轉化爐管 的英文怎麼說
中文拼音 [zhuǎnhuàlúguǎn]
轉化爐管
英文
reformer tube-
Flanged air and gas rotatable entries simplify burner piping manifolds
法蘭式空氣和燃氣旋轉介面簡化了爐頭管線配置。None of the 560 reformer tubes requires replacement at this stage, but the 6 nipped tubes should be removed and plans put in place to replace these and approximately 16 other tubes, nearing the end of their life through creep, at the next shut down
在本階段, 560根轉化爐管都不需要更換,但是有6根已經掐斷的管應該被移走,還有大約16根其他的管子壽命也快到終點了,計劃在下次停車的時候進行更換。In the light of hydrogen manufacturing coverted furnace tube system ( including conversion tube, gas gathering tube and pigtail tube ) occuring weld fissure during manufacture and installation, the reason of fissure is analized. the repair plan and specific repair measures are recommended
針對制氫轉化爐管系(包括轉化管、集氣管、豬尾管)在製造安裝過程中出現焊接裂紋的原因進行了分析,並介紹了缺陷的修復方案和具體修復措施。A model for prediction of the temperature and carbon content of liquid steel at the end of blowing and optimization of process has been established based on lgmis and pzlgps. a decision - making support sub - system for quality control of bof process, which can be embedded into the decision - making support system for steel making process at panzhihua iron and steel corporation, has been planning and designed. the optimizing process variables for quality control of steel making process at panzhihua iron and steel corporation has been achieved according to the model and process data from lgmis and system of process computer of converters
在提釩煉鋼廠信息管理系統( lgmis )和轉爐過程計算機系統( pzlgps )的基礎上,研究了適宜的煉鋼過程質量控制模型方法,構建了轉爐終點預測和過程工藝優化的黑箱模型;設計了在攀鋼生產管理輔助決策支持系統lg - idss的框架下進行轉爐過程質量控制專用輔助決策子系統;採用轉爐煉鋼過程質量控制模型以及攀鋼lgmis和轉爐過程計算機中的轉爐冶煉數據進行了計算,確定了滿足煉鋼過程質量控制要求的轉爐煉鋼優化工藝參數。Abstract : by taking the modification project of hydrogen generation unit in a petrochemical plant as an example, the successful welding of heat - resistance ferroalloy with high cr - ni content is presented, including weldability analysis, weld procedure qualification test, weld process measures and quality inspection
文摘:以制氫裝置改造工程為例,報道在制氫轉化爐爐管現場焊接施工中,對鐵基高鉻鎳耐熱合金管材的成功焊接,包括可焊性分析、焊接工藝評定試驗、焊接工藝措施和質量檢驗。The loading and running of primary reforming catalyst z111 - 4ya in the 0. 45mt / y ammonia plant of china national offshore oil corp chemical ltd ( cnoocc ) were analyzed according to the primary reformer process and design basis, and the operating and managing experiences of the catalyst were summarized
摘要本文根據中國海洋石油化學有限公司45萬噸合成氨裝置一段爐工藝流程及設計基礎,對z111 - 4ya一段轉化催化劑裝填及催化劑運行進行了分析,總結催化劑運行管理經驗。As the change of the seamless steel tube market, the order of the boiler tube for power station is reducing now, but the order of the high intensity casing tube is rising year after year
現隨著市場的變化,電站用鍋爐用管訂貨量較少(每年不足1萬噸) ,而高強套管訂貨量逐年上升,因此該生產線逐步轉變為主要生產高強套管的生產線。The model can satisfactorily predict commercial operation results with regard to the edc conversion, vcm selectivity, pressure and temperature at the outlet of reactor coil
與工業數據比較后發現,爐管出口的轉化率、選擇性、出口壓力和溫度等數據與模型預測值一致,表明模型具有較高的可信度。Prediction of residual life - span for a transfer furnace in large ammonia synthesized apparatus
大型合成氨裝置一段轉化爐爐管的剩餘壽命預測分享友人