載荷限制系統 的英文怎麼說

中文拼音 [zǎixiànzhìtǒng]
載荷限制系統 英文
load-limiting system
  • : 載Ⅰ名詞(年) year : 一年半載 six to twelve months; six months to a year; 三年五載 three to five ...
  • : 荷名詞(蓮) lotus
  • : Ⅰ名詞(指定的范圍; 限度) limit; bounds Ⅱ動詞(指定范圍, 不許超過) set a limit; limit; restrict
  • : Ⅰ動詞1 (製造) make; manufacture 2 (擬訂; 規定) draw up; establish 3 (用強力約束; 限定; 管束...
  • : 系動詞(打結; 扣) tie; fasten; do up; button up
  • : Ⅰ名詞1 (事物間連續的關系) interconnected system 2 (衣服等的筒狀部分) any tube shaped part of ...
  • 載荷 : load; loading載荷變化 load fluctuation; variation in load; 載荷裝置 load device
  • 限制 : place [impose] restrictions on [to]; astrict; restrict; limit; confine; shut down on [upon]: 限制...
  • 系統 : 1. (按一定關系組成的同類事物) system 2. (有條理的;有系統的) systematic
  1. Probe into bulldozer ' s ultimate load control system

    推土機極的探討
  2. In this thesis, studies are focused on as follows : ( 1 ) based on analyzing the general transfer - matrix, the conception of the generalized double layer soil model is proposed, and the transfer - matrix ( r ) of half - infinite elastic mass is introduce - d to the analytic expressions of stress and settlement under the uniform circular, rectangular and strip vertical loads in multi - layered soil ; ( 2 ) according to the analytic expressions of the additional stress and settlement under unifo - rm circular in multi - layered soil, rectangular and strip vertical loads, the programs are develop - ed to resolve and debugged. the results show that the programs are correct ; ( 3 ) through calculating the coefficient of additional stress on the central axis of uniform circ - ular vertical loads, under the corner point of the uniform rectangular vertical loads, and on the central axis of uniform strip vertical loads, and the settlement on the center of uniform circular vertical loads and uniform rectangular loads in double - layered soil, the characters of stress and settlement are discussed ; ( 4 ) a case, as an example, is studied with different calculation methods, such as traditional theory, fem. the results obtained are compared

    本文在已有研究成果的基礎上進一步開展了以下幾方面的研究: ( 1 )在對層狀地基傳遞矩陣法中的總傳遞矩陣分析的基礎上,提出了廣義雙層地基模型的概念,並把半無體的傳遞矩陣r引入到多層地基在圓形垂直均布、矩形垂直均布及條形垂直均布作用下附加應力與沉降的解析式中; ( 2 )根據多層地基在圓形、矩形垂直均布及條形垂直均布作用下附加應力與沉降的解析式,編了程序,調試通過並驗證了其正確性; ( 3 )通過對雙層地基圓形垂直均布中心軸線上的附加應力數和中心沉降,矩形垂直均布角點下的附加應力數和角點沉降及條形垂直均布中心軸線上的附加應力數進行的計算,探討了雙層地基中的附加應力與沉降特性; ( 4 )應用本文的層狀地基體理論對一個工程實例進行了計算分析,並與傳的計算方法的計算結果和有單元方法的計算結果進行了對比分析,結果表明利用層狀地基理論計算更能反映地基中附加應力分佈的實際情況。
  3. He finds the pitch range after calculated the three important parameters through the bladed for windows software, then presents an optimized control strategy that regulate the pitch angle in terms of the wind speed. it must control the output power because the variational output power brings the variational loads. he confirms and optimizes the control strategy that the output power is the control target, the output power is divided into three parts

    將功率作為的目標,將功率分成三段進行控,在低風速區,是有的,以功率最大化作為控目標;在額定風速附近,由於處在升力曲線斜率的變化點,功率變化較大,應盡快調整槳距角進入失速區工作,減少的波動,該額定風速區的上下工作點要通過現場試驗的手段來確定;在額定風速以上,使功率維持在額定輸出,減少功率波動,並通過bladed軟體的模擬計算對控策略進行了驗證。
  4. Secondly, their aims are made the investment of substations, feeders or running cost of electric power system minimum. but they do n ' t take into account of land utilization, street accessibility of right of way, etc., but demands of electric power system. generally, a straight line distance, namely, euclid distance, was used for calculating the distance between a load point and a substation, which is a straight forward but non - practical way for most planning techniques

    其次受研究工具的,這些模型以工程投資、運行費用等最小為目標,僅能考慮導線流量、電壓降等電力技術約束條件,簡化略去了用地、街道可達性等重要的自然約束條件,且求解這些模型的前奏是計算負點到變電所的歐幾里得距離(直線距離) ,簡便但不切合實際(這一點在城市電網規劃中尤其重要) ,因此較難給出技術上可行的最優解。
  5. Qinhuangdao development zone prospect photoelectric tech. co., ltd was founded on 1999 which experts in elevator weightor, ic card, teli - monitoring system and magnetic inverter.

    秦皇島開發區前景光電技術有公司成立於一九九九年,是一家專業從事研製開發銷售電梯重量電梯ic卡智能管理電梯遠程自動報警安防管理和永磁同步電梯專用變頻器等
  6. Ltd founded in 1999, is a new high technology enterprise, specialized in researching, developing, manufacturing and selling of elevator weight - load system, elvator ic intelligent management system and the like of elevator dynamic static state data record management system and the like of elevator fittings. there are more than 100 experienced staff members including r d perpons, engineers and adminstrators who do their utmost to offer prompt, efficientand overall services for customers. our company manufactures six kinds of productions that hold autonomous. our company manufactures six kinds of production that hold autonomous intellectual property rights and has established long - term friendly cooperation with over one hundred ecactly elevator manufacturtures in china and abroad

    秦皇島開發區前景光電技術有公司成立於一九九九年,是一家專業從事研製開發銷售電梯重量電梯ic卡智能管理電梯遠程自動報警安防管理和永磁同步電梯專用變頻器等電梯配件產品的高新技術企業。我公司擁有經驗豐富的科研工程技術管理人員一百余名,竭力為客戶提供迅速優質全面的服務。公司生產擁有自主知識產權的九項專利產品,並與百余家整梯生產企業建立了長期的友好合作關
  7. The thesis, in the probability analysis and computation, considers the failure history of space frames and trusses, adopts the bound criterion and algorithms on the base of system ' s critical strength, and introduces the soft self - adaptation control bound into the identification of dominant failure modes ; at the same time, with the incremental load method and differential equalized recursive method, computes the limit - state function of failure mode and probability index precisely under no leaking the dominant failure modes

    文中在可靠性分析和計算部分,考慮空間剛桁架結構的失效演化歷程,採用基於臨界強度的約界準則和約界演算法,將柔性自適應控邊界引入失效模式識別過程;同時,用增量法和微分等價遞歸演算法相結合,確保在嚴格不遺漏主要失效模式的情況下,快速準確地求解失效模式的極狀態方程和可靠度指標。
  8. First, based on the analysis to the development condition of computer and property of the input data of bridge, this paper, taking convenience and practicability as principle, develops the multi passages data - in system made up with human - computer interactive interface and excel import model. second, after comparing and analyzing to the calculation theories and methods of creep and shrinkage, clearing up the key steps of creep and shrinkage analysis, the paper takes incremental method to establish program to analyze secondary inner force caused by creep and shrinkage. third, the paper puts some optimal or simplified treatment to the contents of pre - stress and develops relative program ; in addition, through analysis to the different methods used to calculate the secondary inner force caused by pre - stress, the paper combines equivalent load method with finite element, carries out some simplified treatments, and establishes program to calculate secondary inner force caused by pre - stress

    首先,在分析當前計算機的發展狀況及橋梁結構輸入數據特點的基礎上,以方便、實用為原則,採用人機交互界面和excel輸入方式聯合的多通道數據輸入;其次,通過比較分析徐變收縮計算的各種理論及方法,澄清了徐變收縮分析的關鍵過程,並採用增量法編製程序,實現徐變收縮次內力分析;再次,對預應力的相關計算內容進行適當優化或簡化處理,並編相應程序;另外,本文還在比較預應力次內力各種計算方法的基礎上,將等效法結合有元進行一些簡化處理,編製程序實現預應力次內力的計算;最後以三個算例來校核計算方法及程序運行結果的可靠性,取得了預期效果。
  9. Under the horizontal earthquake action and wind force, aim at " the pure frame structure with rectangle columns ", " the pure frame structure with special - shaped columns ", " the frame - truss structure with special - shaped columns " and " frame - shear wall structure with special - shaped columns ", earthquake action analysis was done by the spacial finite element method through the changes structural parameter. analyzing systematically " structure vibration mode ", " vibration period ", " structure lateral rigidity ", " seismic action force ", " seismic response force ", " floor seismic shear force ", " lateral horizontal displacement of structure " and " members internal force ". results indicate : ( 1 ) based on equal area, the special - shaped columns replaced the rectangle columns, the structural lateral rigidity enlarges, the lateral displacement minishes obviously, the earthquake response increase slightly, the biggest increasing amount of frame columns axis - compress ratio is smaller than 0. 08. the whole aseismic performance of structure has improved ; ( 2 ) when the section ' s length and section ' s thickness ratio of special - shaped columns is smaller than 3. 6, the structure benefits to resist seismic action ; ( 3 ) the angle of horizontal seismic action with the whole coordinate is 0 degree, structure earthquake response is bigger, belonging to a control factor of structure aseismic design ; ( 4 ) the frame - truss structure with special - shaped columns and the " a " - brace has the biggest lateral rigidity ; ( 5 ) the frame - shear wall structure with special - shaped columns have bigger lateral rigidity and smaller displacement, members internal force enlarged just rightly, have much superiority of resisting seismic action ; ( 6 ) in the higher seismic fortification criterion region ( 8 degree of seismic fortification intensity ), aseismic disadvantageous building site ( iii type site ), adopting special - shaped columns structure system, should reduce possibly the building ' s self - weight in order to reduce the earthquake response ; ( 7 ) the response spectrum method of computing seismic response and the time - history analysis method have similar analysis result

    西安理工大學碩士學位論文在水平地震作用下,並考慮風組合,分別對「矩形柱純框架結構」 、 「異型柱純框架結構」 、 「異型柱框一析架結構」及「異型柱框-剪結構」等四種結構體,通過改變結構參數,運用空間有元方法,進行地震作用計算。地分析研究「結構振型」 、 「振動周期」 、 「結構側向剛度」 、 「結構地震反應力」 、 「樓層地震剪力」 、 「結構側向位移」 、 「層間位移角」 ,以及「構件內力」 。結果表明:在等面積原則下,異型柱代換矩形柱后,結構剛度增大,側向位移明顯減小,地震反應力略有增加,框架柱軸壓比最大增幅小於8 % ,結構整體抗震性能有所提高;當異型柱肢長肢厚比小於等於3 . 6時,結構有利於抗震;水平地震作用力與整體坐標夾角為0度時,結構地震作用效應較大,屬結構設計的控因素之一;異型柱框一析架結構採用「人」字斜撐,側向剛度大於「八」字斜撐和「人一八」字混合斜撐;異型柱框一剪結構側向剛度大、位移小,構件內力增大適中,是一種抗震性能優越的結構體:在抗震設防烈度較高地區( 8度)和抗震不利的建築場地( m類場地) ,採用異型柱結構體時,應盡可能減輕結構自重,降低地震作用力;分別採用「振型分解反應譜」法和「時程分析」法進行地震作用計算,兩種方法所得結果基本一致。
  10. According to the characteristic of nine - area diagram of substation vol / var coordinated control, this system gives the defination of fuzzy sets and the degree of membership of input / output variables, and designs corresponding control rules. the results of simulation demonstrate the system can satisfy the constrains of the day - adjusting times of the switching of on - load transformer and paralleled compensation capacitors, and ensure voltage quality, reactive power basical balance. considering the var requirement in different load time period and the control demand in load saltation, a improved control scheme is provided. the results of simulation show the improved scheme can meet the demand of vol / var in different load time period, protect the wrong operation when either voltage or reactive power appears saltation, and decrease the times of regulation of the switching of on - load transformer and paralleled compensation capacitors finally, a background software module of substation vol / var coordinated control is designed, based on the supervisory control and data acquisition system of substation

    模擬結果證明該能在各種負條件下確保電壓合格和無功基本平衡,且能滿足變電站對有調壓變壓器分接頭日調節次數和並聯補償電容器組的日投切次數的。通過考慮不同負時段對無功功率的需求和負突變情況下的控要求,對上述模糊控策略進行了改進,模擬結果證明改進后的控策略能滿足不同負時段對電壓和無功的要求、抑電壓或無功突變情況下的誤動作,且有效地減少了有調壓變壓器分接頭和並聯補償電容器組的調節次數。最後基於變電站scada設計了一后臺電壓無功綜合控軟體模塊。
分享友人