連接道路 的英文怎麼說

中文拼音 [liánjiēdào]
連接道路 英文
connecting path
  • : Ⅰ動詞1 (連接) link; join; connect 2 (連累) involve (in trouble); implicate 3 [方言] (縫) ...
  • : Ⅰ動詞1 (靠近;接觸) come into contact with; come close to 2 (連接; 使連接) connect; join; put ...
  • : Ⅰ名詞(道路) road; way; route; path 2 (水流通過的途徑) channel; course 3 (方向; 方法; 道理) ...
  • : 1 (道路) road; way; path 2 (路程) journey; distance 3 (途徑; 門路) way; means 4 (條理) se...
  • 連接 : connect; fit together; link; marry; mate; joint; association trail; linkage; concatenate; concate...
  • 道路 : road; way; path
  1. Firstly, the dissertation discuss that the development city of has a deep bearing on pcee, founded on the relationship of pcee s formation and the shape of city. the suitable layout under some certain conditions of highway and city is recommended in accordance with the impact of highway on bourgeon of city ; quoting the theory of spider network construction, the dissertation demonstrated the optimized number of city entrance and exit fit for the formation and scale of city ; the obtained conclusions are confirmed by three related samples of eastern city

    第一部分從出入口與城市形態相關性入手,論述出入口與城市發展關系;通過公對城市發展影響的分析,提出公與城市合理的形式及適宜條件;利用蛛網結構理論,得出適合大城市規模和形態的最優出入口數量;以東部三個大城市為實例,論證上述相關問題。
  2. Vehicular border link

    邊境連接道路
  3. On the land side, the closed area includes the hkcec and its connecting roads

    范圍:陸上方面,禁區范圍主要包括會展及其連接道路
  4. The ferries, bridges, and tunnels which connect roads

    一、連接道路之渡口、橋梁、隧等。
  5. The proposed improvement to the existing wsd service road and the introduction of new access road within sai kung east country park should be considered in the light of the conservation and recreation objectives of the park itself

    建議改善水務處現有的維修用,以及在西貢東郊野公園內興建新的連接道路的事宜,應從自然保育和郊野公園的康樂目標本身,加以研究。
  6. Debates to be adjourned 1. discovery bay tunnel link bill

    1 .愉景灣隧連接道路條例草案
  7. The tia final report provided in the cd - rom included in volume two of ifp recommended the implementation of a number of road improvement schemes in the form of a number of localized road junction improvements ( schemes 1c, 7, 8 and 9 ), a new link road between yan cheung road and lin cheung road ( scheme 3 ), a new vehicular underpass along lin cheung road ( scheme 4 ) and an elevated road above the western harbour crossing toll booth and additional slip road leading to west kowloon highway ( scheme 6 )

    載于發展建議邀請書第二冊所附光碟的交通影響評估最後報告,建議實施多項改善計劃,包括多條區內口改善計劃(計劃1c 、 7 、 8和9 ) 、欣翔之間的新連接道路(計劃3 ) 、沿一條新的行車隧(計劃4 ) ,以及西區海底隧繳費處對上的架空及通往西九龍快速公的新增(計劃6 ) 。
  8. We know what the gamers need, so we are trying to provide an instant way of rs wow power leveling

    分析了各分電,都正常,難是中途的有毛病。
  9. In communications, a circuit, or channel, interconnecting two exchanges or switching units, capable of being switched at both ends provided with the necessary signalling and terminating equipment

    在通信技術中,兩個交換局或交換機之間的或通,它能夠在兩端之間進行轉,並提供必要的信令和終端設備。
  10. 1. discovery bay tunnel link bill

    1 .愉景灣隧連接道路條例草案
  11. Discovery bay tunnel link regulation discovery bay tunnel link regulation

    愉景灣隧連接道路規例
  12. Discovery bay tunnel link bill

    愉景灣隧連接道路條例
  13. Discovery bay tunnel link

    愉景灣隧連接道路
  14. The discovery bay tunnel link was built by private sector under " build and operate " arrangement and is operated by private company

    愉景灣隧連接道路,由私人機構按興建及營運的安排建造,並由私人公司營運。
  15. High - powered hong kong guangdong joint co - operation conference set up to comprehensively strengthen co - operation with guangdong province and improve co - ordination in the booming pearl river delta area on a range of issues such as trade and economics, infrastructure development, transport links and people flows

    由高層人員組成的粵港合作聯席會議成立,除致力全面加強與廣東省的合作外,還重改善正蓬勃發展的珠江三角洲地區在貿易與經濟基建發展運輸連接道路過關旅客等事務上的協調。
  16. Hy 2003 11 - design and construction of the approach viaduct to the new boundary bridge between lok ma chau and huanggang and associated works

    Hy 2003 11 -落馬洲至皇崗新跨界橋的高架連接道路工程的設計及建造
  17. Unlike tsuen wan and sha tin, tuen mun was nearly 25 km from kowloon and most of the existing road connection was a tortuous 2 - lane road on the coast which, because it was planned in the days before fast motor traffic, twisted in and out as it followed the coast to minimize cutting and filling slopes

    屯門距離九約25公里,在兩者間興建連接道路時,情況與沙田及荃灣有所不同。原有的青山公只有兩條行車線,設計時車輛沒有像今日般快速,為了減少削填斜坡,它是沿著彎曲的海岸線而建。
  18. Driving in excess of speed limit indicated by a speed limit sign of the type shown in figure no. 6 or 7 in the schedule to the discovery bay tunnel link bylaw cap 520 sub. leg. by more than 15 kilometres an hour, other than where item 56 or 57 applies

    以比《愉景灣隧連接道路附例》 (第520章,附屬法例)附表第6或7號圖型所示類型的速度限制標志顯示的速度限制高出逾每小時15公里的速度駕駛,但第56或57項適用的情況除外
  19. Driving in excess of speed limit indicated by a speed limit sign of the type shown in figure no. 6 or 7 in the schedule to the discovery bay tunnel link bylaw ( cap 520 sub. leg. ) by more than 15 kilometres an hour, other than where item 56 or 57 applies

    以比《愉景灣隧連接道路附例》 (第520章,附屬法例)附表第6或7號圖型所示類型的速度限制標志顯示的速度限制高出逾每小時15公里的速度駕駛,但第56或57項適用的情況除外
  20. You ' ll find information and links on the course, locality, ticket sources and costs, road and air connections, local accommodation, and local sights and sounds

    你將在功課,地區,票來源和費用上發現信息和和空氣,本地住所,和本地風景和聲音。
分享友人