輸出負荷 的英文怎麼說

中文拼音 [shūchū]
輸出負荷 英文
output load
  • : Ⅰ動詞1 (運輸; 運送) transport; convey 2 [書面語] (捐獻) contribute money; donate 3 (失敗) l...
  • : Ⅰ名詞1 (負擔) burden; load 2 (虧損) loss 3 (失敗) defeat Ⅱ動詞1 [書面語] (背) carry on th...
  • : 荷名詞(蓮) lotus
  • 輸出 : 1 (從內部送到外部) export 2 [電學] output; outcome; outlet; out fan; fanout; 輸出變壓器 output ...
  • 負荷 : [電學] load; charge; weight
  1. Also a refined - pulp quality predictive model, with specific energy, specific load as the model inputs, and beating degree, wet weight as the model outputs, is presented. simulation results show that the models can be acted as theoretical bases for the automatic control of high - consistence pulp refining process

    即,建立了以原漿流量、白水流量、盤磨機功率為入變量,比能量、比、濃縮機漿位為變量的動態模型,以及基於比能量、比的成漿質量預報模型。
  2. The basic thought of the csapfba algorithm is : the edge routers perform the state management per flow, and the edge routers differentiate between the marked flows and the non - marked flows, and the edge routers insert the relevant information into the packet header by using dynamic packet state ; the core routers divide the output link bandwidth into two parts in the light of the state information of the packet header by using class - based queueing, and the core routers allocate proportionally the bandwidth to the marked flows according to their service profiles and the current network load, and the core routers allocate the bandwidth to the non - marked flows according to the principle of max - min fairness, and the csapfba algorithm can adaptively dynamically adjust the bandwidth allocation between the marked flows and the non - marked flows

    本文在csfq演算法的基礎上,提了一種核心無狀態的自適應的成比例公平帶寬分配csapfba ( core - statelessadaptiveproportionalfairbandwidthallocation )演算法。 csapfba演算法的基本思想是:在邊界路由器完成基於每個流的狀態處理,將所有的流分成標記流和非標記流兩種類型,採用dps技術將有關信息編碼進分組頭;在核心路由器根據分組頭中攜帶的狀態信息採用cbq策略,將鏈路帶寬分成兩部分,對標記流根據當前的網路按照服務規格成比例地分配帶寬,對非標記流按照最大最小公平性原則分配帶寬,並且能自適應地動態調整帶寬分配的比例。
  3. In view of this situation this article has conducted research to the design of metallurgy auxiliary biography with the frequency conversion table electrical machinery first multianalysis to the frequency changer and the frequency conversion table electrical machinery movement characteristic is carried out, the voltage waveform harmonious which the frequency changer outputs is big, attacks in a big way, and the voltage climbing rate reaches as high as 6600v / mu s which is 20 times ordinary sine alternating voltage, the rolling mill auxiliary biography table set the extremely strict request to the electrical machinery ; its movement frequency is very low, rate frequency in 8 - 20hz ; the velocity modulation scope is wide, the lowest movement frequency lowers to 1hz, and the starting number of times is quite frequently, each hour reaches as high as 600 - 800 time, the impact shoulders in a big way, the overload capacity request is high

    針對這一情況本文對冶金輔傳用變頻輥道電機的設計進行了系統研究。首先對變頻器和變頻輥道電機的運行特性進行詳細分析,變頻器的電壓波形諧波大,沖擊大,電壓上升率高達6600v / s ,是普通正弦交流電壓的20倍;軋機輔傳輥道對電機提了十分嚴格的要求:其運行頻率很低,額定頻率在8 - 20hz ;調速范圍寬,最低運行頻率低到0 . 5hz ,起動次數相當頻繁,每小時高達600 - 800次,沖擊大,過載能力要求較高。
  4. Specifications : power input : standard 220vac, 50hz power output : standard 12vdc, 3a control electric locks or bolts directly

    功能特性:交流入:標準220vac , 50hz直流:標準12vdc , 3a直接控制電鎖:可減少門禁控制器的,節省工程布線,減少故障隱患。
  5. With the development of the electric power system, static - state reactive power compensators ca n ' t have met the requirements of the actual production and operation, and the trend to the fast and dynamic compensation for reactive power become greater and greater. since ertan hydroplant and 500kv transmission systems in sichuan power system have been operated, many power plants of load center are forced to halt during the high - water period, because the great deal of power is transmitted to far - distance load center. thus the load center loses voltage sustentation and the level of the system stabilization is debased greatly

    四川電網的二灘水電站和500kv變電系統投入運行后,由於二灘水電站的大量電力遠距離送至中心,迫使中心的火電機組在豐水期大量停機,使中心失去電壓支撐,大大降低了電網的電壓穩定水平;同時,因為四川電網中的無功補償裝置全為靜態無功補償電容器(或電抗器) ,這些設備只能在系統正常運行狀態下起到無功補償和電壓支撐的作用,而在電網現事故時,不但不能起到電壓支撐作用,反而會促使電網電壓崩潰事故的發生。
  6. Second, this paper analyzes the relation of reactive support service with voltage, power limit curve, transaction amounts. according to the power limit curve, this paper analyzes the source of the reactive cost to get an interzone cost function. using marginal cost theory, it concludes that the reactive spot price is the derivative of the cost function in generator buses

    另外,本文還從發電機角度上分析了無功服務與電壓、功率限制曲線、發電機向電能大小的關系;根據功率限制曲線對發電機無功成本的來源進行詳盡剖析,從理論上確定一個分區間的成本函數;並依據短期邊際成本理論可推,計算發電機節點的電價可採用無功成本函數的偏導數的方法。
  7. Mae of hourly load prediction reduced to 65. 07kwh and eep reduced to 2. 60 %. this kind of model has not been reported by literature. a cost - minimum model for ice storage system is established and numerical calculation is carried out

    建立了空調逐時的24小時提前預測多點動態模型,更進一步提高了預測的精度,使得逐時預測平均絕對誤差降低到了65 . 07kwh ,期望相對誤差降低到了2 . 60 。
  8. This project makes some researches with emphasis on the mv / lv distribution power supply situation under the present load condition. some results such as the calculation of line load rate, theoretical line consumption rate and electric voltage decrease are acquired by the mathematical analysis, and thus the power supply capability is evaluated comprehensively. the same has been done to the lv power network

    課題在系統搜集分析蘇州供電企業的背景資料,即企業概況、電力需求、電網、高壓配電網狀況基礎上,重點研究了當前下的中低壓配電網供電情況,並通過數學分析得線路的載率的計算、理論線損率以及電壓降等各項運行指標,綜合評估得其供電能力。
  9. Based on the theory of branch complex power, accurate formulas are derived to determine complex loss and flow components in power elements. to overcome the deficiencies of the traditional methods which transmission cost is allocated to users only based on active power flow and the existed using portion definitions which fail to take it into account that the interaction of active and reactive power, a new definition of the using portion of a power element by a particular generator or load is addressed

    針對當前電費用只按有功潮流進行分配,無法計及無功潮流交叉影響的缺陷和基於傳統的電路理論無法結合有功無功潮流來定義元件使用份額的問題,本文又在復功率電源的支路功率分量理論基礎之上,基於發電機和的復功率在支路上引起的有功損耗分量,給了發電機和對元件使用份額的新定義。
  10. If has been marked as output twisting force has exceeded maximum allowable twisting force that reduction device can bean, shouldn ' t full burden operate

    標記為扭矩已超過減速機所承受的最大許用扭矩,不能滿運轉。
  11. As the agricultural nfs is the most important factor for water environmental deterioration and lake eutrophication in china, more and more scientists and technologists focus on the control countermeasurc and pollution mechanism of agricultural non - point source ( nfs ). based on the investigation of natural resource and agricultural distribution, the loss rule of nitrogen and phosphorus in the typical land of qiandao lake watershed and distribution rule of the phytoplankton and physico - chemical characteristic in the lake were studied, and the input loading of nitrogen and phosphorus was also calculated by the annagnps model in this thesis. according to the routine monitoring data of the water environment in qiandao lake from 1989 to 2001, the concentrations of toxic substance and heavy metal were under the monitoring limit, but the total nitrogen ( tn ) and total phosphorus ( tp ) were much higher than the criterion for lake and reservoir

    本文調查了千島湖流域的自然資源和農業生產情況,研究了典型坡地降雨徑流中的氮、磷污染物的規律,利用annagnps模型估算流域農業非點源污染物,並在千島湖內設點采樣,對水質理化指標和浮游植物群落進行系統的研究,得以下結論: 1989 2001年間的水環境常規監測資料統計分析表明,有毒物質和重金屬濃度長期在監測下限內, no _ 2 - n 、 no _ 3 - n 、 nh _ 3 - n年平均濃度均符合類標準,但湖泊水庫特定項目tn和tp濃度分別為超類和類,呈嚴重超標狀況,湖區主要污染因子是將導致富營養化的物質tn和tp 。
  12. In this paper, the mechanism and practical effect of existing coordinated control schemes are analyzed in detail, the advantage and drawback of the different coordinated control methods in practice are indicated clearly. this paper describes a fact that it is difficult to obtain rapid load response and stable main parameters at the same time by using the recent methods, underlines that heat release is the vital parameter that should be carefully controlled

    本篇在吸取了目前各種協調控制系統的優點的基礎上,提了改進后的協調控制方案,主旨為以控制鍋爐的熱量釋放信號為核心,採用具有內在穩定特性的控制方案,充分加快機組的響應速度,在機組所帶已經接近當時的極限,及時限制功率的增長,達到穩定機組的目的。
  13. To minimize the impact of the overhaul of power generating, transmission equipments on the safety, stability and economic operation of power gird, this paper, aiming at the overhaul demand of lots of equipments, brings forward the practical optimization method for overhaul planning which can adapt to the dynamic changes of the scale of power grid and integrate the load forecast and the balance of power load and power volume into it, therefore solve the key technical problems encountered by using computer to realize the optimization of overhaul planning

    為最大程度減少電網發、電設備檢修對電網安全、穩定、經濟運行的影響,針對電網大量設備的檢修需求,提了能適應電網規模動態變化,並與電網預測、電力電量平衡有機結合的實用檢修計劃優化方法,解決了利用計算機實現檢修計劃優化的關鍵技術問題。
  14. Along with the development of power system, more and more generators and ehv transmission systems are put into operation. there come many new situations, such as the lengthening transmission distance, the heavier load, the increasing transient elements during the transient process. these new conditions influence the correct working of relay protections

    隨著電力系統的不斷發展,大容量發電機組和超高壓電系統的相繼投入運行,系統中現了許多新的情況,如電距離增大、加重、故障暫態過程中的暫態分量大大增加、持續時間變長等,這些情況對目前常用的各種繼電保護方法的正確動作會產生許多不利的影響,甚至不能正常運行。
  15. With the countrywide increasing in train speed and more and more goods and passengers have to transit, the issue of railway safety has become a hot topic

    隨著列車全面提速以及鐵路部門客貨運量不斷增大,鐵路線路不斷加重,鐵路安全問題日益突
  16. The engendering source of traffic volumes and their general influential factors have been presented, and the situation of nowadays highway transportation has been discussed. according to the introduction of traffic distribution theory and classical assignment method, analysis of traffic flow path selection among cities and that of special influential factors for traffic flow on toll highways, initial analysis to the forming mechanism of traffic volume on road sections has been made, and a probability model for path selection has been set up with the maximum - utility theory and disaggregating model. detailed analysis to impedances on road sections and their functions ( especially to three main composing factors of the impedances as cost of time, transport and toll and to the functional relations with traffic loads ) was made, at the same time, the relative cost calculating model was set up on the basis of the state - of - art achievements in both international and national researches

    主要研究內容包括:交通量的產生根源及一般影響因素分析和當前公路運地位討論;從交通分配理論及經典配流方法著手,通過分析城市間交通流路徑選擇行為和收費公路路段交通量特殊影響因素,初步提路段交通量的形成機理,並採用效用極大原理和非集結模型理論( disaggregationmodel ) ,建立用戶行路徑選擇概率模型;對路段阻抗及路阻函數(尤其對行程時間費用、車輛營運費用和道路收費這三個構成路段阻抗的主要因素及其與交通間的函數關系)進行較為詳盡的分析,並以現階段國內外較為先進的研究成果為依據建立相應的成本測算模型,其中,特別提了兩種確定客貨車輛時間價值的分析方法;離散分析法和時間-費率轉換法,後者是在目前基礎調查、統計數據資料不夠齊全的現實下提的一種確定道路系統內務車型時間價值的較為實用的新方法;對我國公路收費政策的背景和理論、實踐依據及費率的各種影響因素進行重點分析;從數學的角度證明合理費率的存在性,並以最優化理論為基礎,建立在普通收費公路和擁擠路段交通調控型收費公路兩種模式下合理費率的計算模型等。
  17. Redundancy design and module circuit design have been used, and completely think over the adaptability to environment, self - protection and heat release. the control software is compiled with asm language, the software includes the air - fuel ratio control program under different situations, monitor program and signal processing program

    根據發動機的工作特性用匯編語言設計相應的綜合控制軟體,它包括發動機起動、怠速、加速、減速、恆速和變速變等工況的空燃比控製程序、串列和并行通訊程序、信號採集及數據處理程序和控制量程序。
  18. Specifications : power input : standard 220vac, 50hz power output : standard 12vdc, 5a control electric locks or bolts directly. reduce the load of access controller lower potential trouble nc no output, control all kinds of electric locks delay control circuit unlock delay time in 0 10s auto protection dimension : 180x77x77mm weight : 1540g

    功能特性:交流入:標準220vac , 50hz直流:空載14vdc ,12vdc ,標準電流: 5a直接控制電鎖:可減小門禁控制器的,節省工程布線,減少故障隱患。
  19. Under the situation of gas supply demand contradiction growing day after day, by studying the features of gas supplying delivering loads of gas pipelines and the gas price in the sichuan basin, according to the gas transmission capacity of the pipelines limited by the given gas transmission facilities, it is suggested removing the peak to fill the valley and optimal distributing the loads, which can not only improve the efficiency of gas supplying / delivering facilities, and release a part of gas supply / demand contradiction, but also improve the benefit of gas marketing

    摘要在天然氣供求矛盾日益加劇的情況下,通過研究四川盆地天然氣管供氣特徵與用戶用氣特徵及氣價的關系,提在一定氣設施所確定的管能力情況下,通過移峰填谷和擇優配置,既可以提高天然氣管供、用氣設施效率,緩解一部分天然氣供求矛盾,又可提高天然氣銷售效益。
  20. The results showed that there were 2380. 879 tons sediment - attached nitrogen, 10432. 959 tons soluble nitrogen, 40. 922 tons sediment - attached phosphorus and 295. 679 tons soluble phosphorus inputted into the qiandao lake per year. monthly inputted loading changed very strongly, the loading was interrelated positively with rainfall and 70 % of total pollutant was exported from the watershed during the april and september

    千島湖流域氮、磷非點源污染的月差異極大,氮磷污染物的量與月降雨量成正比,降雨集中的4 9月份是每年的污染物集中時期,氮、磷污染物量佔全年總量的70以上。
分享友人