質量排水量 的英文怎麼說

中文拼音 [zhíliángbèishuǐliáng]
質量排水量 英文
mass displacement
  • : Ⅰ名詞1 (性質; 本質) nature; character; essence 2 (質量) quality 3 (物質) matter; substance;...
  • : 量動1. (度量) measure 2. (估量) estimate; size up
  • : 排構詞成分。
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • 質量 : 1 [物理學] mass 2 (產品或工作的優劣程度) quality 3 economy (離子源的); 質量標準 quality level...
  • 排水量 : displacement; withdrawal; tonnage; water discharge; water displacement
  • 排水 : drain off water; drain away water; dewatering
  1. The main contents include : water environment, marine sediment and the trend monitoring of marine life quality ; at the same time, to consolidate the monitoring of the functional zones, such as seashore bathing places, oceanic reserves, marine aquafarms ; to set up the seashell monitoring and controlling zones in the sea areas of both pingtan and yunxiao at the first time ; to carry out the statistical monitoring of polder, exploiting sea sand, spartin aallerni flora, terrestrial sewages, etc., to carry out monitoring of the total quantity of pollutants into the offshore marine areas in the min river, the jiulong river as well as the municipal sewages of xinlin industry in xiamen and jiaocheng in ningde ; to carry out the red tide monitoring in the offshore marine areas of fujian province ; to implement time - lapse, pointing and continuous red tide monitoring of high frequency and high intensity in the sandu gulf, the min river estuary and offshore marine areas of xiamen

    主要內容包括環境、海洋沉積物和海洋生物的全海域環境趨勢性監測,同時加強了海浴場、海洋保護區、海增養殖區等功能區監測;首次在平潭和雲霄海域設置了貝類監控區;開展了圍填海、海砂開采、互花米草、陸源污口統計監測;並在閩江、九龍江、廈門杏林工業污口、寧德蕉城市政污口鄰近海域開展污染物入海總監測;在全省近岸海域開展赤潮監視監測,對三都灣、閩江口、廈門近岸海域赤潮監控區實施高頻率、高密度的定時定點連續監測。
  2. This paper analyzes the groundwater discharging course using fluidics theory and combining quay structure construction ; sets up the method of fast drainage by the dint of pipeline and blind ditch of fragment stone ; and gives the computational mathematical model for quay drainage and calculation formula for drainage process according to the principle of conservation of mass and underground percolation, which have been applied for quay ' s stability design and calculation

    應用流體力學理論結合碼頭結構建設,分析了地下泄過程,藉助管道和碎塊石盲溝建立了港口碼頭快速與擋墻基床的方法;運用守恆定律和地下滲流原理,建立了港口碼頭計算數學模型和過程計算公式,並用在了碼頭的穩定設計計算中。
  3. Construction ministry " housing project quality guarantees method " made lowest guarantee to housing project the regulation of deadline : among them 1, foundation foundation project and project of main body construction, to design the reasonable use fixed number of year of this project that the file sets ; 2, the waterproof project, toilet that has waterproof demand, room mixes the building outside of metope prevent leakage, for 5 years ; 3, heat addition and supply cold system, for 2 heating period, offer cold period ; 4, electric cop, to catchment conduit, equipment installation is 2 years ; 5, decorate a project to be 2 years

    建設部《房屋建築工程保修辦法》對房屋建築工程作了最低保修期限的規定:其中1 、地基基礎工程和主體結構工程,為設計文件規定的該工程的合理使用年限; 2 、房屋防工程、有防要求的衛生間、房間和外墻面的防滲漏,為5年; 3 、供熱與供冷系統,為2個採暖期、供冷期; 4 、電氣管線、給管道、設備安裝為2年; 5 、裝修工程為2年。
  4. The watershed ' s worst problem is nutrient pollution, which is caused by the overabundance of the nutrients, nitrogen and phosphorus

    嶺面臨更嚴重的問題,來自營養物的污染,這些營養物污染源自營養物、氮和磷的過放。
  5. In yishui county, wastewater is increased quickly with the development of economy and increase of urban population. suburbanites are suffering from environmental quality deteriorated caused by the wastewater directly discharged from industries and community. but the government ca n ' t finance the building of sewage treatment plant nor the running of sewage treatment plant

    隨著沂縣經濟的發展和城市人口的增長,城市污日趨增多,工業污和未經處理的生活污直接入城區河流,導致環境惡化,已嚴重影響了城區周圍居民的生活,而地方政府財政困難,既無力建設城市污處理廠,也無力承擔污處理廠的運營費用。
  6. Point source pollution and non - point source pollution are always the two important problems of the water environmental quality. point source pollution mainly includes industrial sullage and city ' s life sullage, which are drained from the certain outfall

    點源污染和面源污染一直是環境的兩大問題,點源污染主要包括工業污和城市生活污,通常在污口集中放。
  7. The litter - resistance slowly closing butterfly check valve is developed a newest product based on our butterfly check valve, hydra - matic transmission to be add in the valve with unique design, new stuction and optimum performance, can be used pipeline of water supply and dring with such media : fresh water, sea water, sewage, raw water, ect. the valve should be installed at outlet of the water pump, in stapping the pump, the process of slowly closing after valve plate shuts rapidly. can be guard effectively against the destruction water hummer, so to ensure the safe operation of the pipline

    微阻緩閉蝶式止回閥是在我廠生產的蝶式雙瓣止回閥的基礎上利用能轉換原理增設油壓緩閉裝置的新型模式止回閥,設計獨特,結構新穎,性能優宜,適用於凈,源,污,海等介的供、管路中,安裝於泵出口端,停泵時由於油壓阻尼作用法盤先速閉后緩閉,以消除破壞性錘,保證灌路安全運行。
  8. The optimum conditions for air electrode preparation were shown as follow : 20 % ptfe and 20 % mno2 in active layer, thickness of active layer 0. 15 - 0. 25mm and the ratio of active carbon to ethine black 4 : 1 ; 60 % ptfe in the gas diffusion and waterproof layer, employing na2so4 as pore - making agents, thickness 0. 35 - 0. 45mm, colding forming and layer sequence catlytic layer / gas diffusion and waterproof layer / current collector layout ; employing 40 meshed nickel screen as current collector and thermal treatment temperature over 200

    確定了制備空氣電極的優化工藝條件,催化層中ptfe含約20 , mno _ 2的最佳含約為20 ,催化層中活性炭和乙炔黑的比例為4 : 1 (比) ,厚度在0 . 15 - 0 . 25mm之間。防透氣層中ptfe的含約為60 ,以無硫酸鈉作為造孔劑,厚度一般為0 . 35 - 0 . 45mm 。電極各層採用催化層/防透氣層/集流體的布方式,冷壓成型,熱處理對空氣電極的性能影響較大,熱處理溫度不低於200 。
  9. According to the distribution peculiarity of the two characteristic moments, the accessibility of water quality in taizhou source of yangtze river has been analyzed based on the maximal contamination zone of entire tide and the relationship between the length of contamination zone and the pollutant load. simultaneously, every project has been analyzed and compared by using the model in wuli lake water environmental renovation for getting some theoretic gist and technical supports for the engineering

    在此基礎上進行泰州江段數值模擬,建立污混合帶范圍與關系曲線,並對泰州江段供源地可達性進行了分析;將模型應用於五里湖環境治理工程中,預測各引方案下湖體狀況並進行各方案分析,從而為工程實施提供一定的理論依據和技術支持。
  10. Fuzzy comprehensive assessment of the underground watercontaminated by the leaching water of dumping area of open pit coal mine

    露天煤礦土場地下環境影響的模糊綜合評價
  11. With regard to its field drilling applications in the geologically loose sandy pebble layers, kl vegetable - gum drilling fluid showed itself with excellent rheological behaviours in its abilities of lubrication, lost circulation, suspension and removal of debris, anti - shear shinning, and high coring rates, which satisfactorily meet the demands of geological boring in the dam foundation of huangjin ping hydroelectrical power plant

    通過在黃金坪電站壩基深厚砂卵石覆蓋層鉆探取芯的現場試驗,證明了kl植物膠沖洗液具有優良的流變特性,潤滑、堵漏、懸浮除巖屑和抗剪切稀釋能力顯著,可實現高取芯率,能很好的滿足地鉆探對取芯的要求。
  12. They are moderately well drained with a fluctuating water table and contain low amounts of organic matter, phosphorus and potassium and

    受地下位波動影響,土壤程度中等,有機、磷和鉀含低(表2 、 3 ) 。
  13. An iron - containing material with an iron grade of over 20 % can be recovered from magnetic separation tailings of liuling iron mine by gravity method. this material can be used instead of partial clayey material to produce portland cement so as to reduce the mine tailings discharge amount to 43. 52 %, to raise the iron recovery from 70. 89 % to 84. 62 % and to reduce the iron ore powder consumption in raw cement mixture and the energy consumption of raw material grinding

    用重選法從劉嶺鐵礦磁選尾礦中回收鐵礦物,可獲得鐵品位大於20 %的含鐵物料,用此物料代替部分粘土原料生產硅酸鹽泥,使礦山尾礦減少至43 . 52 % ,鐵的回收率由70 . 89 %提高到84 . 62 % ,並且減少了泥生料配料中鐵礦粉的用,降低了生料粉磨能耗。
  14. This system can be used to monitor the change in the underwater ground profiles during the geotextiles - laying process. all the data related to the process is recorded by the system. the system can predict and analyze the ground sections that have potential impact on the geotextiles - laying, and improve the quality of the geotextiles - laying

    通過深監視系統,操作人員可以掌握鋪過程中下地形的變化情況,對可能影響鋪效果的地段作出前期的預測和處理,提高鋪,並且記錄鋪過程中的各種數據,作為檢驗鋪和施工效果的依據。
  15. Discussion on the plastic drain slab in dealing with engineering quality of soft soil groundsill

    塑料板處理軟土地基的工程監理措施的探討
  16. The turnout of smco magnet per year reach 70 tons, products have been exported west europe, north america and southeast areas and countries etc, the export sum for one year is more than thirty million rmb, in the meantime, ngyc is running according to rwtuv iso9001 : 2000 qualtiy system, and was listed in one of the ningbo export products quality guaranteed enterprises. contact person

    經過十幾年的創業發展,公司固定資產已達千萬元,擁有各種先進的加工生產檢測設備,年產釤鈷70噸,名全國前列,接近世界先進平,產品遠銷西歐北美東南亞等幾十個國家和地區,年出口額三千萬元人民幣以上。
  17. Cod water quality online automatic monitor, continuous emission monitoring system ( cems ), air quality monitoring system, which are developed by our company and have the independent intellectual property rights, have reached the leading level in domestic field and keep step with international level

    河北亞太環境科技發展股份有限公司開發的擁有自主知識產權的cod在線自動監測儀,煙氣連續放監測系統,空氣監測系統,性能均達到國際同步、國內領先平。
  18. With the implementation of a closed low flow drainage system for the collection of runoff from the proposed third golf course, and lower fertilizer and pesticides requirements for seashore paspalum, no operational water quality impact is expected

    透過實行密封低流系統以收集擬建球場的徑流對海岸雀稗的低肥料和除蟲劑使用,運作階段將不會出現影響。
  19. According to the characteristic of computer center of college, the article conducts a series of research on the questions of management in course arrangement, open computer reckon - by time and charge statistics in computer center. it aims to improve the quality and levels of management of computer center. for example, according to teacher ' s demand of computer teaching general timetable of computer operation is formed and the timetable of each day will be shown at the entrance of computer center, so the teacher can direct the students to operate the computer effectively and orderly

    本文根據大專院校計算中心的特點,對計算中心的課程安和開放的計時計費統計等一系列管理問題進行了研究。目的在於提高計算中心的管理平,如:根據任課教師的教學上機要求形成計算中心的總體上機課程表,並將每天的上機課程表顯示在計算中心的入口處,指導學生高效有序地上機;教務處可通過校園網查看計算中心的上機課程表;對于開放上機,能準確地計時計費。
  20. Certainly she was the most powerful warship of her day and her displacement of 41, 200 tons made far and away the heaviest capital ship in the world for twenty years

    胡德號直到1920年才真正完工,毋庸疑,她是當時最強大的戰艦。她41200噸的,在20年內都遠遠超過當時最大的主力艦。
分享友人