走線架 的英文怎麼說

中文拼音 [zǒuxiànjià]
走線架 英文
cable rack
  • : 動詞1 (人或鳥獸的腳交互向前移動) walk; go 2 (跑) run 3 (移動; 挪動) move 4 (離開; 去) lea...
  • : 名詞1 (用絲、棉、金屬等製成的細長的東西) thread; string; wire 2 [數學] (一個點任意移動所構成的...
  • : Ⅰ名詞1 (用來放置東西或支撐物體等的東西; 架子) frame; rack; shelf; stand 2 (毆打; 爭吵) fight;...
  1. However, up to today with the development of social industrialization, especially the advance of building and building technology, the successive appearance of land three - dimensional usage such as high building, overhead railway, underground railway, air corridor, underground market, the wire of high voltage and last sewer etc., at the same time, many problems produced by the ownership and the usage of land space also have been put forward

    土地所有權的行使及於土地的上下,土地所有權的效力「上達天宇,下及地心」 。然而,時至今日,隨著社會工業化的發展,特別是現代化土木、建築技術的進步,高樓大廈、高鐵路、地下鐵道、空中廊、地下商場、高壓電、上下水道等土地立體化利用情形陸續出現,同時,因對土地空間所有和利用所產生的諸多問題也開始被提出。
  2. According to the guide thoughts and development goal of the whole district of the following five years, the district government defined the basic frame for the whole district, as “ one city five towns and double corridors ”, central city “ one river two lines and one road ”, projecting “ the five functions ”, emphasizing on the development of “ the five industrious groups ”, the working routines for the construction of the new city zone

    按照全區今後五年工作的指導思想和奮斗目標,區政府確立了構築全區「一城五鎮雙廊」 、中心城「一河兩一路」基本框,突出「五大功能」 ,重點發展「五大產業群」 ,加快建設北京新城區的工作思路。
  3. A new planning method - analysis of factors of point line and area and control points optimization, which is based on the analysis of urban spatial structure, is tried to put forward. analyzing the important functional clusters in the spatial layout of the urban, the intracity medium - long distance vehicle traffic major directional desire line how the urban to link up with the highway network and the whole structure of expressway system, the skeleton of the expressway network can be obtained. using the degree of importance method analytic hierarchy process ( ahp ), one or several intersections can be selected

    該法對城市空間結構布局中的重要節點、主要的中長距離機動車交通流徑期望的分佈、大城市與區域干公路網的銜接以及快速路系統網的整體結構等進行分層次的分析研究,得出快速路系統網構,運用重要度法、層次分析法找出大城市重要功能組團中重要程度最高的一個或數個關鍵交叉口作為快速路系統網規劃的控制點,考慮快速路向的控制點對向進行優化。
  4. During the scaffold erection and when walking on the pipe rack, safety harness must be secured to the life line on the pope rack

    腳手搭設過程中和在管上行必須將安全帶扣在設置好的橫桿或生命
  5. The nervous excitement of which we speak pursued valentine even in her sleep, or rather in that state of somnolence which succeeded her waking hours ; it was then, in the silence of night, in the dim light shed from the alabaster lamp on the chimney - piece, that she saw the shadows pass and repass which hover over the bed of sickness, and fan the fever with their trembling wings

    瓦朗蒂娜睡著的時候更準確地說是在她醒來后的那種半醒半睡狀態中她仍然處于亢奮狀態那時,夜深人靜,壁爐上那盞乳白色燈罩射出了昏暗的光,在這寂靜和昏暗中,她看見那些影子在病床上空一一過,用它們顫抖的翅膀煽動寒熱。
  6. At the same time, some bus routes currently travelling via yee wo street were diverted or truncated, resulting in a reduction of some 440 bus trips daily

    與此同時,部份現時行經怡和街的巴士路在改道或縮短路程后,每日可減少約440次的巴士在這路段行
  7. In this paper global joint planning for middle and low voltage network is considered. both line arrangement and cross section and transformer arrangement and rate are considered. it is a non - line combined optimum problem more complex than single network planning

    本文從整體的角度考慮中壓和低壓配電網路的聯合規劃,不僅考慮了向和導截面大小,而且考慮了變壓器的布置位置和容量,這是一個比單純的網規劃更復雜的非性組合優化問題。
  8. Flame testing of cables for use in cable tray in industrial and commercial occupancies

    工業和商業中走線架內用電纜的燃燒試驗
  9. The three kilometre kwai chung section is formed by a dual - four lane elevated highway along kwai chung road corridor that runs to lai chi kok

    三號干葵涌段全長三公里,為雙程四雙程的空道路沿葵涌道廊至荔枝角。
  10. Outdoor cabling rack

    室外走線架
  11. Indoor cabling rack

    室內走線架
  12. Transportable take - up stand

    式收
  13. Travelling pay - off stand

    式放
  14. Mobile pay - off stand

    式放
  15. The techniques of cast - in - situ concrete box girder by movable formwork bridging machine, which is a railway erection crane for bridge made up by universal rods, are effective, reliable and can use the exiting road for opporation

    摘要採用萬能桿件等常規材料拼裝的軌道行式移動模造橋機,能利用既有道路進行高橋現澆箱梁施工,且工期短、效率高、安全可靠,適宜於城市輕軌交通中等跨度雙預應力混凝土筒支箱梁的現澆施工。
  16. This paper takes landform of transmission line aisle and spanning instance into account with reason, establishes the model of light striking to the tower and transmission line by wave transmitting on power line

    在計算中,本文合理考慮了輸電廊的地形、路的設情況,根據行波法原理,建立了雷擊輸電路桿塔的行波法計算模型。
  17. Singapore airlines takes delivery of the first a380 in october. lufthansa will begin regular service with the a380 from frankfurt to jfk in the summer of 2009

    新加坡航空公司已於10月提第一a380飛機。漢莎航空公司將於2009年夏開通法蘭克福至jfk的定期航
分享友人