連接處理 的英文怎麼說

中文拼音 [liánjiēchǔ]
連接處理 英文
connecting processing
  • : Ⅰ動詞1 (連接) link; join; connect 2 (連累) involve (in trouble); implicate 3 [方言] (縫) ...
  • : Ⅰ動詞1 (靠近;接觸) come into contact with; come close to 2 (連接; 使連接) connect; join; put ...
  • : 處名詞1 (地方) place 2 (方面; 某一點) part; point 3 (機關或機關里一個部門) department; offi...
  • : Ⅰ名詞1 (物質組織的條紋) texture; grain (in wood skin etc ) 2 (道理;事理) reason; logic; tru...
  • 連接 : connect; fit together; link; marry; mate; joint; association trail; linkage; concatenate; concate...
  1. Dendritic cells are characterized by their ability to efficiently present antigen, and are uniquely equipped to stimulate naive t cell responses. immature dendritic cells acquire antigens from throughout the peripheral body, then migrate to t - lymphocyte - dependent areas of lymph nodes. thus, dendritic cells act as bridges, operating at the interface of innate and acquired immunity

    作為機體免疫系統中功能最強的專職性抗原提呈細胞( antigen - presentingcells , apc ) ,樹突狀細胞( dendriticcells , dc )能高效地攝取、加工和提呈抗原,具有較強的遷移能力,並能顯著地激活初始型t細胞以啟動t細胞免疫應答反應,此外, dc與b細胞以及nk細胞等也存在著相互作用,可見, dc在天然免疫和獲得性免疫之間起著非常重要的作用。
  2. This paper discusses the designing and making of the dynamic testing systems of engine electronic control system. base on the construction and operation principle of santana 2000gsi m3. 8. 2 engine electronic control systems, design and manufacture led circuit of dynamic testing and fault imitating electronic control unit. on the inspect board, design and equip with motronic 3. 8. 2 ecu i / o measuring joints, design and set up obd - ii diagnostic communication link, design and install fuel pressure inspecting meter. depend on the obd - ii diagnostic communication link and ecu i / o measuring joints, this dynamic testing system can inspect engine electronic fuel injection system, distributorless ignition system, idle speed control system and evaporative emission control system, and can inspect m3. 8. 2 sensors, ecu and actuators, and can interrogate fault memory and erase fault memory ; and can analyse data stream ; and can carry out fault imitating. besides, this paper analyses sensors and actuators typical fault w aves

    2電控單元電路器設計製成輸入輸出電子控制檢測端子,並在檢測面板上布置了obd -診斷插座和燃油壓力表。使該動態測試系統能實現對電噴發動機的燃油系統、直點火系統、怠速控制系統和燃油蒸氣排放控制系統的動態檢測;並通過obd -診斷座、 ecu輸入輸出檢測端子和故障模擬單元實現對電噴發動機電控系統各傳感器、電控單元、執行器進行故障碼讀取與清除;動態數據讀取和波形測試和故障模擬等。此外,本論文還分析了傳感器和執行器典型故障波形。
  3. At first, the text is segmented to words and converted to a sequence of part - of - speech tags ; then based on the pos tags sequence parameters and phrase - break distance information from training, markov model is used to get the most likely phrase break sequence

    首先,文本進行分詞,並轉換為一列由詞性標記所組成的序列;然後使用馬爾可夫模型,利用人工標注數據庫訓練詞語詞性標注序列的概率分佈和類型序列的距離信息,得到輸入的詞性標記序列對應的具有最大似然概率的類型序列,最後利用后規則進行適當的糾錯。
  4. The results indicate whether the distribution of mass and the joint of every component are reasonable for the whole frame structure with long distance and multiple elastic bracings will have a relatively great impact on the dynamical performance of the whole structure

    計算結果表明了對于這種長距離多彈性支撐的整體鋼架結構,其質量分佈與各部件的連接處理是否合,對整體結構動態性能影響較大。
  5. Automatic connection handling

    自動化的連接處理
  6. There is one significant difference between disconnected processing in ado and ado. net

    Ado和ado . net中的不連接處理之間存在一個顯著差異。
  7. You can see the part of the generic connection framework that enables http connection handling

    中,可以看到支持http連接處理的那部分通用框架。
  8. Automatic connection handling provides the ability to connect, disconnect, and manage system resources

    自動化連接處理能夠、斷開和管系統資源。
  9. The classical r - tree as index is adopted in spatial joining. r - tree is performed by bulk loading

    在空間連接處理的演算法上採用了經典的r樹作為索引,採用批生成演算法生成r樹。
  10. In case protection inputs / outputs are required from one logic to another, they can be soft - wired, provided they are on the same processor

    兩個邏輯(元件)在同一器上,若彼此需要保護輸入/輸出時,可軟連接處理
  11. Column, i ll introduce you to the three variations of the factory pattern and then show you how it enables connection handling in the midp 2. 0 generic connection framework

    專欄中,我將介紹工廠模式的三種變體,然後展示如何在midp 2 . 0通用框架中工廠支持連接處理
  12. Secondly we use canny arithmetic operators to get the edge of image, and remove the short link of edge then link the edge with small clearance. at last we can calculate the distance of conductor and the width of conductor according to the grade direction to detect of defect of the circuit boards

    然後選用canny運算元提取導線邊緣,並對邊緣進行短分支去除和邊緣連接處理,最後根據梯度方向來計算導線間距離和導體寬度,以此來判斷電路板缺陷。
  13. Through switching over back and forth between internal and external network, this scheme isolates interior network from exterior network in physical link layer at same time, but logic link to each other

    它通過在內外網間來回切換,同一時刻內外網間沒有於物隔離狀態,但又邏輯地相
  14. The path - based approaches break down a query into a set of paths, and join the original joint nodes, but this type of methods usually produce large middle result, therefore seriously reduce query efficiency

    基於路徑匹配的方法通常將一個查詢分解為一組路徑,然後原來分支的節點,然而該類型的結構方法通常導致龐大的中間結果,從而將嚴重影響查詢效率。
  15. A connection manager is a link between a package and a data source that defines the connection string for accessing the data that the tasks, transformations, and event handlers in the package use

    器是包和數據源之間的鏈,用於定義字元串以便訪問包中的任務、轉換和事件程序所使用的數據。
  16. The quadrilateral mesh and a special kind of linear basis function is selected on the rooftop so that the treatment of the attachment of the wire antenna to the surface patch is easier than other methods reported in literatures. using the proposed method, the analyses and prediction of electro - magnetic compatibility of the electrically small conducting structure are achieved, which provides a theoretical guidance in the system level design

    在使用矩量法的過程中,山于在金屬物體表面運用四邊形面元進行剖分,並在面元上選擇了一種特殊的線性基函數,園時在細天線和面元的使用了改進了的方法,使得在細天線與面元電流相的部分較之以往文獻提到的方法更為簡單。
  17. A method of choosing the wind load influence modulus that decides the wind load numerical value of combination structure was proposed correspondingly. firstly the wind load parameter that influences the wind load of combination structure was chosen according to design criterion of high - rising structure and through tradition calculation methods of wind load. by using currently calculation methods the axis force and martix of the most danger section was worked out, and the security of structure was analyzed and checked

    首先運用傳統風荷載計算的方法,結合本文的組合結構的特殊情況,以高聳結構設計規范為參考,參照風荷載論選定了影響該組合結構風荷載的風荷參數,並依據一般塔架演算法(簡化懸臂梁法)計算出了與底座斷面(最危險截面,距塔底6米段)的軸力和彎矩,同時對此進行了應力分析和可靠性校核。
  18. Main problems are the anti - slide test report and inspection record of high strength bolts that connecting structure steels have not been provided according to the requirement of design ; since there is no measurement certificate attached to the test report issued by the jincheng mine project quality inspection station of shanxi coal mine industry administration bureau, it will not be allowed to use these test reports as the one of unit project quality control documents

    主要是未按設計要求提供出鋼架高強度螺栓抗滑移系數試驗報告和檢測紀錄;由山西省煤炭工業管局晉城礦區工程質量檢測站出具的試驗報告無計量認證章,在今後的工程中不能再作為單位工程質量控制資料中的試驗報告。
  19. Both tasks, such as the analysis services execute ddl task and the analysis services processing task, and destinations, such as the data mining model training destination, use an analysis services connection manager

    任務(如analysis services執行ddl任務和analysis services任務)和目標(如數據挖掘模型定型目標)都使用analysis services器。
  20. According to the results of theory and experimental researches in this paper, the design provisions in the " technical code for concrete - filled square tubular structure " ( draft ) are discussed. the load - carrying capacity formulations for end section of beam to at the column - beam connections are proposed

    根據本文的試驗和論研究結果,對( (矩形鋼管混凝土結構技術規程》 (送審稿)帶內隔板的梁一柱栓焊節點設計內容進行了評析,提出了構造建議,並給出了樑柱梁截面的抗彎、剪計算公式。
分享友人