起吊應力 的英文怎麼說

中文拼音 [diàoyīng]
起吊應力 英文
handling stress
  • : 起Ⅰ動詞1 (站起; 坐起) rise; get up; stand up 2 (取出; 取走) draw out; remove; extract; pull 3...
  • : hangsuspend
  • : 應動詞1 (回答) answer; respond to; echo 2 (滿足要求) comply with; grant 3 (順應; 適應) suit...
  • : Ⅰ名1 (力量; 能力) power; strength; ability; capacity 2 [物理學] (改變物體運動狀態的作用) forc...
  1. Destabilization style of an arcuated built - up system bridge, influence of nonconservative force of hanger rods, comparative between stress value in construction stage and stress value in finished bridge stage, stability coefficients in bridge code, these are discussed deep

    著重對失穩類型、橫撐在穩定中所的作用、桿非保向的作用以及施工階段的和成橋階段的比較、規范中穩定安全系數的規定進行探討。
  2. Thedevelopment development hydraulic jack, the bearing heater, thebearing get up pulling out, the hydraulic pressure spanner, thehydraulic pressure pulls a horse, the hydraulic pressure small crane, nut broken cutting, the oil filter machine and the pipe bendingmachine and so on the advanced practical mechanical and electricalservice product has the world advanced level, the product and thetechnology widely applies to domain the and so on electric power, petrification, chemical industry, metallurgy, mine, spinning andweaving, papermaking machinery service department and the machinemanufacture unit, and in the daya bay nuclear power station, beijingsteel corporation, wuhan steel corporation, the baoshan steelcorporation, the daqing oil field, the victory oil field, the golmudoil field, the three gorges power plant, yangzi petrifies, qi and lupetrifies and so on in the national large and middle scale enterprisesand the project the comprehensive promoted use

    研製開發的液壓千斤頂,軸承加熱器、軸承拔器、液壓扳手、液壓拉馬、液壓小車、螺母破切器,濾油機和彎管機等先進實用的機電維修產品有世界先進水平,產品和技術廣泛用於電、石化、化工、冶金、礦山、紡織、造紙等領域的機械維修部門和機械製造單位,並在大亞灣核電站、首鋼、武鋼、寶鋼、大慶油田、勝利油田、格爾木油田、三峽電站、揚子石化、齊魯石化等國家大中型企業和工程中全面推廣使用。
  3. On the contents of two sides abovementined, this paper attempts to do some initial researches from three angles as follows : 1, the analyses of anti - seismic features on longitudinal direction of the aqueduct l ) the seismic longitudinal effects are small. the vibrant characters are decided from the structure integration and rigidness of piers and main arch - ring of the aqueduct, so the following measures should be taken in order to weaken and isolate seismic influence : properly broadening the section sizes and adopting the high class concrete, lowering the height and barycenter of building, setting hoop steel bars so as to increase the plasticity of the concrete which can absorb the seismic energy and prevent the damages due to stress centralization on the linkages and changing place

    本文試圖就上述的這兩大方面的內容,從以下三個角度進行了初步研究: 1 、縱槽向抗震性能分析1 )湯峪河桿拱支承結構的縱槽向地震效較小;桿式拱架結構動特性取決于槽墩和主拱圈的剛度,以及結構的整體性,故適當加大構件截面尺寸或提高砼標號,盡量降低結構的建築高度和重心,在構件連接和變截面處增設梗脅,按照約束混凝土的要求來加強箍筋的配置,增加砼的延性,以克服地震時構件連接和變截面處的集中造成的坡壞,並吸收大量的地震能量,從而到隔震,減震的效果。
  4. Lifting hooks - mechanical properties, lifting capacities, stresses and materials

    鉤機械性能重量及材料
  5. Lifting hooks ; materials, mechanical properties, lifting capacity and stresses

    鉤.材料機械特性承載能
  6. Problems in using screw - crane in fields and water resources engineering were analysed with examples of engineering project. based on this, a method was presented. by using double - hook screw - crane and connecting two screw - cranes by an intermediate bearing and a gear coupling, the problem of inefficiency in door - closing was solved. the double - hook screw - crane could work synchronously

    以具體工程為例,在分析了螺桿啟閉機在農田水利工程中用時存在的問題及原因的基礎上,提出採用雙點螺桿啟閉機,用中間軸與齒輪聯軸器把2臺螺桿啟閉機連接來的方法,成功地解決了單點啟閉機閉門不足的問題,實現了雙點螺桿啟閉機工作時的同步
  7. With consideration of variety of magnetic circuit in permanent magnet bearings, a new mathematical model dynamic magnetic circuit is presented, which has been widely used in the design of lifting permanent magnetic crane

    考慮到永磁軸承工作時磁路的變化,探索性地提出採用常用於重永磁設計的動態磁路法來分析永磁軸承的學特性,並給出了相的數學模型。
  8. The tower shafts, most of which are hollow and varying in cross section, and altitudinal construction bring trouble to the form work and the stress of strand wire. and the cracks on the crossbeams will be caused by the following - deformation of the bracing structure joints, elastic deformation , uneven settlement and temperature changes. the additional stress of the base slab and the foundation is caused by the deviation of cable bent tower construction

    但大跨度橋梁混凝土索塔施工設備進場及現場管理都比較困難;塔柱多為空心變截面,且為高空作業,給模板工程及預張拉帶來一定困難;支撐系統連接的間隙變形、彈性變形、不均勻沉降以及環境溫差可導致橫梁裂縫;索塔施工偏位會引的承臺和基礎的附加,對加勁梁的架設影響大;懸結構未完體系(架設時)施工階段的風致振動往往影響到施工的安全和質量;實心塔柱部分體積較大,易產生溫度裂縫。
分享友人