跨度凈空 的英文怎麼說
中文拼音 [kuàdùjìngkōng]
跨度凈空
英文
clearance of span-
The zhaozhou bridge built in the daye period ( 605a. d. -618a. d. ) of the sui dynasty ( 581a. d. - 618a. d. ), with a clear span of 37 metres and small arches within the main arch, was the earliest spandrel arch bridge and also the longest stone arch bridge in the world.
中國隋朝大業年間(公元605-618年)建成的趙州橋,凈跨37米,主拱圈上敷設小拱,是世界上最早的空腹拱橋,也是當時世界上跨度最大的石拱橋。The zhaozhou bridge built in the daye period ( 605a. d. - 618a. d. ) of the sui dynasty ( 581a. d. - 618a. d. ), with a clear span of 37 metres and small arches within the main arch, was the earliest spandrel arch bridge and also the longest stone arch bridge in the world
中國隋朝大業年間(公元605 - 618年)建成的趙州橋,凈跨37米,主拱圈上敷設小拱,是世界上最早的空腹拱橋,也是當時世界上跨度最大的石拱橋。It is a top load bridge with a clear span of 288m, which is maximum one of the same structural system in asia. the main arch rib uses 8 steel tube of 920mm joined by web members and transverse truss to form a space truss. the soldier piles on the arch are made of bent frame to make the shape both artistic and novel
梅溪河大橋為一凈跨達288米的上承式鋼管混凝土拱橋,是目前亞洲同類橋型中跨度最大的橋梁,其主拱肋採用8根920mm的鋼管,通過腹桿及平聯形成鋼管混凝土空間桁架,拱上立柱亦採用鋼管混凝土排架,造型新穎美觀。The height of the room is increased. the height of the beam is decreased so that the net height of the room is increased, or the storey height and the total height of the building can be reduced. because of highly improved strength and stiffness, profiled bat - concrete structure can be applied to wide - span structure, heavily load structure and high rise building
梁截面高度減小,房間的凈空增加,房屋的層高與總高也有所降低。由於型鋼混凝土結構強度、剛度的明顯提高,可以應用於大跨、重荷、高層及超高層建築中。由於組合結構的一系列優點,所以其得到廣泛應用。分享友人