逐段硫化 的英文怎麼說
中文拼音 [zhúduànliúhuà]
逐段硫化
英文
length-to-length cure-
Guangdong, for its part, is building four large scale natural gas power plants that will start operating in phases from 2006. flue gas desulphurisation will be installed in all other power plants with a capacity of 125 megawatts or greater by 2007. low nitrogen oxide burners are also being installed and highly polluting coal - fired boilers and industrial furnaces are being phased out
廣東省亦正興建四間大型天然氣發電廠,這些設施預計可在2006年起分階段投產,此外全省其他125兆瓦或以上發電容量的發電廠在2007年或之前裝妥煙氣脫硫裝置,廣東省並逐步裝設低氮氧化物燃燒器和淘汰高污染的燃煤和工業鍋爐。
分享友人