連接負荷 的英文怎麼說

中文拼音 [liánjiē]
連接負荷 英文
connected load
  • : Ⅰ動詞1 (連接) link; join; connect 2 (連累) involve (in trouble); implicate 3 [方言] (縫) ...
  • : Ⅰ動詞1 (靠近;接觸) come into contact with; come close to 2 (連接; 使連接) connect; join; put ...
  • : Ⅰ名詞1 (負擔) burden; load 2 (虧損) loss 3 (失敗) defeat Ⅱ動詞1 [書面語] (背) carry on th...
  • : 荷名詞(蓮) lotus
  • 連接 : connect; fit together; link; marry; mate; joint; association trail; linkage; concatenate; concate...
  • 負荷 : [電學] load; charge; weight
  1. Thus, urban gas load forecasting is an important research. it is a very important research task to forecast city gas load, for one hand, it will affect the planning of city gas pipe network, on the other hand, it is connected to the investment benefits and security of entire natural gas pipelines, and it ’ s meaningful for urban gas optimizing attemperation and gas pipeline optimizing operation

    因此,預知燃氣的大小也就是城市用氣系統的預測是一項非常重要的研究課題,它不僅關繫到城市燃氣管網規劃,還關繫到整個天然氣長輸管線的投資效益和可靠性,對將來各城市的天然氣局域網路的優化調度和城市燃氣管網的優化運行都有十分重要的意義。
  2. The air conditioning or heating water systems with primary water system in heat source or cold source side and secondary water system in load side divided by direct connection mode need to adopt connectors or water mixers

    摘要用直方式劃分熱源(或冷源)側一次水和側二次水的供暖或空調水系統,需要採用通器或混水器。
  3. If the system is connected to real data, it will change the graphics automatically, namely, print the color of the net, analyse which part is electriferous, alert of loads

    系統可以通過數據庫介面和實時數據建立,自動對實時數據的變化作出反應,如:網路著色、帶電分析、報警等功能。
  4. Electricity metering - data exchange for meter reading, tariff and load control - part 42 : physical layer services and procedures for connection - oriented asynchronous data exchange

    電量計.抄表電費和控制的數據交換.第42部分:面向的異步數據交換用物理層使用和程序
  5. Windows 2000 patch : connections to all hosts are terminated when nlb load weight is adjusted

    Windows 2000修補程序:調整nlb量時與所有主機的都被終止
  6. Download details : windows 2000 patch : connections to all hosts are terminated when nlb load weight is adjusted

    下載詳細信息: windows 2000修補程序:調整nlb量時與所有主機的都被終止
  7. Connectors for electronic equipment - tests and measurements - test 10d - electrical overload connectors

    電子設備用器.試驗和測量.試驗10d :器電過
  8. As a result, at all these connection points, the two coaxial cables are connected to different transmission equipment, sharing the traffic load from the tandem switch to a given end exchange, with half of the respective trunk circuits put into use, ensuring network safety. for such connectivity, see figure 4

    因此,在所有的同軸電纜處,都採用兩條同軸電纜到不同的傳輸設備的方法,將匯交換機到某一端局的話務量在這兩條同軸上進行分擔,中繼電路各開一半,從而保證網路的安全性。
  9. And cmac neural network adjusts weights locally, making its approximation quickly. in addition, the output only involves in linear computation, so it is suitable for online application

    此外, cmac網路的受域是一個階躍式的臺階函數,適合於逼近和相應的網損最小的拓撲之間的不續的關系。
  10. The shenzhen western corridor is an additional cross - boundary link between shekou in shenzhen and ngau hom shek in hong kong. the new crossing is intended to relieve the traffic burden on the existing three boundary road crossings

    深港西部通道是新增的跨界通道,深圳蛇口與香港鰲?石,建成后可減輕現有三條邊界通道的交通
  11. For example, outlook can download at night, while it ' s unattended, a time when network loads or applicable connection charges are lower

    例如,您可將outlook設置為在夜間下載郵件,此時系統無人看管,且網路較輕,而且費用較低。
  12. Thermoplastics piping systems - non - end - load - bearing elastomeric sealing ring type joints between pressure pipes and moulded fittings - test method for leaktightness under internal hydrostatic pressure without end thrust

    熱塑管道系統.壓力管和模塑管件的無端彈性密封環型件.在無軸向推力時內部流體靜壓力下密封性的試驗方法
  13. Contacts 3 - 4, 5 - 6 and 7 - 8 are available for load duty, and if required, must be wired in series with the load device or devices, and that series branch circuit connected across a power source compatible with the load

    線端子3和4 , 5和6 , 7和8適用於電,如果需要,應與裝置或其它裝置進行串聯,這些串聯支路電流將兼容電源與載相
  14. To ensure safety, the tdm 10 g transmission equipment can provide protection of self - healing rings and two 155 mbs coaxial connections share the traffic load. for such connectivity, see figure 2

    在安全方面,傳輸的tdm10g設備可以提供自愈環保護, 2個155m同軸對業務進行分擔,安全上有可靠保障。
  15. Test method for axial load temperature cycling of drop cable connector interface

    電纜器介面的軸向溫度循環試驗方法
  16. Qqct is equipped with 24 super postpanamax quay cranes of max. 70 tons / 70 meters and 77 rubber tyred gantry cranes and operated with the most advanced terminal management system navis sparcs / tms connected with radio data terminals for the most efficient and real time terminal management

    技術優勢:現配備24臺最大70噸/外伸距70米的超巴拿馬型集裝箱裝卸橋吊、 77臺輪胎吊,與國際先進的碼頭生產管理系統sparcs / tms和無線數據終端相,實現準確、高效、實時的計劃管理,提供方便快捷的客戶信息查詢。
  17. Furthermore, the north lantau expressway is already forecast to be congested, connection to the cross links will further stretch its capacity

    政府已預測北大嶼山快速公路將會十分擠塞,如再跨界通道,只會進一步加重其
  18. Distribution circuit breaker a distribution circuit breaker is a device used for overload and short current protection of loads connected to a main distribution device

    配電線路開關配電線路開關是給在主配電設備上的提供過載和短路保護的裝置。
  19. In hardware system design, we adopted the microcontroller of at89c51 as the main controller of inferior processor, it is used to connect the modem with the data acquisition module. mcs - 51 assemble language is used to program the software of the device to realize the data transmission between modem and inferior processor. when the electric power in the run is beyond the specified value, the inferior processor can dial the phone number of central computer automatically to send the alarm message through the communication line. using a single - chip microcomputer to control a modem to transmit remote datas are introduced in detail

    隨后詳細地介紹了系統的總體設計思想和具體的實現過程。在硬體系統設計中,採用了at89c51單片機作為下位機主控制器,用於modem和數據採集模塊。通過使用mcs51匯編語言編寫程序,實現了下位機與modem之間的數據傳輸,同時實現了自動檢測,進行撥號報警的功能,其中重點介紹了單片機控制modem進行遠程數據傳輸的方法。
  20. The article probes into the methods of the improvement and the control for high intensity of traffic in e - cube switching system fsr216. 3 while ssp and remote office are overloaded ( include scp and terminated office connecting to e - cube )

    本文就網路的瓶頸問題分別從ssp和鄰局(包括scp和與e ? cube相的端局)發生過時, e - cube程式控制交換機在版本fsr216 . 3中對大話務量的控制方法及改進。
分享友人