車間製造 的英文怎麼說

中文拼音 [jiānzhìzào]
車間製造 英文
shop fabrication
  • : 車名詞1. (中國象棋棋子的一種) chariot, one of the pieces in chinese chess2. (國際象棋棋子的一種) castle; rook
  • : 間Ⅰ名詞1 (中間) between; among 2 (一定的空間或時間里) with a definite time or space 3 (一間...
  • : Ⅰ動詞1 (做; 製作) make; build; create; produce 2 (假編) cook up; fabricate; concoct 3 [書面語...
  • 車間 : farm; shop; workshop; department
  1. 2 ) the function attributes of the workshop production plan and control system are also studied, that is to say, it is a complicated system including discrete and successive variables, and a great system which is ladder structure. affirmance, process time etc. can be found in the description of the production process

    2 )研究了面向訂單半流程生產計劃與控制系統的功能特徵:該系統是一個包含離散和連續變量的混合性系統,同時又是一個階梯形結構的大系統;在生產過程描述中含有「確認」 、 「加工時」等概念。
  2. When unexpectedly faced by war and lacking the time to create legions of troops, she turned instead to her mechanical skills and the city began manufacturing ballista

    當突然面臨戰爭,沒有時組建軍團之時,她求諸其機械技能,而本城也開始
  3. For decorating, cement and terrazzo floor, walls and walls and ceilings of workshops for producing beverage, food stuffs cosmetics, electronics, medines, electrical appliances, etc. and places which need to be free from basification and dust

    適用於電器、電子、機械、食品、醫藥、化工、煙草、飼料、紡織、服裝、傢具、塑料、文體用品等工廠的水泥或水磨石地面。
  4. For decorating, cement and terrazzo floor, walls and walls and ceilings of workshops for producing beverage, food stuffs cosmetics, electronics, medicines, electrical appliances, etc. and places which need to be free from basification and dust

    適用於電器、電子、機械、食品、醫藥、化工、煙草、飼料、紡織、服裝、傢具、塑料、文化用品等工廠的水泥或水磨石地面。
  5. The closure of the car factory had a knock-on effect on the tyre manufacturers.

    廠關閉后,輪胎商受到接的影響。
  6. The requirement analysis and system design are carried out according to the situation of nanjing sky electron co. ltd. at the same time, the key technology to solve the capability balance of the machine tool and scheduling system of the workshop production are studied, and a management model of the workshop production solved the corresponsive problem to finish the production task in time according to the current need in the enterprises

    然後結合一個典型的業企業? ?南京四開電子企業有限公司進行了系統的需求分析和設計。接著研究了企業級生產計劃管理模型,提出了一種以按時交付為目標的機床生產能力平衡與級生產計劃的控制方法,並對其中需要解決的關鍵技術進行了研究和討論。
  7. I feel that china isbecoming the epicentre of everything manufacturing, and in particular theautomotive industry - an industry that i have had running through my veins foralmost my entire working life

    我感到中國正在成為所有產品業的中心,特別是汽工業? ?一個我幾乎全部興趣和工作時都投入在其中的產業。
  8. Shandong tengzhou huacheng metal co., ltd. enjoyed free mport anf export right awaeded by the state evonomic and trade co mmissiom, with 20years histoy of specolozed in metalwork. our favtory lovated in beauty spot of honghe everglade near weoshan lake in the south - eest of shandong rovince. we regisstered fund is 22 800 000rmb, and thr acreagr id 30000 squares, anthe workshop is 12000 squares, with 358 workerd ( not include the 16 filiale ) but 21 of them are advanced engineers, advances technology, completely testing equipment, good quantity of produces, and advance technology about surface producing, under the spirit of together effort with our clients, our company would make a new view on the surface making in many fields, such as : airplane, vessel, armory, car, container and so on

    山東省滕州市華成金屬品有限公司是一家具有中華人民共和國自營進出口資格的企業,已有20多年專業生產金屬磨料的歷史,公司位於中國魯西南地區的微山湖紅荷濕地風景區,公司注冊資本2280萬元人民幣,工廠面積30000平方米,面積12000平方米,員工358名(不包括下屬16個分廠)其中高級工程技術人員21名,技術力量雄厚,質量檢測手段完善,產品質量穩定,具有先進的表面處理技術.公司本著與客戶共同努力的觀點,在材料和技術應用上不斷創新,不斷提高,把飛機,船,兵工,輛,集裝箱等行業的表面處理,強化,推向一個嶄新的局面
  9. Mes ( manufacturing execution system ) is information systems that reside on the plant floor between the planning systems in offices and direct industrial controls in the production manufacturing management process, which provides real - time information about the product planning, product tracing and resource allocation for the plant floor managers

    執行系統( manufacturingexecutionsystem , mes )是位於上層的計劃管理系統與底層的工業控制之的面向生產的管理信息系統。它能夠為管理人員提供生產計劃的執行、跟蹤以及所有資源的當前狀態等信息。
  10. Made some test cars during 1964 - 196, and carried on the test

    在19641967年期了一些試驗臺架,並進行了試驗。
  11. Are these made in this workshop

    這些都是在這個車間製造的嗎?
  12. In this thesis, we studied multi - agent based control architecture and scheduling for networked shop floor

    本文研究基於多agent ( mas )的網路化車間製造系統的控制體系結構和調度方法。
  13. As an important part of the manufacturing system, shop floor affects the agility and intelligence of the whole enterprise. its control architecture essentially determines the enterprise ' s production efficiency and competition ability in the market

    車間製造系統作為系統的重要組成部分,影響著整個系統的敏捷性和智能性,其控制結構在很大程度上決定著企業的生產效率和市場競爭能力。
  14. This paper deeply analysis the production management problems existing in the xac metal sheet part manufacturing workshop, and from the viewpoint of the computer aid production management, using the advanced management mode and integrating the aircraft part production characteristics, analysis and studies the integrated management of the manufacturing information, the organizing of the production plan and the control of the production process of the part manufacturing workshops that are under the cims environment, and also applies concrete system analysis, promotes general design plan and model establishing method

    本文主要是對西飛公司鈑金零件目前存在的生產管理問題進行了深入細致的分析,進而從計算機輔助生產管理的角度出發,運用先進的管理模式,結合飛機零件生產的特點,討論和研究了基於cims環境下零件車間製造信息的集成管理和生產作業計劃的組織和生產過程的控制,同時進行了具體的系統分析、提出了總體設計的方案和建模方法。
  15. To achieve information integration in manufacture process, this paper, with reference to dnc, researches into manufacture process information integration from 3 aspects : data level, function level, application level, presents the management information integration framework ( miif ) based on distributed control technology, builds meta - agent and application agent by regarding agent as an entity having special behavior ability and specific action objective, establishes agent control model, and then gives the collaborative solution. with field - bus technology and agent technology, the dnc system model based on agent technology is established which shows a efficient way of device integration. a general model of device integration is set up, and an agent model based on soft plug - in technology is built

    該模式包括面向過程的生產管理與控制的上層結構和面向設備的加工控制的下層結構;為實現過程信息的集成,本文從三個層面:數據層面、功能層面、應用層面上闡述了車間製造過程信息的集成方式,並借鑒dnc思想,建立了基於分散式控制技術的過程信息集成框架( miif ) ;採用面向對象方法,對miif中的代理體從定義抽象、結構和功能等進行了深入研究;從知識層面上的三個層次:語言規范、會話機制、問題域對miif的多agent協作進行研究,建立了多agent交互的形式化模型。
  16. We are the specialized wire and cable manufacturer, and the products are produced according to gb5023 strictly

    設有銅材, pvc電纜,品質、管理、產能在同行業處于領先地位。
  17. In automobile body manufacture process the cover panel design, the mold design and the manufacture processing occupies 60 % of the entire processing of automobile body design and the process. reduces this time for a while means speeds up the development of new vehicle type, and the cycle time of product puts in market

    過程中覆蓋件的設計和模具設計及加工占整個身設計和加工周期的60 %左右,縮短這一時就意味著加快新型的開發,縮短產品投放市場的周期。
  18. Partheno - genetic algorithm is employed in simultaneous invite - bid problem to avoid illegal chromosome in inheritance. shop floor markup language based on xml is presented as a describing language in communication among agents with extension of new performatives of shop floor based on kqml

    仰蛀2002年12月構建基於xml的標記語言,作為多agent系統通信的內容描述語吉,並在kqml原語的基礎上擴充了新的執行原語。
  19. All trams were assembled by hongkong tramways ltd. except cars no. 28 type c and no. 128 type d which were originally built by taikoo dockyard engineering ltd. in 1954 55 and rebuilt by hongkong tramways for charter and tourist duties in 1986 87. cars in group comprise nos. 1 - 27, 29 - 43, 45 - 119, 121 - 127, 129 - 143, 145 - 163, 165 and 166. they were built from 1987 to 1991 with underframes by w. j. brown engineering ltd. and bodies by full arts metal works ltd. 109 cars and leeway engineering and trading co. ltd. 51 cars

    這兩輛電由taikoodockyard engineeringltd .,在1954年至1955年出廠,在1986年至1987年,由香港電有限公司改裝為出租及觀光電, a款電包括第1 27號第29號至第43號第45號至第119號第121號至第127號第129號至第143號第145號至163號第165號及166號電,全部在1987年至1991年,底架由w . j . brownengineeringltd .供應。
  20. Cars in group comprise nos. 1 - 27, 29 - 43, 45 - 119, 121 - 127, 129 - 143, 145 - 163, 165 and 166. they were built from 1987 to 1991 with underframes by w. j. brown engineering ltd. and bodies by full arts metal works ltd. 109 cars and leeway engineering and trading co. ltd. 51 cars. leeway also supplied the body for car no. 120 type b which was built new in 1991 to the design of the previous generation of trams dating from 1949 : car no. 120 is a " heritage " tram, but is used in normal traffic

    ,在1954年至1955年出廠,在1986年至1987年,由香港電有限公司改裝為出租及觀光電, ( a )款電包括第1 ? 27號、第29號至第43號、第45號至第119號、第121號至第127號、第129號至第143號、第145號至163號、第165號及166號電,全部在1987年至1991年,底架由w
分享友人