連接石 的英文怎麼說

中文拼音 [liánjiēdàn]
連接石 英文
bonder
  • : Ⅰ動詞1 (連接) link; join; connect 2 (連累) involve (in trouble); implicate 3 [方言] (縫) ...
  • : Ⅰ動詞1 (靠近;接觸) come into contact with; come close to 2 (連接; 使連接) connect; join; put ...
  • : 石量詞(容量單位, 十斗為一石) dan, a unit of dry measure for grain (= l00 sheng)
  • 連接 : connect; fit together; link; marry; mate; joint; association trail; linkage; concatenate; concate...
  1. At an indefinite height overhead something made the black sky blacker, which had the semblance of a vast architrave uniting the pillars horizontally

    在他的頭頂上,高高的空中還有一件物體,使黑暗的天空變得更加黑暗了,它好像是把兩根柱按水平方向起來的橫梁。
  2. The oil company british petroleum has shut down a pipeline connecting the prudhoe bay oil fields in alaska to the trans - alaska pipeline

    英國油公司已關閉一條阿拉斯加普拉德霍灣油田與外聯系的管道。
  3. Now, right before us, the anchorage was bounded by a plateau from two to three hundred feet high, adjoining on the north the sloping southern shoulder of the spy - glass, and rising again towards the south into the rough, cliffy eminence called the mizzen - mast hill

    在我們前方,錨地與一片高約兩百至三百英尺的高地著。高地的北端與望遠鏡山的南坡相,向南則逐漸拱起,形成崎嶇多的後桅山。
  4. And the traffic is very convenient ; there are the buses direct to railway station, bus station, steamboat dock as well as guanqian, stone road and other suzhou industrial park district, vicinal east central links with huning high - speed and sujiahang high - speed ; it can take the convenient for the friends from driving for the better parking condition

    交通便利,有公交車直達火車站汽車站和輪船碼頭以及觀前路等蘇州著名商業區,附近的東環高架可與滬寧高速和蘇嘉杭高速相較佳的停車條件,可以為自駕車的朋友提供便利。
  5. Satsuki exhibition, satsuki gardening class and more events such as the edo traditional craft workshop ( including charged experience ) are scheduled during the festival period. visitors may enjoy tour around other gardens on the special stamp rally project where you can access by the toei subway oedo line. those on the list are hama - rikyu onshi gardens, koishikawa korakuen gardens and kiyosumi gardens

    除江戶傳統工藝角(有可交納成本費體驗的活動)以外,同時從舊芝離宮恩賜庭園開始通過都營大江戶線的濱離宮恩賜庭園、小川后樂園、清澄庭園等景點處,還可蓋上不同地方的精美郵戳。
  6. Pigtails and flexible hose connectors for lp - gas

    液化油氣用引線和撓性軟管
  7. Materials for rubber - based pre - formed joints for use between concrete paving stones. characteristics joints for airport runways

    混凝土鋪路板之間用橡膠基預成形件.特性.機場跑道用特性材料
  8. Based on extensive investigation of construction technique history of chinese ancient buildings, the structure method, structure developing history and seismic behavior of chinese ancient timber structure buildings are analyzed in several respects of the structural system and form. through a series of experiments on constituent parts of chinese ancient timber building structure, including the tests on the corbels and brackets called dougong subjected to low cyclic reversed loadings, the tests on the wooden frame using the tenon - mortise joints as connections of column and beam subjected to low cyclic reversed loadings, the tests on vibration isolation effect of friction and slippage between column footing and their socle base, and a series of shaking table tests on a chinese ancient timber structure palace building mode under artificial earthquake at serving conditions, destroyed conditions and reinforced conditions, many valuable results of structures such as moment - curvature hysteretic loops of dougong structure and tenon - mortise joints under low cyckc reversed loadings, the static function, the seismic performance, energy dissipation, vibration reduction, energy - loss mechanism, nechanicalmode and failure mode were studied. aplenty of valuable parameters of the structure system were obtained, such as the natural period of structure, vibration modes, damping ratio, factor of vibration isolation, oscillate amplitude of ineitial accebration, velocity and displacement, magnitude of slippage, and the mechanism of structure failure and collapse etc. based on these research, the complete analysis of ancient timber structure under earthquake were carried out in which including mechanism analysis method, calculating mode, strength analysis of members and joints, strengthening methods for serving damaged ancient timber structure buildings were also taken into account

    依照宋代《營造法式》建造了抬梁式殿堂木結構構件及結構模型,對中國古代木結構中的典型構造如:柱腳在礎頂面平擱簡支、柱架榫卯、柱高不越間之廣、側腳、生起、斗拱等的構造機理及結構功能進行了量化分析和實驗研究: (一)通過木柱礎靜摩擦試驗,測定了柱腳與礎古鏡面間的摩擦系數及摩擦力隨上部結構荷載變化的規律; (二)通過單柱承載力試驗,測定了古建築中木柱的受力變形特徵、破壞模式、及模型材料的變形模量、極限承載力、極限變形等參量; (三)通過柱架低周反復荷載試驗,測定了柱架的抗側移剛度、柱架恢復力特性及滯回曲線、榫卯張角剛度及其變化規律、柱架及榫卯的極限承載力和極限變形、及榫卯減振參數; (四)通過斗?低周反復荷載試驗和受壓試驗,測定了古建築木構件與木構件間摩擦系數,斗?抗側移剛度,斗?恢復力特性及滯回曲線,斗?抗壓極限承載力及受力變形規律; (五)通過抬梁式殿堂間架模型振動臺試驗,測定了殿堂木構架結構自振周期,地震反應振形、阻尼特性及阻尼比;按結構分層特點對柱腳、柱頭和斗?層上的屋蓋的地震反應採用多點同步測量,對柱根滑移、榫卯變形、斗?的變形、復位、耗能減振參數等進行了定量分析。
  9. The author presume the original physiognomy of jiuzhai valley, and acknowledged changhai valley was a surface - water with uniform waterpower, the rize valley was a branch of it but the inequality rise of lithosphere, the deposit of earthquake landslides debris flows and falling or glacier blocked the river - way, furthermore, the flow water with high content of ca ( hco3 ) 2, so tufa dyke formed and evolvement the present dyke of lakes the present physiognomy formed on the base of those 2

    由於地震、滑坡、泥流引起的堆積物和冰川作用形成的冰磧物堵塞河道,再加上構造運動造成地殼的不均勻抬升,九寨溝的這種獨特的地質環境以及高含ca ( hco _ 3 ) _ 2的巖溶水流作用下,為caco _ 3沉積創造條件,沉積的caco _ 3加高、最終形成灰華堤壩,使湖泊的形成成為可能。
  10. Check the nose part. it should be round around the nose and mouth part, not two " lines " starting from the upper and lower fins, connecting at the mouth like the blue diamond on the top photo. you can check the desired shape for the mouth - nose region on the turn based discus in the right photo

    檢查鼻子部分,鼻子和嘴的部分應該是圓的,不是兩條線從背鰭和腹鰭開始,于嘴的地方,就像上圖里藍鉆的樣子。你可以從旁邊的圖中觀察到受歡迎的鼻子和嘴的部分。
  11. The marvellous stone carvings at baoding hill cover a distance of some 500 metres. the stone sculptures show different postures and expressions, and each refers to a particular episode in buddhist literature

    當中的寶頂山刻氣勢磅礴,綿延500多米,前後內容,雕刻無一雷同,被視為窟藝術的珍品。
  12. A new type of joint technique between short _ net copper pipe and soft _ cable connection board, castfusion welding, is introduced. the practice of more than ten years shows that this fusion welding connection has the superiority of higher reliability, simpler processing method, better economy benefit compared to the taper cone face - contacted connection

    介紹了電爐短網銅管與軟纜線板之間的一種新型技術? ?澆鑄熔焊技術.經過10多年的運行,實踐證明短網銅管與鑄銅軟纜線板的澆鑄熔焊,與傳統工藝採用的圓錐面相比較,具有加工工藝簡單、運行可靠性高、經濟效益好等優點
  13. Construction of a 5. 4 - kilometre dual 3 - lane carriageway linking the hong kong - shenzhen western corridor at its landing point in ngau hom shek with the yuen long highway at lam tei

    築建一條長5 . 4公里的雙程三線分隔車道,深港西部通道在鰲?的地點與藍地的元朗公路
  14. Holder outlines and pin connections for quartz crystal units

    英晶體元件的支柱引線和插腳
  15. In the construction of the tanghe inverted siphon on mid - roule of south - to - north water transfer project, some reliable construction processes and techniques are applied such as belt conveyor with three - rail gantry, construction with combined steel formwork, straight screw sleeve connection for reinforcement and the crushed stone - planting method etc., by which better construction effects are obtained

    摘要南水北調中線唐河倒虹吸工程項目施工中,根據工程特點,採用了三軌門架式皮帶布料機、鋼模板聯體施工、鋼筋滾壓直螺紋套筒、混凝土施工縫栽法等可靠的施工技術和施工工藝,取得了較好的效果。
  16. The 2 and a quarter mile long akashi keiko bridge joins the japanese island of honshu and awaji for the very first time

    25英里長的明海峽大橋第一次將本洲和淡路島起來。
  17. Quartz crystal units of assessed quality - standard outlines and lead connections

    質量評定的英晶體元件.標準外形和引線
  18. The following conclusions are gained : ( 1 ) the located shear band prongs the ligament near the top crack tip and the structure may occur shear - mode fracture at the angle of 155 ? to crack when load is 87. 92mpa ; the mode of fracture of the flange joint structure is not possible to be void - mode ; ( 2 ) it is proved that loading and then unloading repeatedly can not increase the possibility of invalidation of the structure when the times of loading and unloading are not too more when load is operating pressure ; the structure is safe when the vessel is operating ; ( 3 ) in the fe model of the thesis, not considering the influence of water pressure test which is in the process of fabrication of vessel in fe results in larger deviation in analysi

    得出了以下結論:在8792mpa的載荷下筒體一封頭結構處的集中剪切帶貫穿韌帶,可能發生沿與原裂紋線成155 「角方向剪切型斷裂;筒體一封頭結構不可能發生韌窩型斷裂; ( 2 )在工作壓力下進行次數不多的反復加、卸載,結構不會破壞,也不會喪失安定性:結構在工作狀態下是安全的; m在本文的彈塑性有限元模擬計算中,對于裂紋尖端進行力學分析時,不考慮壓力容器製造過程中水壓試驗的影響,將導致計算結果出現較大的偏差; ( 4 )筒體完全屈服時的載荷為923mpa ,封頭完全屈服時載荷為86
  19. The method of transforming temperature and pressure data by ad7713 is introduced and the means of connecting to the quart pressure transducer is discussed in this paper also. it has been proved that this new kind of telemetry tool is feasible and can be put into use

    本文還探討了採用模數轉換器ad7713處理溫度和壓力信號的方法,並進行了驗證,研究了通過英晶體壓力計高頻輸出信號計算壓力頻率的方法,並提出了新型遙傳儀器連接石英晶體壓力計的方案。
  20. At about 9. 30 pm, a 23 - year - old man made a report to the police saying that while he was walking past a subway connecting shek wai kok estate and luk yeung sun chuen, he saw a man with head injuries sitting inside the subway in

    當晚約九時三十分,一名途經連接石圍角?及綠楊新?行人隧道的二十三歲男子報案,稱發現一名男子頭部受傷、半昏迷坐在行人隧道內。
分享友人