超壓地層 的英文怎麼說

中文拼音 [chāodecéng]
超壓地層 英文
overpressured formation
  • : Ⅰ動詞1 (越過; 高出) exceed; surpass; overtake 2 (在某個范圍以外; 不受限制) transcend; go beyo...
  • : 壓構詞成分。
  • : i 量詞1 (用於重疊、積累的東西 如樓層、階層、地層) storey; tier; stratum 2 (用於可以分項分步的...
  1. The quaternary system is characterized by high geothermal gradient, with low scope of overpressure in its deep and shale caprock saturated with formation water of high salinity

    第四系具有較高的溫梯度,深部發育了低幅;甘森泉小柴旦基底斷裂影響氣藏構造的完整性;第四系飽含高礦化度水泥巖構成的蓋可以起到一定的封蓋作用。
  2. We established geological and mathematic model for the relief of overthrust fault and earned out simulation computation after selecting factors. the result is that pressure can be released when fault is open. but ft will take a long time for the formation pressure to be relieved to normal formation pressure

    建立了逆掩斷質模型和數學模型,選取參數后進行了模擬計算,結果表明逆掩斷活動開啟釋放力,但要將力釋放到正常力需要時間較長,在斷裂活動時期不足以將圈閉中釋放掉,這是庫車坳陷能夠保存的另一主要原因。
  3. In this paper, according to the properties of secondary gas pools and the inclusion data, the secondary gas pools are though to be formed due to the leakage of the original gas pools penetratin through the regional caprock when the overpressures within lower overpressured strata release

    結合包里體測試計算,認為期形成原因主要是由於下部超壓地層進行釋放,從而在區域性盈內部形成一系列泄道,原生氣藏泄漏而形成的。
  4. Under the upper pressures belt or minute super pressures of the upper triassic series and jurassic system interface formation, the fluid in the upper triassic series moved along stratum interface, fault and crack network thoroughfare, formed " secondary gas pool " in the jurassic system

    上三疊統和侏羅系界面形成的帶或微帶,使上三疊統氣藏流體在力差的作用下,沿斷界面和裂縫網路通道運移,在良好的侏羅系圈閉中形成「次生氣藏」 。
  5. Abstract : overpressure was thought to be existed in the shallow layer of songliao basin because several - hundred - meter - think regional shaly rock distributes steadily in qingshankou formation, nen and nen members

    文摘:松遼盆被認為是存在的,因為青山口組和嫩一、二段穩定分佈著幾百米厚的區域性泥質巖
  6. According to those analysis and the background of geological evolution of basin, the kind of hydrodynamics was regarded as compaction before y3 and then as compaction - osmosis after y3. futhermore, the key time of oil and gas reservoir formation was summarized, it is furthermore, the main cause of high pressure formation was believed that the compaction was not enough in paleogeothermal gradient, meanwhile, analyzing the cause of the low pressure nowadays, it was the uplift and erosion of stratum or pressure divulgence because of seal and so on

    另外,還確定油氣成藏的關鍵時期為伊敏組沉積末。再者,認為欠實是最大埋深狀態下,形成的主要原因,同時分析了形成現今負(低)的原因,其原因為抬升剝蝕、力因封閉的泄漏等。最後,恢復出各主要目的的古流體勢的演化歷史,從伊敏組末至現今,油勢分佈特徵具有較好的繼承性。
  7. Through analyzing the in - situ data such as total settlement, layered settlement and pore water pressure, the actual deformation behavior of soft foundation are mastered. after summarizing the methods of predicting settlement of soft foundation and bring forward a method to predict the post construction settlement of the surcharge preloading soft foundation. and the engineering application of the predicting foundation settlement based on “ law of massaction ” and the traditional predicting methods are compared, the results shows that the model is useable and it deserves more validation in more projects

    本文以深圳灣軟基處理工程試驗區為背景,通過對淺沉降、分沉降、孔隙水力等資料的分析,掌握了軟基變形的實際性狀;在總結軟基路堤沉降預測方法的基礎上,探討了軟基載預工后沉降預測的參數反演法;並對基沉降預測的「質量作用定律」模型的工程應用與傳統的預測方法進行了對比,驗證這種方法是可行的,得出了一些有用的結論。
  8. Yingxian ancient wooden pagoda is a flat - form tall building, which was formed by the superposition of monolayer temples. the height of 67. 31 meters made it encountered two unprecedented puzzles : firstly, with the height increased whopping, wind resisting and aseismatic capability become the main question of the whole structure ; secondly, because of the weight increased unconventionally, members of the lower 1 ~ 3 floors hold overloading perpendicular to grain and they brought large vertical deformation

    相對於一般殿堂結構,高度和自重的成倍增加,使木塔遇到前所未有的兩項難題:其一是因自重增加,使承受上柱軸向荷載的梁(普拍枋和梁? )橫紋局應力成倍過設計強度而產生嚴重的縮變形甚至劈裂,導致木塔整體豎向變位。
  9. The gas chimney can be applied in hydrocarbon exploration in terms of ranking prospects, detecting migration pathways, distinguishing sealing or non - sealing faults, identifying potential over - pressured zone and drilling ( shallow gas ) hazards as well as assessing the sea floor stability for platform design and drilling

    氣煙囪在油氣勘探工作中有其獨特的作用,可以有效預測勘探方向、揭示天然氣的運移路徑、預測斷的封閉性,同時利用氣煙囪還可以預測和海底構造穩定性,降低淺氣鉆探風險。
  10. Based on comparison of several technical schemes, the method of sand bedding pre - elevating and step water - filling pre - compressing is adopted. so the dissertation is consist of two parts : ( 1 ) the applicability study for the method of sand bedding pre - elevating and step water - filling pre - compressing, including numerical analyses for the thickness of sand bedding, the consolidation, settlement and stability of foundation, drainage, possibility of foundation liquefaction under seismic loading, et al. ( 2 ) monitoring at construction stage and checking the effect of foundation treatment, including the measurements of the settlement velocity and non - uniform settlement of ring beam under the tank, pore pressures and horizontal displacements in foundation, the pressure distribution at the bottom of oil tank and the strength increase of soils

    通過多種技術方案比較,最終選擇了技術先進的砂墊預抬高分級充水預法,論文工作主要由以下兩部分組成: ( 1 )砂墊預抬高分級充水預法的適用性研究,其中包括砂墊厚度、基沉降與固結度、基穩定性、降水、震作用下砂土液化的可能性等方面的計算分析; ( 2 )施工監測與基處理效果檢驗,其中包括油罐環梁基礎沉降速率與不均勻沉降程度、各分級充水加載階段靜孔與深水平位移、油罐底板力分佈及基土強度增長等方面的實測與數據分析。
  11. Nonce, the system of diagenetic numerical modeling for the stratum under the conditions of normal pressure has been set up. in lots of sags rich of petroleum in the basins of eastern china, such as qibei sag of bohaiwan basin, there are plenty of deep - buried overpressure reservoir

    但在中國東部許多盆的富油氣凹陷,如渤海灣盆歧北凹陷,油氣藏分佈在深超壓地層中,條件下成巖作用的數值模擬尚不完善,更不用說孔隙度預測了。
  12. Through analyzing bed ' s response to wave, in the condition that super - stratum is more hard and second - stratum is more soft in region of interest, super static interstitial hydraulic pressure amplitude die away rapidly between stratums, before in sight of boundary between hard and soft stratum, plane effective pressure increase to max. shear stress reach peak value when bed thickness is approximately 2. 7 meters, then it will decrease to the minimum on the place where the flexible soil has a common boundary with the rigidity, so the boundary is the most destroy plane on engineering. on the basis of reconnaissance in situ, in normal situation of sea, the structure slides to the basin along the boundary

    通過對底床在波浪下的響應分析,對于研究區底床上較硬而第二較軟的情況,靜孔隙水力幅值在間交界處迅速衰減,在臨近硬、軟交界處前,水平有效應力增至最大,剪切應力在底床厚度大約2 . 7米左右達到峰值,然後減小,到硬、軟土交界位置,達到最小,因此這個界面就是最容易發生破壞的工程軟弱面,現場勘查證明,即使在正常海況下,構築物也會沿坡以此交界面為滑動面,緩慢向「盆」底滑動。
  13. Conclusions as following have got through test study : ( 1 ) when impact compaction technology is applied to treat collapsible loess subgrade, the effect depth may be treated generally can not override 80 cm and impact compaction pass is optimum at 30 times. ( 2 ) for stratified impact compaction of subgrade, when compactness of each level reaches codeslstandards loose laying depth of 80 cm fits 40 impact compaction pass is the optimum combination of subgrade construction. when average compactness in each level reaches codeslstandards loose laying depth of 80 cm fits 30 impact compaction pass is the optimum combination o ( 3 ) the quality control method may request impact compaction pass as the main control index and at the same time the final division settlement is less than 10 % of total settlement as large area subgrade is constructed

    通過試驗研究主要得出如下認識:沖擊實技術處理濕陷性黃土基時,其有效處理深度一般不過80cm ,沖遍數以30遍左右為宜;對路基分,在要求土體中各點實度均達到規范要求時,路基沖最佳組合為虛鋪厚度80cm 、沖40遍;在只要求土體平均實度達到規范要求時,路基沖最佳組合為虛鋪厚度80cm 、沖30遍;大面積施工時,質量控制方法可按照在以沖遍數作為主要控制指標的同時,要求最後10遍分計沉降量小於累計沉降量10 ;在施工單位自己購置沖擊實機情況下,與傳統施工相比較,沖擊實技術是一種既能節約資金又能大量縮短工期的施工方法。
  14. That is, the partially penetrating sand drain ground is viewed as the double - layered ground, and its consolidation is analyzed with 1 - d consolidation theory, through the transformation from 3 - d consolidation to 1 - d consolidation in the region of sand drain. this can overcome the disadvantage that the excess pore water is discontinuous between the region of sand drain and under - lying soft layer. to the double - layered ground, based on the consolidation mechanism under surcharge, the excess pore water pressure calculation formula is deduced under the condition of multilevel equably loading or unloading, which perfects the consolidation theory

    然後,在充分考慮豎井區井阻、塗抹作用以及土體結構損傷破壞對固結影響的基礎上,將未打穿豎井基合理轉化為雙基,按一維固結理論計算,克服了傳統固結計算方法在豎井處理區與下臥交界面處存在孔間斷的缺點;在此基礎上,從載預法的基本原理出發,分析了雙載預固結、沉降機理,推導了多級等速加、卸載情況下雙基的固結計算公式,進一步完善了雙基固結理論。
  15. The study shows that besides boundary conditions, the factors influencing the nonlinear consolidation behavior of soils are the compression index cc, the permeability index ck, the level and the rate of loading, and the thickness of soil, etc. in nonlinear consolidation, especially for layered soils, the average consolidation degree defined by settlement, us is greater than the one defined by effective stress, up, i. e., the rate of the development of settlement is greater than that of the dissipation of excess pore water pressure

    研究表明,除邊界條件外,影響軟土基一維非線性固結性狀的主要因素是縮指數c _ c 、滲透指數c _ k 、荷載大小與加荷速率、土厚度等。對于非線性固結,特別是成基,按沉降定義的平均固結度u _ s大於按有效應力定義的平均固結度u _ p ,即沉降發展速率要快于靜孔消散的速率。
  16. 2. the variation of formation compression during subsidence during the subsidence there are hydrostatic pressure and abnormal pressure zones in vertical

    2盆沉降過程中力的變化盆沉降過程中,力在垂向上大致分為靜水力帶和異常帶。
  17. Furnished with the germany - imported 5 - roller calender production line and the related technical software, plus the latest technical standard in taiwan and west germany, jiangyin hongkai plastic co., ltd. is specialized in a variety of special - typed sheet products of credit card layer, chip base, subway cards, remembrance cards, advertising cards, membership cards, file plates, file s rolled chips and color double super dull printing sheets, all kinds of intelligence cards, ic cards, contactless cards and other applications of pvc card sheets. with the 8, 000 tons of annual output, these productions are applied extensively and fairly competitive in both domestic and overseas markets

    江陰宏凱塑膠有限公司引進德國製造五輥延機生產線及技術軟體,採用國際最新的技術標準,專業生產經營pvc信用卡面片基,鐵卡電話卡等單卡片材,紀念卡廣告卡會員卡吊牌基材文件夾卷晶元及彩色雙面級消光印刷片基材,各種智能卡ic卡非接觸卡燈箱片等各種用途的pvc卡片基材,屬國際國內高檔次高技術含量產品,應用面廣,具有很強的國際國內市場競爭能力,年產量達8000噸。
  18. Researches show there are many types of strata pressure, super pressure in certain depth below the bottom of the jurassic stratum, and also overpressure in the whole jurassic stratum in central and southern of mosuowan salient

    研究表明該力類型豐富,侏羅系底部及以下在凹陷內一定深度以下普遍發育高,在莫索灣凸起的中南部侏羅系則整體處于狀態。
  19. A quantitative evaluation for excess pore pressure and wellbore stress around a cased well under steam injection

    熱采過程中孔隙力與井眼應力的定量評價
  20. Gas chimney is one of seismic anomalies resulted from vertical fluid migration, which is the interactional outcome due to overpressure, low stress and shale harrier

    摘要氣煙囪是由於天然氣(流體)垂向運移在震剖面上形成的含氣異常現象,是氣藏、構造低應力部位和泥頁巖封隔3種因素綜合作用的結果。
分享友人