 2 (接受) accept; take in 3 (享受) enjoy; take deligh...
  • 負荷 : [電學] load; charge; weight
  1. Molecules which are torn from the surface of the water bear a negative charge ( small negative ions ) whereas large drops of the entire mass of water are positive

    德( 1915年)發現:當水變成霧狀(例如水滴的碰撞)時,就會分割出正
  2. G w epox junctions accommodate up to 6 point configurations with any combination of 200a or 600a interfaces for either loadbreak or deadbreak elbows

    G w epox纜分接母排能容多至6路接線的200a或600a帶或不帶的插拔式接頭。
  3. Though the land of the prefecture of liangshan only accounts for 6 of the all the country, water energy resource theoretical gross of the prefecture reaches about 10. 5 % of the theoretical storage of all the country and 13. 1 % of the developable hydropower potential of all the country. it is supposed that we exploited the all developable hydropower potential of the prefecture of liangshan, annual energy output should be over 297 billion kw. h, then the annual average power consumption should be 230 kw. h to every chinese, and according to the shadow electric price of ertan hydroelectric plant, three gorges hydropower station and other hydropower station, the annual energy output will bring 74, 000, 000, 000 yuan industries production value for the prefecture of liangshan annually

    據樂觀預測,到2020年,全州用也僅在250 300萬千瓦之間,除開大型、巨型、超巨型水站所開發的力由國家統一購銷外,屆時中小水站所開發的力將形成800萬千瓦的供應能力,除在州內銷300萬外,至少還500萬千瓦的力需要異地銷,因此,將涼山中小型水資源優勢轉化為經濟優勢,把水資本轉化為經濟資本,推動涼山中小水產業健康持續發展的關鍵在於不斷開拓水營銷市場。
  4. From march 2002 to present, wuhan hathaway, a sino - american joint venture invested by danaher, in charge of electric power fault recorder sales work in central china

    002年3月至今,武漢哈德威力監控系統有限公司一家由美國丹公司投資的合資公司,主要力系統監測設備故障錄波器在華中地區的銷售工作。
  5. In sum, the main contents of the thesis include : 1. analyses of the impact of different load characteristics on static voltage stability with the v - p - and - v - q curves of power system loads

    起來,本文的主要內容包括: 1 .應用力系統壓-功率特性曲線,分析了不同特性對靜態壓穩定性的影響。
  6. To expedite the exploitation of hydroelectric resources of huanghe upstream meets the request of western development, and is significant to the strategically overall arrangement of realizing the optimization deployment of resource and transporting clean energy to the east but, for a long time, in the electric market, the supply - and - demand analysis and the science - oriented, reliable forecast of electric network load is absent. in the developing gradation, the support of theory about hydroelectric plants " developing gradation is absent. in the pattern of management and development, a theoretical system of developing, management is absent, such as the relation of the synthetically utilization of hydroelectric development and water resource and environment should be brought into the unified planning and managing system of the valley

    但是長期以來,在力市場方面,缺乏科學、可靠的需求預測及市場供需分析;在開發順序方面,缺乏水站開發順序理論方法依據的支持,影響了開發的層次和速度;在開發管理模式方面,缺乏一套行之有效的開發、經營及管理的理論體系,比如水開發與水資源綜合利用及與生態環境的關系等,都應入流域統一規劃、統一管理的水開發利用管理體系中。
  7. Because the harmonics in tangyin substation are primarily from electric traction loads, this paper gives the structures of several main locomotive models and general harmonics they produce. the harmonics produced by electric locomotive have a characteristic that their range and phase are both dispersive. this paper also analyzes the impedance - matching balance transformer ' s structure and harmonics injected into the power system at its primary side, and sums up the characteristics of the harmonics from electric traction loads in the tangyin traction substation

    鑒于湯陰變站的諧波主要來自力牽引,本文列舉了力機車幾種主要車型的結構以及它們產生諧波的概況,得出了力機車的各次諧波流幅值和相角具有較大分散性的特點。針對湯陰牽引變站的牽引變壓器,分析了阻抗匹配平衡變壓器的結構及其高壓側注入網的諧波,推導了有關計算公式。通過理論分析並結合湯牽線的實測諧波數據,歸力牽引注入湯陰變站的諧波的特點。
  8. On the basis of investigating and analyzing the economy development lev el of three gorges electric power aim market, the paper has studied the total electric power consumption level of three gorges electric power aim market, load increasing rate and the potential of electric power consumption, settled the base of establishing marketing strategy

    在調查分析了三峽力目標市場的經濟發展水平的基礎上,研究了目標市場的總體用水平、增長率及力消潛力,為營銷策略的制定打下基礎。
  9. The nlo properties of the essa films were measured with the ns / ps laser by using the z - scan technique. the materials c60 derivatives ( mono - adduct tmaf, tri - adduct ttaf and hexa - adduct thaf ) and pss act as the positive charged electrolytes and opposite electrolyte, respectively

    利用秒和皮秒激光脈沖作為光源,採用z - scan技術測量了以c60衍生物(單加成tmaf 、三加成ttaf和六加成thaf )為正解質, pss為解質的靜自組裝薄膜的光學非線性。
  10. Additionally strong electrostatic attraction formed between the metallic cations and the anionics with a large number of negative charges on the terminal groups, which provided the synthesis of some nano - particles of complex structures with inducting skeleton

    此外,由於陰離子表面活性劑端基帶有大量可以與金屬陽離子產生較強的靜吸引作用,為一些復雜結構的米粒子的合成提供了誘導骨架。
分享友人