軋機調整 的英文怎麼說

中文拼音 [diàozhěng]
軋機調整 英文
mill setting
  • : 軋動詞[方言]1 (擠) press hard against each other; push against2 (結交) associate with; make f...
  • : machineengine
  • 調 : Ⅰ動詞1 (配合得均勻合適) harmonize; suit well; fit in perfectly 2 (使配合得均勻合適) mix; adju...
  • : Ⅰ形容詞1 (全部在內; 完整) whole; all; complete 2 (整齊) neat; tidy; orderly Ⅱ動詞1 (整理; 整...
  • 調整 : adjust; tune up; trim; trimming; variation; modulation; arrangement; debug; rectification; redres...
  1. Abstract : the flying shear located behind the roughing stands of wire - rod mill is designed with hard surface gears for driving system, engaging of zero tolerance, hydraulic cylinder for clamping and shiftting, convenient and practical gap adjusting structure for blade

    文摘:介紹了邯鋼三廠在線材組后的飛剪設計中,採用了硬齒面齒輪傳動,零側隙嚙合,液壓缸鎖緊與橫移及簡便實用的剪刃間隙調構。
  2. Responding to the call of industrial policy adjustment in our country, yaoyu special steel company has started replacing hot - rolling with cold - rolling in the production of electric steel since 2003. it entrusted xinye gaoke group to make design and build the production line of cold - rolled electric steel with annual output of 200 thousand tons. after three years of construction, it has achieved the successful trial production of 20 - roll mill and continuous annealing and coating machine imported from germany

    耀宇特鋼從2003年開始,響應國家產業政策調的號召,開始電工鋼以冷代熱技改工程,委託新冶高科集團原冶金部鋼研院設計,進行年產20萬噸冷電工鋼生產線的建設,經過近三年的建設,目前從德國引進的20輥及連續退火塗層組均已試產成功,為提高產品的性能和質量,同時提升我國電工用薄鋼板的生產作出了卓越的貢獻。
  3. And it investigates the appearance condition ( including joint, crack, eroding, corrosion, braking pole device rupture, crane - girder ' s gnawing railway and so on ) of the whole crane - girder system on the spot, at the same time, it also actually examines the stress of the beam, chemical ingredient, distortion and railway excursion, etc. through sampling, and based on the actually examined results, it checks and calculates the carrying capacity of crane - girder system. then, based on the investigating on the spot and the calculated result, it discusses the mechanism of fatigue failure of the upper part of welded steel crane - girder, analyses the reason of steel crane - girder in the high - frequency emerging the fatigue crack, institutes the strengthened method of damaged steel crane - girder of accurate packing up workshop of the primary mill plant. finally, it presents some advice and suggestions for the repairing and strengthening method of fatigue crack of upper part of steel crane - girder in the high - frequency

    針對包鋼初廠精車間鋼吊車樑上部區域出現裂縫這一問題,本文首先綜述了國內外關于焊接鋼吊車樑上部區域疲勞裂縫的研究現狀;其次對個吊車梁系統的外觀情況(包括連接、裂縫、腐蝕、銹蝕、制動桿件斷裂、吊車啃軌等)進行了現場調查,抽樣實測了梁的應力、化學成分、變形及軌道偏移等,根據實測結果,對吊車梁系統的承載能力進行了驗算;然後,根據現場調查及計算結果,探討了焊接鋼吊車樑上部區域疲勞破壞的理,分析了重級工作制鋼吊車梁出現疲勞裂縫的原因,制定了初廠精車間破損鋼吊車梁的加固方案;最後就重級工作制鋼吊車樑上部區域出現疲勞裂縫的修復與加固方案提出了一些意見和建議。
  4. All of this got data reference and design basis for eccentric mechanism for adjusting the center distance and others

    通過優化為楔橫偏心中心距調構及相關構的設計提供了良好的數據參考、設計依據。
  5. The possible factors including the deviation of temperature in length and breadth of rod, the changes of transfiguration resisting force under the changes of temperature, the adjustment of roll gap, the variation of rolling pressure, the changes of roller speed during dynamic adjusting press, the unmatched of seconds - flux under the dimension fluctuation of the coming sample and so on. the whole system was a closed loop which factors in it interacts each other

    可能的影響因素有:沿件縱橫向溫度變化、由溫度引起的件變形抗力變化、輥縫值變化、負載變化、電調節系統由不穩定向穩定過渡過程中輥轉速的變化(如咬鋼過程中的動態速降后的回復階段) 、來料尺寸波動造成秒流量不匹配等,個模擬系統是各個因素相互影響關聯的一個閉環系統。
  6. There are three parts in the thesis : at first, introduce the environments faced by pgg csst, the main opportunity and threat, and analyze pgg csst ' s internal strength and weakness ; and then, analyze market and fix on target market ; in the end, decide the direction of product structural adjustment according to the market, design and analyze the investment plan 340mm accu - roll project

    本文共分三大部分:首先對無縫鋼管行業競爭環境和成都無縫的競爭地位進行分析,找出環境的威脅與會、企業的優勢與劣勢;然後通過細分無縫鋼管市場,確定目標市場;最後確定成都無縫的產品結構調方向,提出相應的投資項目? ? 340連組,並對該項投資進行論證。
  7. 4. providing long - term technical service to the customers as to their requirements, mainly adjustment of steel rolling mill, new products development, equipment maintenance and improvement. this post has been sumitted by

    4根據用戶的需求,我公司還可以為用戶提供長期的技術服務,主要是調新產品的開發設備的維修和改進等。
  8. And its nnc and nni are both established with the optimal neural network. so the hydraulic bend roller system ' s dynamic response velocity and static tracking precision are advanced. hydraulic bend roller force can operate better and mill ' s dynamic characteristic is improved

    將優化網路用於液壓彎輥系統的控制中,採用內模控制方案,辨識器和控制器用優化網路來離線設計、在線調,提高了液壓彎輥系統的動態響應速度和穩態跟蹤精度,充分發揮了液壓彎輥力對板形的調作用,改善了系統的動態特性。
分享友人