超載荷重 的英文怎麼說

中文拼音 [chāozǎizhòng]
超載荷重 英文
surcharge load
  • : Ⅰ動詞1 (越過; 高出) exceed; surpass; overtake 2 (在某個范圍以外; 不受限制) transcend; go beyo...
  • : 載Ⅰ名詞(年) year : 一年半載 six to twelve months; six months to a year; 三年五載 three to five ...
  • : 荷名詞(蓮) lotus
  • : 重Ⅰ名詞(重量; 分量) weight Ⅱ動詞(重視) lay [place put] stress on; place value upon; attach im...
  • 載荷 : load; loading載荷變化 load fluctuation; variation in load; 載荷裝置 load device
  1. Abstract : experiments were made on a ultrasonic machining tool with work - piece adhered to ultrasonic transducer head, to machine micro - holes on hard and brittle materials such as soda glass and si, to study the effects of tool materials , work - piece materials , amplitude , machining load , slurry concentration , tool length and the size of work - piece on machining rate and wear ratio. in this experiment, the micro - tool was made through wedg

    文摘:通過以wedg放電加工手段製作微細聲加工用工具,在採用工件加振方式的微細聲加工機上對碳酸玻璃、半導體硅等硬脆材料試件進行微孔加工的實驗,來探討在某一特定加工條件下工具材料、工件材料、工件的振幅、加工靜、磨料懸浮液濃度、工具長度及工件尺寸等要因素對加工速度、工具損耗率的影響,為微細聲加工技術的實用化提供參考依據。
  2. This paper related to a practical project that a high school is big bay building with teaching, experiment and studying, aim at the higher seismic fortification criterion region ( 8 degree of seismic fortification intensity ), aseismic disadvantageous building site ( iii type site ), and the building loading much ( the building " self - weight is over the 9. 0 kn / m2 ). compared to r. c. rectangle columns, studying the aseismic performance of the r. c. special - shaped columns pure frame structure, the r. c. special - shaped columns frame - truss structure and the r. c. special - shaped columns frame - shear wall structure

    本文,結合某中學大開間教學實驗綜合樓的具體工程,就抗震設防烈度較高地區( 8度)和抗震不利的建築場地(類場地) ,並且建築物所受較大的情況(建築物自過9 . 0kn m ~ 2 ) ,通過與矩形柱分析比較的方式,研究了異型柱純框架結構、異型柱框架-桁架結構,以及異型柱框架-剪力墻結構的抗震性能。
  3. In redundancy structure, the structure ' s distortion and strain will change along with time because of creep. according to the characteristic of concrete ' s creep, the creep grows quickly in the concrete " earlier age. for the long of bridge ' s construction period, the concrete ' s age of different part are discrepantly

    靜定結構中,結構的變形和內力都會因徐變而隨時間不斷變化,對于實際的工程結構,結構的整體總是分階段建造起來的,某些(如自)也是在結構建造過程中分階段作用在不斷生長的結構上的。
  4. According to the development of the society and economy, pile foundations have played more and more important effects in the development of modern civil engineering. at present, pile foundations in the offshore petroleum platforms, super high - rise buildings and long span bridges, should not only bear vertical loads but also accept horizontal loads to adapt high, heave, large buildings

    目前我國海洋石油平臺、高層建築、大跨度橋梁等中所使用的樁基礎不僅能承受巨大的豎向,而且能承受較大的水平,以適應現代建築物高、、大的要求。
  5. Besides problems with planks and guardrails, the main causes of injuries and deaths on scaffolds are poor planning for assembling and taking them apart, missing tie - ins or bracing, loads that are too heavy, and being too close to power lines

    除了腳手板和防護欄桿的問題外,主要受傷和死亡的原因是由於安裝和拆除的方案低劣,連接點和支撐桿件缺失,和離電纜線太近所致。
  6. The load on the platform must not exceed the indicated capacity

    平臺的負不能過所指示的負量。 (不允許。 )
  7. A load or burden that is too full or heavy

    過量或過或負擔
  8. Yingxian ancient wooden pagoda is a flat - form tall building, which was formed by the superposition of monolayer temples. the height of 67. 31 meters made it encountered two unprecedented puzzles : firstly, with the height increased whopping, wind resisting and aseismatic capability become the main question of the whole structure ; secondly, because of the weight increased unconventionally, members of the lower 1 ~ 3 floors hold overloading perpendicular to grain and they brought large vertical deformation

    相對於一般殿堂結構,高度和自的成倍增加,使木塔遇到前所未有的兩項難題:其一是因自增加,使承受上層柱軸向的梁(普拍枋和梁? )橫紋局壓應力成倍地過設計強度而產生嚴的壓縮變形甚至劈裂,導致木塔整體豎向變位。
  9. Finally, two examples show that, the availability and practicability of the new model is verified. the analysis of calculation result of berthiervill test embackment shows different part of compression curve have different influence upon the course of consolidation, and correct coefficient and viscous effect have great significance on deformation forecast. associated with the wenzhou airport runway engineering, the reason of increasing of pore - water pressuer in under - lying soft layer and post - construction settlement are given

    最後,通過兩個工程實例的分析來說明本文模型的有效性和實用性:一是對berthiervill填土試驗場的軟基實測數據和理論成果進行對比分析,闡明考慮結構性擾動和粘滯性效應對分析天然粘土固結壓縮性的要性;二是對溫州機場袋裝砂井預壓工程進行數值模擬,指出停預壓期間下臥層孔壓增加和工后沉降大的原因。
  10. According to our experimental investigations of varying load amplitude, it was found that the phenomena of fatigue crack growth retardation occurred for pmma material following a high overload cycle exerted among the regular constant amplitude load cycles, the ratio of peak value of overload to that of the regular cycles should be over at least 1. 35 to make the retardation taking effect. the experiment scheme for measuring the shutting - off ratio of overload ( defined as the overload ratio when da / dn < 10 - 7 / cyc. )

    本文試驗分析了變幅對裂紋擴展的影響,證實了有機玻璃也存在遲滯現象,通過金相觀察分析,提出遲滯的過程實際上是裂紋前緣萌生新的裂紋的過程的觀點,同時提出遲滯的合理的解析,並且給出遲滯比,為隨機下疲勞擴展模型的建立提供了一個要的參數。
  11. In the process of building and using the mass concrete structures, because of the effect of out - side condition and themselves, some faults will form in the structure, these faults will effect the bearing capability and endurance using nondestructive testing method to test the concrete ' s quality and diagnose its healthy, which has the significant sense in assessing the safety stability and research of the administering diseases this dissertation mostly researched the testing methods in the mass concrete structure, discussed the principles, methods, features, sphere of application of the ultrasonic testing in the mass concrete structure with faults, used dynamic fem to simulate the testing process, discussed when the concrete structure with cracks is under the effect of the pulse, how the elastic waves propagate and what are their changing feature, researched the principles of the first - arriving waves " phase when the cracks " depths are not same, obtained the relation between the inversion point and the cracks " depth, which has the direction sense in the application of projects, the second part of this dissertation is ct, which used the ultrasonic wave running through the tested - substance to get arriving - time of the ultrasonic wave, then inverse the image this dissertation drawed one ct program which can well present the different little cells " ultrasonic wave velocity profiles of the substance, thereby to diagnose the quality of the part of the tested - substance, ct has the better using foreground.

    在混凝土結構的施工及使用過程中,由於受其自身及外界各種因素的影響,常常會產生一些缺陷,對結構物的承能力和耐久性造成嚴影響,採用無損檢測技術進行質量檢測和健康診斷,這對混凝土結構開展安全、穩定性評估以及病害隱患治理研究具有要意義。本論文主要針對大體積混凝土結構缺陷的檢測方法展開研究工作,點討論了聲波法檢測混凝土結構裂縫的基本原理和方法及其特點、適用范圍,運用動力有限元數值模擬其檢測過程,探討了有裂縫缺陷的混凝土結構在脈沖作用下彈性波的傳播及其變化特徵,研究了不同裂縫深度下首波相位變化規律,得出了反轉臨界點與裂縫深度之間的關系,這對實際工程應用具有指導意義。聲波ct是一種新的無損檢測技術,它是利用聲波穿透被檢測體獲取聲波接收時間,來進行計算機反演成像的技術。
  12. The balanced chassis suspension of a multi - axle vehicle used in oil extraction was investigated in this paper. there are problems of overload on axles and poor passing in the vehicle when driving

    本論文應用計算機技術針對某型油田專用鉆機底盤使用中出現的后橋軸容易、通過性差的問題進行研究。
  13. Unless there are other means to prevent lifting a motor vehicle exceeding the capacity of the platformequipment, an overload device should be installed to prevent any movement of the platform and to give an alarm when the load on the elevating platform is in excess of the rated capacity

    如沒有採取其他措施防止平臺設備提升逾其負量的車輛,便須裝設過安全裝置,在平臺負逾其額定時停止操作,以及發出警報。
  14. ( 5 ) another is the long - term predict utilizing the biggest index number lyapunov in the chaotic time series and the whole space method during the steady period of the road foundation load, after the overload of the road foundation finished. meanwhile, contrasts with some mature settlement predict methods, estimating some important section in the engineering synthetically, making sure an ideal outcome of the predict warp, then unload the overload of road foundation and make it satisfy the design request

    ( 5 )路基完成後,在路基穩定期間內,利用混沌時間序列中的最大lyapunov指數和全域法進行長期預測,同時與一些比較成熟的變形預測方法進行對比,對工程中一些點斷面進行綜合評判,確定一個較理想的預測結果,從而對路基進行卸,使其滿足工程設計要求。
  15. With the expansion of reformation and opening policy, transportation trade in our country has developed very quickly. traffic is heavy and the load of vehicle is growing, which greatly exceeds the value of highway vehicle. so some roads have to be used over its design parameter and some bridges are damaged

    隨著我國改革開放的不斷深入,交通運輸業有了突飛猛進的發展,公路交通量和汽車量日益增加,遠遠出了當年的設計計算值,致使公路橋梁遭到了不同程度的破壞,但仍在使用,改造和加固這些限服役的橋梁迫在眉睫,如何找出一條既合理,又省錢,又不斷交(省時)的加固方案,已是公路建設者們的一道課題。
  16. The standard in bridges " designing load in xuanhua - datong speedway is auto - super 20, trailer - 120. because of transiting carrying coal vehicle mostly, investigating and measuring all vehicles carrying coal in 109 and analyzing and checking strength and intension of new bridges. in this way, ensuring to advance loading measure of over load and assuring safely operation in bridges according to the standard in bridges " designing load

    宣大高速公路橋梁設計標準為汽車?20級,掛? 120 ,公路建成後主要通行運煤車輛,為此對現有高速公路旁全部的109國道運煤車輛進行調研、量測,並以此對新橋梁結構受力及強度進行了分析及驗算,以確定對車輛提出發措施,保證按高速公路橋梁設計標準設計的橋梁能夠安全運營。
分享友人