連續出鐵 的英文怎麼說

中文拼音 [liánchūtiě]
連續出鐵 英文
continuous tapping
  • : Ⅰ動詞1 (連接) link; join; connect 2 (連累) involve (in trouble); implicate 3 [方言] (縫) ...
  • : Ⅰ形容詞(連接不斷) continuous; successive Ⅱ動詞1 (接在原有的后頭) continue; extend; join 2 (...
  • : Ⅰ名詞1 (金屬元素) iron (fe) 2 (指刀槍等) arms; weapon 3 (姓氏) a surname Ⅱ形容詞1 (形容...
  • 連續 : continuation; succession; series; continuity; continuing; running; continuous; successive; contin...
  1. The devices for detecting phase - to - ground fault in ineffectively grounded systems are seldom functionary at present. based on thousands of experiments in high - voltage laboratory in north china electric power university, the reasons for misjudgment and the effective measures to avoid it are presented in this paper : to change pt connection form to prevent from ill - effects of ferro - resonant overvoltage ; to increase soft measures to resist against interference ; to adopt neural network method to obtain the virtual value of the detect way

    依據上千次實驗,我們找到了一些導致選線誤判的影響因素,並提幾點防止誤判的措施,包括改變pt接線方式,避免磁諧振對選線的影響;通過對故障檢測方式的處理和使用判斷技術增強裝置的軟體抗干擾能力;嘗試採用神經網路演算法設定選線方法的有效域等。
  2. Continuous tapping spout

    沖天爐連續出鐵
  3. Peugeot has suffered four years of sliding profitability, chiefly because an increase in car sales that had been expected in 2002 failed to materialize and the company found itself in a situation of chronic overcapacity

    標致雪龍已經四年現利潤率下滑的局面,主要原因在於2002年時有關汽車銷量增加的預期並未實現,公司已陷入產能長期過剩的窘境。
  4. By face failure and ground subsidence investigation and in - suit monitoring analysis in some lots of shenzhen metro phase line, especially of lot 3a in which two large ground landlides have occurred in construction, the reasons of ground subsidence are expatiated respectively from three aspects, including the characters of the physical mechanical parameters of stratum above tunnel, the monitoring analysis of stratum deformation and contruction technics causation

    通過對深圳地期工程土建施工中全線部分暗挖標段現的工作面失穩、地表塌陷工程實踐和現場監測結果分析,特別著重對2次現地表塌陷的3a標暗挖隧道研究,從隧道上覆地層物理力學性質參數、地層變形監測分析及施工工藝原因3方面闡述了地表塌陷的原因。
  5. Last, two examples, of the response of a bridge with the lead - rubber bearing, were designed and analyzed based on the conclusions and the regression formula from this dissertation

    最後,運用本文得的結論及回歸公式設計鉛芯橡膠支座,並進行路簡支梁橋、城市輕軌梁橋的地震響應分析。
  6. In the course of design, we fully consider the actual conditions on the railway and take a series of corresponding measures to the concrete problem. such as we select high - accuracy microconvertor and have the converted function in succession data collecting system chip aduc812, design v / f circuit and external a / d circuit. in anti - interference of the hardware, we try to disperse each function module to avoid interfering each other, adopt photoelectric isolated technology to dispel the circuit connection of input and output. in controlling we import arithmetic mean into strain wave algorithm and real computing technology of virtual value for sample treatment of data, that is using the software to smooth away interfere error and to calculate actual value, thus it makes the precision of the data improve greatly

    在設計過程中,根據系統要求,充分考慮路上的實際情況,針對具體問題採取了一系列的相應措施,如在器件選擇方面選用高精度microconvertor系列、具有adcdma轉換功能的數據採集微控制器晶元aduc812 ,設計了v f變換電路和外部a d轉換電路;在硬體抗干擾方面,將每個功能模塊盡量分散獨立開來以避免相互干擾、採用光電隔離技術消除輸入輸通道上的電路聯系;在控制方面對于采樣數據的處理引入了算術平均值濾波演算法和真有效值的計算方法,即通過使用軟體來濾除系統中有干擾造成的誤差並計算真值,從而使數據的準確性得到極大地提高。
  7. Introduced development of a kind of bgo scintillator ray detector which used in the continuous metal cast crystallizer for fluid level measurement, the teat result of some electric circuit is also given

    摘要介紹了一種在鋼鑄結晶器液位儀上使用的bgo閃爍體探測器電路的設計,並給了信號處理電路的測試結果。
  8. This paper studies the key techniques involved in the construction of the deep water foundations, long - span prestressed concrete continuous rigid - framed girders and long - span concrete - filled steel tube arches of yichang changjiang river bridge on the newly built yichang - wanzhou railway, and also provides solutions to the possible problems thereof, which may be of certain guiding roles to the practical construction

    摘要對新建路宜昌至萬州線宜昌長江大橋深水基礎、大跨度混凝土剛構梁、大跨度鋼管混凝土拱等施工過程中遇到的關鍵技術問題進行了研究,並對各個問題提了解決方案,對實施性施工有一定的指導意義。
  9. Government ' s strict control on the right of price setting, and the planned distribution of income, combined with unreasonable method of price forming and weak supervision on extra fees collecting, have caused low efficient in railway industry. since 1993, railway as a whole has lost successively for five years

    國家對運價權的高度控制及對收益的計劃性分配,加上定價方式不合理以及對價外收費監管不力等原因,導致路效率明顯低下,以至從1993年起路系統5年現虧損。
  10. Mr yeung said kcrc had another year of good financial results in 2000, the sixteenth consecutive year of profitability

    楊啟彥指,九在二零零零年再一次取得理想業績,這是第十六年錄得盈利。
  11. Abstract : the most critical task in designing a model based on predictive controller is identifying a reasonably good process model. the identification model of mould level of a continuous casting line in a steel plant is very difficult. due to the extremely high stochastic disturbance level, well - known parametric identification methods using random step function, prbs or stochastic test inputs are not successful. the present method based on orthogonal test inputs gives satisfactory results

    文摘:在設計一種基於預測控制器模型時,最關鍵的工作是識別一個合理可靠的過程模型.在鋼廠的鑄造線上識別鑄模液位模型是很困難的,由於極高的隨機干擾水平,使得眾所周知的隨機階躍函數, prbs或隨機試驗輸入等參數識別方法都以失敗告終.而本文介紹的基於正交檢測的方法給了令人滿意的結果
  12. Gao zi - you, song yi - fan, si bing - feng. urban transportation continuous equilibrium network design problem : theory and method [ b ], china railway publishing house, beijing, 122, 2000

    高自友,宋一凡,四兵鋒.城市交通平衡網路設計理論與方法[ b ] ,中國版社,北京, 122 , 2000 。
分享友人