通航保證率 的英文怎麼說

中文拼音 [tōnghángbǎozhèng]
通航保證率 英文
navigation probability of insurance
  • : 通量詞(用於動作)
  • : Ⅰ名詞(船) boat; shipⅡ動詞(航行) navigate (by water or air); sail
  • : Ⅰ動詞1 (保衛; 保護) defend; protect 2 (保持) keep; preserve; maintain in good condition 3 (...
  • : Ⅰ動詞(證明) prove; verify; demonstrate Ⅱ名詞1 (證據) evidence; proof; testimony; witness 2 (...
  • : 率名詞(比值) rate; ratio; proportion
  • 通航 : be open to navigation or air traffic
  1. The second chapter studies the economy of ship ' s power plants, based on the aspects of lowering fuel cost, waste heat recovery, the match of ship, machinery and propeller, increasing propulsion efficiency, increasing the economy of ship ' s power plants, etc. the third chapter discusses in detail the control measures of voyage change cost, analysizes systematically the voyage change cost based on the way of fuel cost, harbor cost, voyage venture cost. the fourth chapter studies the structures and control measures of seafarers cost, maintenance cost, spare parts and stores cost, lubricating oil cost, etc. which are relatively easy to be controlled ; based on the state maintenance decision - making, a mathematical model is put forward, the validity and its solve process are discussed. the control measures of spare parts, fuel cost and lubricating oil cost should be based on scientific budget, through the control means of application, reception, usage, store check, try to acquire the inosculation of theory

    第一章主要討論營運船舶運輸成本,對船舶運輸成本的概念、結構、性質與分攤、成本細分進行了分析,從宏觀上闡明了船舶運輸成本的生存環境和生長趨勢;第二章研究了船舶動力裝置的經濟性,在營運船舶降低油耗、廢熱利用、船機槳匹配、提高推進效、提高船舶動力裝置經濟性的有效途徑等方面進行了闡述和論;第三章詳細論述並論次變動成本的控制措施,全面系統地分析和總結了次變動成本,過對燃油成本、港口使費、次風險成本的分析與控制,提出了次風險成本的概念並論述了若干次風險成本的控制措施;第四章對船舶營運成本中的船員費用控制、維修養及其費用控制、船舶備件物料管理及其費用控制等幾個主要可控性較高的成本進行了細致的分析並分別討論了相互的控制措施,提出了基於狀態維修決策的馬爾可夫數學模型並論了模型的正確性及具體解算步驟,對于備件、燃潤物料的控制堅持以科學的預算為前提,以申領、接收、使用、盤存為控制環節,切實做到理論與實踐的密切結合;第五章,結合營運成本的預核算的案例,對船舶營運成本的預算及核算進行了有益的探討,旨在揭示成本發生的動因,並給出了成本預算、核算的編制方法。
  2. Equip along with the weapon continuously creative, the sharp weapon also raises continuously in the quantity and the request on the quantities, processing to produce the mode and productions to process the production request that the equipments have already ca n ' t satisfy the long sail company originally possessed. through the common consultation of the company leadership and all employee, decide to throw in the capital, carry on to the company to reform completely, expand the scale, lead quantity and quantities that controls the production line to raise the production into the number, thus satisfy the competition ability that the productivity request combines to raise the business enterprise continuously. this thesis mainly what to study is the long spring aviation liquid to press to control the limited company number to control the degree of progress that the production line installs the item excellent turn, pass to use the item management of theories resolve the problem within actual application

    長春空液壓控制有限公司前身是中國空第二集團下屬第133廠,是一個為飛機配套機載設備的軍工企業,成立於1998年,隨著我軍裝備事業的不斷發展,對武器裝備的需要也越來越迫切,大批量的高精尖武器裝備已經成為打贏高科技精裝備條件下局部戰爭的法寶,因此長春空液壓控制有限公司針對這一嚴峻形勢,果斷地提出利用項目管理的知識體系,引進數控生產線項目,在企業正常生產和安裝質量的前提下,縮短工期,節約成本並過項目管理知識體系的運用,用系統的管理知識,提高管理效、管理水平,並運用到其他的項目中,從而最終提高企業的生產力和競爭力。
  3. From passenger handling to aircraft operations and engineering maintenance, we ensure you, your luggage and cargo arrive safely and on time by adhering to high standards of technical excellence and operational efficiency

    由客戶服務至機運作及工程維修,過堅持高水平的技術及卓越的運作效,我們總能您及您的行李以至貨物能安全及準時到達目的地。
  4. It is always a paradox to improve the performance of tracking initialization and to reduce its time cost, through tracking initializationhas been divided into different ranks to which we have different treatment, initializing fleetly for high rank, waiting to the next one or two step to initialize for lower ranks, non - initializing for the lowest ranks. the result of simulation shows that this method accelerates the average initialization velocity with certain probability of initialization and false initialization

    跡起始質量與跡起始時間的矛盾一直是難以解決的問題,過引入跡起始等級化的方法,不同等級的起始跡區別對待,等級高的跡快速起始,等級較低的跡延遲一步(或兩步后)起始,等級最低的跡暫時不起始。模擬結果表明,此方法在一定跡起始概與虛假跡概的情況下,加快了平均起始速度。
分享友人