貫序檢驗法 的英文怎麼說

中文拼音 [guànjiǎnyàn]
貫序檢驗法 英文
sequential test,
  • : Ⅰ動詞1 (穿; 貫通) pass through; pierce; thread 2 (連貫) be linked together; follow in a connt...
  • : Ⅰ動詞1 (查) check up; inspect; examine 2 (約束; 檢點) restrain oneself; be careful in one s c...
  • : 動詞1. (察看; 查考) examine; check; test 2. (產生預期的效果) prove effective; produce the expected result
  • : Ⅰ名詞1 (由國家制定或認可的行為規則的總稱) law 2 (方法; 方式) way; method; mode; means 3 (標...
  • 檢驗 : checkout; test; examine; inspect; verify; survey; check;checking;testing;[英國]jerque(指檢查船舶...
  1. Objective : to provide a minimum sample size approach and a sequential sampling approach for testing whether the sporozoite rate has exceeded the critical level of malaria epidemics using the pool sampling method

    摘要目的:給出基於混合樣本的最小測次數,以子孢子陽性率是否超過導致瘧疾流行的臨界水平。
  2. Present to use sequential posterior odd test, which can be abbreviated spot, to verify reliability and maintainability index, and give the methods respectively of based on simple hypothesis, complicated hypothesis and censoring spot method under the ground of known two class risks

    提出利用后加權( sequentialposterioroddtest ,簡稱spot )方對r & m指標進行證,在兩類風險已知的條件下,給出基於簡單假設、復雜假設和截尾情況下的spot方
  3. Results : the optimal pool size, programming of matlab, and the steps of trials of the 2 approaches were given

    結果:給出了最小測次數的最優混合樣本計算方、 matlab程和具體操作步驟。
  4. The quality control of the development control is a kind of original control and system control, and need carry out the idea of " prevention first, success one time ", and devide the development period reasonablly, the basic requirement of the quality control during the development period. the quality control during the manufacturing period must strengthen the control for purchased parts, working procedure, batch, key parts and important parts, quality check, reject parts, technical status, treating of with quality issues, etc. we must adopt check method in effect to assure that the reject products can not be taken out of the factory. we must collect and treat the quality information for the employment period, and serve the users in a good way

    研製過程的質量管理是源頭的管理、系統的管理,必須徹預防為主、一次成功的思想,合理地劃分研製階段,遵循研製階段質量管理的基本要求;生產過程質量管理要從外購器材的管理、工的管理、批次的管理、關鍵件和重要件的管理、質量的管理、不合格品的管理、技術狀態的管理、質量問題的處理等方面加強控制;採取有效的收方保證不合格的產品不出廠;及時收集處理使用過程的質量信息,做好為用戶服務。
  5. Besides, how to improve sequential test is discussed. then, the data structure design of reliability block diagram and assessment algorithms of system reliability software is discussed, the method how to resolve the key problems is given, the functions of the software and how to use is introduced, too

    同時,以二項分佈為例,討論了的改進然後,討論了武器系統可靠性評估軟體的可靠性框圖數據結構設計和評估演算實現,給出了關鍵問題的解決辦,簡要介紹了軟體的功能與使用。
  6. A parallel distributed sequential fusion detection algorithm is also developed for the multi - band target detection problem. the optimized fusion algorithm is determined based on the theory analysis and the experiment ’ s results. the exo - atmospheric ballistic target ’ s optical signature and recognition feature is studied

    針對多波段條件下的目標融合測問題,採用并行分散式融合演算對各通道的測結果進行融合處理,並根據理論分析和模擬實結果確定了最佳的融合測演算
  7. Applications of multiple - model smoothing algorithms for maneuvering target tracking are studied via simulation, some important conclusions are obtained. based on model - set sequential likelihood ratio, an enhanced agimm, in which model - set adaptation is implemented by jointly utilizing model posterior probability and predication probability, is proposed, simulation results indicate that improvements of both dynamic and steady state tracking performance are achieved with the enhanced algorithm

    模擬研究了多模型平滑演算在機動目標跟蹤中的應用;利用模型集合似然比,提出了一種綜合利用模型后概率和預測概率實現模型集合自適應的綜合格自適應多模型演算,模擬實表明演算有效改善了動態跟蹤精度和穩態跟蹤性能。
分享友人