費用總數 的英文怎麼說

中文拼音 [yòngzǒngshǔ]
費用總數 英文
all-in charge
  • : Ⅰ名詞1 (費用) fee; expense; expenditure; dues; charge 2 (姓氏) a surname Ⅱ動詞(花費; 耗費) ...
  • : Ⅰ動詞1 (使用) use; employ; apply 2 (多用於否定: 需要) need 3 (敬辭: 吃; 喝) eat; drink Ⅱ名...
  • : Ⅰ動詞(總括; 匯集) assemble; gather; put together; sum up Ⅱ形容詞1 (全部的; 全面的) general; o...
  • : 數副詞(屢次) frequently; repeatedly
  • 費用 : cost; expenses; outlay
  1. Small extra costs all swell the total.

    零星的額外使增大了。
  2. The necessary expenses for the remains repatriation service include the expenses for embalming, preserving, cremating, transporting, cinerary casket and other materials and services, which will be paid by the company after verified directly to international sos, but subject to a maximum of the basic sum assured as stated in the rider

    遺體送返服務所需的經本公司核實確認后直接支付給美國國際支援服務公司,費用總數最高以投保單或批註上所載的本附加合同基本保險金額為最高限額。
  3. Ang, b. w., zhang, f. q., choi, k. h., 1998. factorizing changes in energy and environmental indicators through decomposition. energy 23 ( 6 ), 489 - 495

    當年的能源消量和生活能源消量的據都可以在各年的《能源統計年鑒》中直接查到
  4. For most commercial banks, loan asset could overweigh half of their whole asset, and bring an interest and fee income about 50 % - 60 % of the whole commercial bank income

    對于大多銀行來說,信貸資產佔到銀行資產的一半以上,其帶來的利息與收益占銀行收入的50 % - 60 % 。
  5. Based on the theory of unsaturated soil mechanics and the properties of compacted expansive soil, this paper takes the northern part k12 + 840 - k12 + 920 of nanning urban highway as an example to studies some aspects of lime improvement of expansive soil and the technology of construction. the chief content of this paper is : the lime improvement mechanism of expansive soil ; confirm the technical parameters of lime mixed from the results of test in laboratory ; the scale - down test to define the maximum effective grain size of expansive soil when it is improved by lime ; by building bank slope model and making use of finite element seepage flow program of saturated - unsaturated to calculate the examples, this paper simulates the humidity site in order to checkout the effect of lime improvement ; studies and proves that it is feasible to mix blocky expansive soil and pulverous lime, and to fill roadbed by common construction machines etc.

    本文研究的工作就下述幾個方面展開:石灰改良膨脹土的機理;通過室內試驗確定摻灰的技術指標;在室內進行膨脹土摻灰的最大有效粒徑的模擬試驗,即鈣離子水試驗,由此結出「粉?塊」灰?土攪拌工藝的有效性、合理性和可行性;值方法對路堤使期的濕度場進行模擬,並與路堤的強度?變形的計算域耦合,以檢驗土性改良的效果,從而探索一種描述改良膨脹土路堤運行工況的值方法;現有最常的且最低的施工機具,對灰?土進行「粉?塊」攪拌摻和及路基的填築施工等。
  6. You ' ll see the total number of page, ad unit, and ad impressions as well as ad clicks, clickthrough rate ( ctr ), cost per thousand impressions ( effective cpm ), and your earnings

    在報告中您可以看到網頁展示次、廣告單元展示次、廣告展示次、廣告點擊次、點擊率( ctr ) 、每千次展示(有效的cpm )以及您的收入。
  7. In the study on the method of risk decision in project bidding based on considering emulant, according to the contents and the characteristics of risk decision in the stage of bidding, based on considering the pure risks and the speculative risks, and setting out from monomial risk, internal number and internal probability were used in describing each risk element. then, the optimization of strategies for monomial risks was done. and the computation was used to sew up the scheme, the progress, the cost and the overall risk compensation

    在工程項目投標階段的風險決策方法研究中,根據投標階段風險決策的內容和特點,在考慮純風險和投機風險的基礎上,從單項風險入手,運區間和區間概率的性質,先描述各個風險要素,然後進行單項風險對策間的對比擇優,並將其結果對應于方案、進度、成本及投標報價風險補償的確定,最終實現承包商的風險成本最小化。
  8. Evading risk in financial trading market cries for pricing options to a nicety. asian option, as the most flourish options in the finace market, the pricing has been focused on always. the exact pricing formula for the geometric average asian option had existed, but as to the european - style arithmetic average asian option, due to the dependence structure between the prices of the underlying asset, no analytical formula exists. on the hypothesis that the market is frictionless and without transaction costs 、 on the base of b - s ’ s and in the binomial tree model, we provide several algorithms for computing an accurate value of the european - style arithmetic average asian option. following rogers and shi and by jensen ’ s inequality, many different upper and lower bounds are provided ; meanwhile a formula have got by the comonotonicity and approximating the distribution function. all of the algorithms are easy for programming. with the development of computer, more accurater price can be computed quickly. and numerical example proved that these algorithms are very accurate

    對于幾何平均亞式期權它的定價相對簡單,已經給出了定價公式。對于算術平均亞式期權,它的未定權益具有軌道依賴特性,一直沒有得到它的定價方程的解析解形式。本文基於對市場是無摩擦且在沒有交易的情況下,在b - s模型下,利二叉樹模型給出了算術平均亞式期權定價方法;並結了利jensen 』 s不等式給出的各種不同情況下的上下界;同時應共單調性和近似分佈函的方法也給出了算術平均亞式期權價格的近似公式。
  9. The second chapter studies the economy of ship ' s power plants, based on the aspects of lowering fuel cost, waste heat recovery, the match of ship, machinery and propeller, increasing propulsion efficiency, increasing the economy of ship ' s power plants, etc. the third chapter discusses in detail the control measures of voyage change cost, analysizes systematically the voyage change cost based on the way of fuel cost, harbor cost, voyage venture cost. the fourth chapter studies the structures and control measures of seafarers cost, maintenance cost, spare parts and stores cost, lubricating oil cost, etc. which are relatively easy to be controlled ; based on the state maintenance decision - making, a mathematical model is put forward, the validity and its solve process are discussed. the control measures of spare parts, fuel cost and lubricating oil cost should be based on scientific budget, through the control means of application, reception, usage, store check, try to acquire the inosculation of theory

    第一章主要討論營運船舶運輸成本,對船舶運輸成本的概念、結構、性質與分攤、成本細分進行了分析,從宏觀上闡明了船舶運輸成本的生存環境和生長趨勢;第二章研究了船舶動力裝置的經濟性,在營運船舶降低油耗、廢熱利、船機槳匹配、提高推進效率、提高船舶動力裝置經濟性的有效途徑等方面進行了闡述和論證;第三章詳細論述並論證了航次變動成本的控制措施,全面系統地分析和結了航次變動成本,通過對燃油成本、港口使、航次風險成本的分析與控制,提出了航次風險成本的概念並論述了若干航次風險成本的控制措施;第四章對船舶營運成本中的船員控制、維修保養及其控制、船舶備件物料管理及其控制等幾個主要可控性較高的成本進行了細致的分析並分別討論了相互的控制措施,提出了基於狀態維修決策的馬爾可夫學模型並論證了模型的正確性及具體解算步驟,對于備件、燃潤物料的控制堅持以科學的預算為前提,以申領、接收、使、盤存為控制環節,切實做到理論與實踐的密切結合;第五章,結合營運成本的預核算的案例,對船舶營運成本的預算及核算進行了有益的探討,旨在揭示成本發生的動因,並給出了成本預算、核算的編制方法。
  10. The slope geometry is variable quantities, and the reliable safety and reliability are main limiting factors. according to the above factors, a optimized model for designing high loess slope is established. this model ' s concept is precise, and its physical meaning is confirm, people who do designing work can see this model as a means

    最後,為了使邊坡設計獲得最佳工程效果,本文在崔政權建立的優化公式: c = a + pf ? b的基礎上,全面考慮施工造價和風險造價,運學原理和優化理論,?效益分析方法,以最小期望造價為目標函;以坡型、坡比為設計變量,以安全可靠為主要約束條件,建立了黃土高邊坡的優化模型。
  11. Simply extract the figure for " purchases " from the profit and loss a c, irrespective of whether direct costs, direct expenses or overheads have been included under " purchases " in the accounts

    不管帳目內采購值一項是否包括了直接成本直接或間接,只須從損益帳摘錄采購值的目便可。
  12. In case that the lease period is less than one ( 1 ) year, no matter whether at the request of the customer, or as a result of default in payment or violation of law, the customer shall be liable to cht for 35 % of the monthly rentals of port and pvc cir for the remaining period, in addition to the monthly rentals of domestic leased data circuit and dsu for the remaining minimum lease period in accordance with the leased circuit service regulations

    九、戶租本業務不滿一年即行拆機,不論是戶申請退租、欠,或違反法令而終止租,其據電路暨據機月租按國內據電路契約條款有關規定計收未滿期間之租,而通信埠暨固定通信之約定資訊速率月租則按每月應繳額百分之三十五計收自停租日起至租后滿一年期間之各月租
  13. Based on a mathematical model which conforms to constraints, and has minimum discounted value of the sum investment and loss - cost in whole planning period, a new binary coding genetic algorithm is presented to solve multi - stage planning problem in this thesis. the method is proved to be efficient by test example

    本文分析了多階段電網規劃的思路,基於一個滿足約束條件,並在整個規劃期內所需要的投資和運行和的貼現值為最小的學模型,遺傳演算法對算例進行了計算,計算中染色體編碼採了涵括多個時間段的二進制方式,有效地解決了各階段之間的協調問題。
  14. Two fields may show up on this report indicating the amount of rounding errors that can occur from summing individual charges and the total invoice charge

    在此報告上會顯示兩個欄位,說明在合計單項和發票額之間會發生的舍入誤差額。
  15. The total amount of litigation fees paid from public money for such cases in the past five years amounts to $ 20. 3 million

    (二)過去五年,由公帑支付有關的訴訟費用總數為二千零三十萬元。
  16. To the extent applicable, you agree cleverlearn may accumulate charges incurred during your monthly billing cycle and submit them as one or more aggregate charges during or at the end of each cycle and that cleverlearn may delay obtaining authorization from your card issuer until submission of the accumulated charge ( s )

    在可實行程度上,你同意慧學英語扣除其累計,即和。慧學英語在每個周期末一次性提交你的累計並且可能會因為該原因而出現延後獲得授權的現象。
  17. B to the extent applicable, you agree cleverlearn may accumulate charges incurred during your monthly billing cycle and submit them as one or more aggregate charges during or at the end of each cycle and that cleverlearn may delay obtaining authorization from your card issuer until submission of the accumulated charge

    B在可實行程度上,您已同意cleverlearn扣除其累計,即和。 cleverlearn在每個周期末一次性提交您的累計並且可能會因為該原因而出現延後獲得授權的現象。
  18. The total amount of prescribed document fees for all applications will be payable in one lump sum

    在每項交易中所須繳付的訂明文件費用總數,必須一次過繳付。
  19. With the amount in hong kong dollars ( which is the sum of the price of standard ( s ), postage and overhead charge ) as indicated in the notification

    ,並在支票上寫上相等於通知書內所說明的標準的確實價格、郵及行政費用總數
  20. Therefore, based on the resistance formulae which is obtained at the beginning of this paper, the mathematic model which sets the economic value as the objective function can be established, and then uses optimization method to get the best structure of the filter when its first invest, maintenance together with operating costs are most economical. and the different results gaining from resistance and economic analysis are compared at the end

    因此本文最後著重在經實驗最終確立的阻力公式基礎上,以多管式高效過濾器的經濟性指標為目標函建立學模型,採有約束單目標多變量的最優化方法,計算得出了該種過濾器初投資和運行維護的經濟性最優時的結構參,並與僅從阻力方面考慮所得到的結果進行了分析比較。
分享友人