起重機臺 的英文怎麼說

中文拼音 [zhòngtái]
起重機臺 英文
crane platform
  • : 起Ⅰ動詞1 (站起; 坐起) rise; get up; stand up 2 (取出; 取走) draw out; remove; extract; pull 3...
  • : 重Ⅰ名詞(重量; 分量) weight Ⅱ動詞(重視) lay [place put] stress on; place value upon; attach im...
  • : machineengine
  • : 臺名詞(指臺州) short for taizhou (in zhejiang province)
  • 起重機 : crane; derrick; crab; freight elevator; hoist; lifter; cranage; hoister
  • 起重 : jack up起重臂 jib loading boom; cargo boom; erector arm; jibboom; 起重車 carriage hoist; crane ca...
  1. Recently, several ten sets of crane, leveller, extrusion press, excavator about 3000t mechanical equipments have been exported to the world - wide more than 20 countries

    近年來,已經有數十、矯正、擠壓、挖掘,約3000多噸械設備出口到世界20多個國家。
  2. With the proposed method, the optimal design of crane booms made of high strength alloy tubes used for drilling platform is carried out in order to obtain the lightest crane booms

    對採用高強度鋼管研製的某海洋鉆井平臂架進行優化設計,獲得了最輕自臂架的最佳設計方案。
  3. Vertical transportation : reinforcing steel bar, from and so on materials should use self - lifting tower crane and one 50t crawler crane

    垂直運輸:鋼筋、模板等材料使用自升式塔式,並配備一50t履帶式
  4. The truck crane ( gantry crane, tower crane, mobile slewing crane, bridge crane, crawler crane ) can lift a weight of 15 tons

    汽車(龍門吊、塔式吊、懸臂汽車吊、橋式吊、履帶式)能吊15噸的物。
  5. The total area of the corporation covers about 200 chinese acres and the length of coastline is about 1, 140 meters, the auxiliary facilities have taken shape the main facility and the equipment include the 30, 000 dwt dry dock which is 192 meters long by 40 meters wide the gate width 32 meters and 10 meters deep, is to date the biggest dry dock in fujian province ; one fitting wharf length 65 meters, width 17 meters ; 16 tons portal crane 1 set, 16 tons gantry crane 1 set, mobile cranes 50t1 25t1 12t2 8t4 and other necessary transportation, coatings, the precision work equipment supplying air 120 m min, spraying grit more than 4, 000 m day, renews the steel plate 12 15 t day we can finish repairing all kinds of ships under 40, 000 dwt within 7 to 10 days our corporation obtains the first - class dockyard to repair and build steel - made ships lisence in 2001, passed the national environmental protection appraisal in august 2002, was designated shipbuilding in fujian for maintaining foreign ships in octobet 2002, the dry dock, passage channel, the turning area, fitting wharf are passed by passage safety appraisal in march, 2003

    主要設施和設備有: 3萬噸級干船塢一座長192米寬40米塢門凈寬32米深10米是福建省目前最大的干船塢舾裝碼頭一座長65米寬17米16噸門座110噸門吊1汽車吊850噸125噸112噸28噸4以及與其相配套的運輸噴塗精加工設備。每分種供氣120立方米,日噴砂面積4000多平方米,日換鋼板15 20噸。一般修船工期為7 10天。
  6. 50t car crane and two korea modern 1. 6m

    噸汽車韓國現代
  7. A junk sailing on huangpu river near the largest crane of the shanghai shipyard

    黃浦江里的一艘舢板駛過上海船廠最大的一
  8. Work platforms suspended from cranes or derricks - safety requirements

    或轉臂的懸吊工作平.安全要求
  9. In addition, the probability analysis for a crane is conducted by using the famous software ansys

    此外,運用有限元分析軟體ansys對一龍門進行可靠性分析。
  10. Compare of service performance for two gantry mounting crane

    高架門座的使用性能比較
  11. Users needn ’ t establish the model themselves. through the verification of practical engineering projects, the program afforded by this article is simple and easy to use, as well as accurate and reliable

    運用本文開發的格構式動臂港口輪胎結構參數化計算分析平對qly50港口輪胎式進行參數化建模分析,驗證了本參數化設計分析平的有效性和實用性。
  12. Through deeply comprehending the theory of structure calculation of the crane and secondary development technology, especially how to realize the method of structure analysis and calculation of the port tyre crane, i succeed in parameterized finite element modeling of the port tyre crane body and boom based on apdl

    該平參數化、模塊化建立港口輪胎式的有限元模型,可方便地進行力學分析,為港口輪胎式的設計研發提供一個快速、準確的參考結果。
  13. Based on the deep analysis of the reasons of the cracking of the gear table cylinder of the 16t - 33m portal crane, this paper puts forward the repairing way of the cylinder and fully calculates to confirm

    基於對16t ? 33m門座式筒體開裂的原因的深入分析,論文提出了筒體修復方案,並給以充分地計算論證。
  14. Abb , the leading power and automation technology group , has received contracts worth more than $ 65 million to supply automation and electrical systems for 74 shipping cranes that will help raise productivity at ports in asia

    全球領先的電力和自動化技術集團abb近日獲得了6500萬美元訂單,為74集裝箱裝卸提供自動化與電力系統,此舉將會提升亞洲港口的生產效率。
  15. This paper presents static and dynamic measures against different wind disasters for large harbor cranes and a complete anti - wind / typhoon disaster safe management system in shanghai port

    摘要根據港口大型設備受風災的類型,具體介紹了港口大型的靜態、動態防風的設施和技術手段,以及上海港建立的一套完善有效的防風防安全管理體系。
  16. In detailed work of visual assemble design, according to organization of crane ’ dolly, author applys bed assembly technology by secondary development of soli - works, that means small assemblys assembled first then big organs and the whole dolly last. we can modify the assemble or parts ’ parameter and replace parts in time by designing user dialog box. meanwhile, the paper contains development of assemble collision detection. algorithmic efficiency has a close connection with running speed

    本文在進行虛擬自動裝配開發時,根據構組成特點,採用分層裝配的規劃設計思路,先由單個零件組裝成小部件,再由小部件組裝成大部件,最後將各部件組裝成整小車。裝配中的關鍵技術是利用輔助特徵構造裝配選擇集和簡化裝配零件數量。
  17. Some 4000 workers and 100 cranes have gathered to build the hotel, residential and shopping complex of at least 700m which will include over 1000 luxury apartments

    這座將居住和購物集於一身的綜合性大廈至少將有700米高,內有1000套豪華公寓。為修建這座旅館共調用了大約4000名工人和100
  18. This paper discusses structure and feature of the crane traveling mechanism of a 1. 5t bridge type stacking crane at a warehouse, analyzes the existing problems and makes improvements to it referring to overhead traveling crane traveling mechanism

    摘要分析了某廠倉庫11 . 5t橋式堆垛大車運行構的結構、特點、存在的問題,並參考橋式大車運行構對其進行技術改造。
  19. In this study, we can simulate and optimize the uprising 、 rotating and ranging working situation of crane by kinematics and dynamics method. with the building of parameter experiment interface of simulating experiment platform, we can modify the parameter of hydraulic power system and realize experiment analyzing when actual working parameter of crane is changed

    通過該研究能夠對械繫統實現升、回轉、變幅工作的運動學和動力學模擬試驗和優化設計,並通過模擬實驗平的參數化實驗界面的建立,實現對液壓動力系統參數修改和實際工作參數變化條件下的試驗分析。
  20. Test method for the harbour fixed crane and the harbour pedestal crane

    港口固定起重機臺試驗方法
分享友人