超載水準 的英文怎麼說

中文拼音 [chāozǎishuǐzhǔn]
超載水準 英文
overload resolution
  • : Ⅰ動詞1 (越過; 高出) exceed; surpass; overtake 2 (在某個范圍以外; 不受限制) transcend; go beyo...
  • : 載Ⅰ名詞(年) year : 一年半載 six to twelve months; six months to a year; 三年五載 three to five ...
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : Ⅰ名詞1 (標準) standard; guideline; criterion; norm 2 (目標) aim; target Ⅱ動詞1 (依據; 依照)...
  • 超載 : overload; excess freight; supercharge load(ing); overloading; superload
  • 水準 : standard; level
  1. Raise the emission standards for certain classes of newly registered motor vehicles to euro iii levels and require installation of on - board diagnostic system for newly registered petrol vehicles of not more than 3. 5 tonnes in parallel with the european union

    與歐盟的步伐一致,把若干類別的新登記車輛的排放標收緊至歐盟iii的平,並規定新登記的重量不逾3 . 5公噸的汽油車輛必須裝有車自我診斷系統。
  2. The main work of this paper was as fellows : ( 1 ) generalized the development of pre - stressed steel structure in our nation and abroad, and pointed out the main problem in practice ; ( 2 ) presented the mechanism of pre - stressed steel structure and revealed its applicable range ; ( 3 ) established the optimization design model for pre - stressed steel structure, which accounts for constraints on stresses and displacements of structure ; ( 4 ) brought forward the optimization design method, which combined linear programming and the principle of full restriction, through which we can obtain the magnitude of each time pre - stress and the optimized sections of each members of structure ; ( 5 ) analyzed the best times of pre - stress and pointed out that 2 ~ 3 times is preferable ; ( 6 ) conducted optimization design on large - space steel roof, horizontal parallel steel truss with local cables, horizontal parallel steel truss with global cable, and ultra - static steel truss, the result of which indicated that the multiple pre - stress structure is very economic ; ( 7 ) compared different schemes of cable placement for horizontal parallel steel truss, and the results showed that the local cable only unloaded the second girders, but had no response on the first girders and stomach poles, while global cable could unload the second girders and the stomach poles outside of turning point of cable, thus proving that global cable is more economic than local - cable

    本文的主要工作是:對國內外預應力鋼結構的發展歷史及現狀作了綜述和總結,指出當前預應力鋼結構工程實踐中存在的主要問題;闡述了預應力鋼結構的受力機理,並指出預應力鋼結構的適用范圍和特點;在考慮結構應力和變位約束的條件下,建立預應力鋼結構優化設計模型;提出多次預應力鋼結構優化設計方法和步驟,採用線性規劃和滿約束則相結合的優化方法,可優化設計出施加的每一級預應力的大小,並得到結構各部分的優化截面;對多次預應力最佳的施加次數作了分析,並建議以2 3次為宜;為驗證文中理論和方法,分別對大跨多次預應力鋼屋架、局部布索的平平行弦鋼桁架、整體布索的平平行弦鋼桁架和局部布索的靜定鋼桁架等算例進行了優化設計,經濟效益明顯;對平平行弦鋼桁架的幾種施加預應力的方案進行比較,對于局部布索,預應力只對下弦起到卸作用,對上弦和腹桿基本不起作用;而整體布索預應力除對下弦卸外,對索折點以外部分腹桿也起到卸作用,經濟效益好於局部布索。
  3. Manufacture and development on assemble and movable partition wall, its function come up to advanced world standard. 3

    2 .研製開發了折裝式移動式活動隔墻,性能了國內標,部分達到國際先進平。
分享友人