超高壓電網 的英文怎麼說

中文拼音 [chāogāodiànwǎng]
超高壓電網 英文
supergrid
  • : Ⅰ動詞1 (越過; 高出) exceed; surpass; overtake 2 (在某個范圍以外; 不受限制) transcend; go beyo...
  • : Ⅰ形容詞1 (從下向上距離大; 離地面遠) tall; high 2 (在一般標準或平均程度之上; 等級在上的) above...
  • : 壓構詞成分。
  • : Ⅰ名詞1 (有電荷存在和電荷變化的現象) electricity 2 (電報) telegram; cable Ⅱ動詞1 (觸電) give...
  • : Ⅰ名詞1 (捕魚捉鳥的器具) net 2 (像網的東西) thing which looks like a net 3 (像網一樣的組織或...
  • 超高 : 1 (鐵路彎線的外軌加高) superelevation2 (船的出水高度) freeboard; freeboard height3 super high...
  • 電網 : electrified wire netting; live wire entanglement; power grid電網電源 electric network source; 電...
  1. The company is the electric member unit of enterprise " s federation of china ; member unit of construction technology branch of special committee of power transmission and transformation of chinese electrical engineering society ; national vltrahigh voltage give switchyard construction technical information unit and national power system, net explorer of network, to transmit power professional operation job unit, net explorer of network

    公司為中國力企業聯合會會員單位;中國機工程學會輸變專委會施工技術分會會員單位;全國送變施工技術信息員單位及全國力系統送專業運行工作員單位。
  2. With the advance of semiconductor manufacturing, circuits with increasingly higher speed are being integrated at an increasingly higher density, which makes analysis and verification of power grid integrity more important. power grid integrity includes four issues, namely, ir drop analysis, ground bounce analysis, ldi / dt from the pin inductance and em analysis

    隨著大規模集成路集成度和工作頻率的不斷提格完整性分析變得越來越重要,一般有四個關鍵問題: ir降分析、接地點勢上升( groundbounce )分析、來自引腳感的ldi / dt分析和子遷移率em分析。
  3. In 2004, koslo started business cooperation in china, which was the largest electric brand of foreign investment in china. there were two asian production bases in china respectively producing electric, lighting, net intelligence and low voltage electric accessories. in order to ensure the quality of products and enable each product to go beyond the market expectation, the production process were supervised by senior technical experts of koslo headquarters

    卡西洛氣2004年與中國建立合作發展的商業關系,是在華投資最大的外資工品牌,旗下在中國擁有兩家亞洲生產基地,分別致力於工照明,路智能事業和低氣附件事業,生產及過程由德國卡西洛總部資深技術專家進行科技質量監控,保證每件產品的質量,務求每一件從卡西洛集團生產的產品都能越市場期望
  4. Asynchronized synchronous generator is a new type of generator whose performances are significantly better than those of conventional generator. its appearance shows a new way to resolve the problem of continuous over - voltage on extra - high voltage electric network and the stability of power system with long transmission lines

    異步化同步發機是一種運行特性明顯優于普通同步發機的新型機,它的出現為解決超高壓電網持續工頻過和長距離輸系統的穩定性問題提供了新的途徑。
  5. While with the super hige voltage power network gradually built and the structure of system becoming more complex, the calculation time of optimization increases when the number of buses that need reactive power compensation is relatively large. especially, when the positions of compensation are uncertain, selecting the position of compensation can reduce time when reactive power optimizing

    而且隨著超高壓電網的逐步形成,系統結構日趨復雜,需要安裝無功補償設備的母線比較多的時候,優化計算所需的時間將加長;尤其是在路補償位置不確定的情況下,無功補償點的選擇就成為無功優化計算前節約時間的有效措施。
  6. In 2004, the company s technology development department has actively and successfully developed the shield - type american - style european - style cable heads, high - low - voltage cable branch cases for load switch busbar coupler system, outdoor ring network cabinets, box - type transformer substations and auxiliary products, which have passed the authentication one after another and been launched into the market in large batches, giving a strong support to the upgrading of the national urban power grids and the construction of key projects ; in 2006, the company has developed the four - splitting and dual - splitting wire and cable box and released to market ; the 2nd half of 2006, over 500kv ultra - high voltage electrical hardware being developed for 2007 market ; four products awarded national patents in 2006

    2004年公司技術開發部積極開發了屏蔽型美式歐式纜接頭,負荷開關母線聯接系統的纜分接箱,戶外環櫃,箱式變站及配套產品相繼通過鑒定,大批量投入市場,有力支持國家城改造與重大工程建設2006年公司又研製出四分流二分流纜分線盒,已投放市場2006年下半年,正在研製開發500kv及以上力金具,有望2007年投放市場2006年有六種產品已申請國家專利。
  7. In accord with the state standard about harmonic. the harmonic permission value of tangqian line is calculated. some measurement data are shown and analyzed, and some main conclusion is drawed that the 7th harmonic voltages of tangqian line is near to the permission value, total harmonic voltage distortion ratio has oversteped the permission value. the 3th harmonic, the 5th harmonic, the 7th harmonic and the 9th harmonic current from tangqian line all overstep the permission, the largest 5th harmonic current ratio in tangsc reaches 44 %, the 7th harmonic and the 9th harmonic current in tang7c and tangsc is large maybe because the harmonic current is magnified. this paper studies the model of each element in tang yin substation

    根據有關公用諧波的國家標準,計算出湯牽線注入湯陰變站的諧波流允許值,從實測數據可以得出一些重要結論:湯牽線7次諧波含有率的最大值接近國標中的限值,湯牽線的諧波總畸變率的最大值已標;湯牽線注入的3 、 5 、 7 、 9次諧波流都標;湯6c容器的5次諧波流含有率較,最達到44 ;湯7c和湯8c容摘要器的7次和9次諧波流含有率偏,原因可能是發生了諧波流放大現象。
  8. Based on the research project of my tutor the application of a new unified power flow controller in extra high voltage transmission lines operated in two phases, the existing principle of upfc and methods of the transmission lines operated in two phases, put the new upfc into hai - jin - jia 330kv extra high voltage transmission lines based on perfecting the framework of main net located in west of river in gansu which can improve the quality of electric power and ensure power transmission or transfer between the main net of gansu and the area of west of river

    本文綜合分析了海-金-嘉330kv線路在正常運行和故障情況下的諸多問題,在upfc的現有成果和非全相運行現有方案的基礎上,結合導師的研究課題? ?新型統一潮流控制器在線路非全相運行中的應用。提出在完善甘肅河西主架結構的基礎上,將新型的upfc應用於海-金-嘉330kv線路,可以較好的解決質量問題,確保甘肅主與河西地區的功率傳輸、轉換。
  9. ( 3 ) the law and characteristic of electromagnetic transient process for the switching overvoltage in the electric network of power stations have been studied by analyzing the electromagnetic transient process of switching overvoltage in power station and specially approaching the surge overvoltage transferred from the switchgear station through power transformers

    ( 3 )通過分析廠站操作過磁暫態過程及特性,特別是對開關站中的操作過通過升力變器傳遞的傳遞過進行分析研究,研究了廠站路中過磁暫態變化規律及特性。
  10. The following is the main points. haishrwan - jmchang - jiayuguan 330kv extra high voltage transmission lines is the weak line in gansu

    本文研究的主要內容如下:海石灣金昌嘉峪關330kv線路是甘肅中的薄弱環節。
  11. In order to compensate for the capacitive charging power of transmission lines, control reactive power flow, stabilize operating voltage and restrict arc current, the shunt reactors are usually installed on ehv transmission lines, especially for uhv transmission lines

    摘要、特線路為了補償線路的容性充功率,控制無功潮流,穩定路運行,限制潛供流等,一般要安裝並聯抗器。
  12. At first the summary in this thesis expounds a heated topic of power system researches ? flexible ac transmission system ( facts ), when the power system is becoming more and more complicated, super - high voltage big - volume and long - distance transmission power nets are developing, other new technology are applying, these factors are causing some side - effects, which are hard to solve through traditional measurement and technology

    伴隨著當代日益復雜的、大容量、遠距離輸的發展,這些新技術的應用,在提力系統安全用可靠性,控制更靈活、效率更等方面的同時,但也涌現出了一系列事與願違的副作用,這是用傳統的技術和手段難以解決的問題, facts正是為了迎刃而解這些力系統的難題而出現的。
  13. Changchun extrahigh voltage bureau must take haier as the model and found its own enterprise culture if he wants to buck for development, hold the future and try for achieving the national electrical network first - class enterprise

    本人認為,長春局要謀求發展、擁有未來和爭創國家一流企業,就必須以海爾為楷模,創建自己的企業文化。
  14. Zurich, switzerland, dec. 18, 2007 ? abb has won orders worth $ 440 million from the state grid corporation of china and other partners to provide new ultrahigh - voltage technology for the world ' s longest power transmission link

    瑞士蘇黎世12月18日消息? ? abb從中國國家集團和其他合作夥伴手上贏得了價值4億4千萬美元的訂單,為全球最長的力傳輸提供新的技術。
分享友人