連續鋼筋 的英文怎麼說

中文拼音 [liángāngjīn]
連續鋼筋 英文
continuity reinforcement
  • : Ⅰ動詞1 (連接) link; join; connect 2 (連累) involve (in trouble); implicate 3 [方言] (縫) ...
  • : Ⅰ形容詞(連接不斷) continuous; successive Ⅱ動詞1 (接在原有的后頭) continue; extend; join 2 (...
  • : 鋼名詞(鐵和碳的合金) steel
  • : 名詞1 (肌的舊稱) muscle2 [口語] (肌腱或骨頭的韌帶) tendon; sinew 3 [口語] (可以看見的皮下靜...
  • 連續 : continuation; succession; series; continuity; continuing; running; continuous; successive; contin...
  • 鋼筋 : concrete iron; concrete reinforcing bars; rebar; reinforcing bar; reinforced bar; reinforcing ste...
  1. To avoid manual labor of chiseling - grossness, in the area of second - stage concrete construction, permanently non - removed metal molding boards nets are used as molding boards of first - stage concrete. substitution joints of reinforcing steel bars for traditional electric welding and usage of equipments for joints of reinforcing steel bars efficiently improve strength of junctions and rate of connecting reinforcing steel bars, and safety of construction and stability of quality, and greatly reduce cost. it ' s possible that three gorges project become top - ranking project in the world by study on systems engineering of high - strength concrete construction

    混凝土縫面處理採用高壓水流沖毛技術,大大提高了施工工效,減少了倉面污染;模板工程大量採用定型模板施工技術,提高了壩體混凝土成型質量和工程進度;在二期混凝土施工區域,為免除人工鑿毛勞動強度,採用永久性免拆金屬模板網作為一期混凝土模板;接改進傳統的電焊接方式,採用大量採用接頭機械接技術,有效提高了接頭強度和接速度,施工安全性大大加強,質量穩定性有效提高,經濟成本大大降低;三峽二期工程持高強度混凝土施工系統工程的研究,使三峽工程成為名符其實的「世界一流工程」成為可能;三峽二期工程混凝土溫控綜合技術的應用,有效降低了壩體混凝土溫度的產生;混凝土表面處理及裂縫處理技術的應用,提高了建築物的整體性和耐久性。
  2. The prestressed continuous beam - arch composite bridges are a special structural system where the horizontal thrust of the arch rib is absorbed by a prestressed tie at deck level. in some cases, this type of structure is preferable because it does n ' t have the large thrust at the spring hi traditional arch bridges and the somewhat large bending moment and shear force in traditional beam bridges. as a result, the performances of the prestressing reinforcement can be efficiently utilized

    它利用拱肋承擔壓力,系梁預應力束抵抗拱端推力,吊桿及縱橫橋面系結構承受橋面荷載,既克服了傳統拱橋巨大的拱端推力,又改善了梁橋較大的彎矩和剪力的受力狀況,最大限度地發揮了拱梁混凝土和預應力各自的特點,經濟效益顯著。
  3. Strengthening of a reinforced concrete continuous box girder bridge

    混凝土箱梁橋的加固
  4. This paper approaches reinforcement fabric cover, reinforcement fabric joint, reinforcement fabric embedded inserts, wall anchorage depth and wall joint form during the design of underground continuous walls, meanwhile, some problems affecting wall quality in the various sectors during construction are also discussed, including reinforcement fabric installation, groove bottom hole cleaning and quality testing equipment

    本文對地下墻設計過程中的網保護層、網接駁、網預埋件、墻體錨固深度、墻體接頭形式以及施工過程中網安裝、槽底清孔、質量檢測設備等各個環節中影響墻體質量的一些問題進行了探討。
  5. As for the simply - supported slabs, the influence of the specimen fire proof properties is tested under the different concrete intensified degrees, under the different thickness of cover and under the different concrete quota. as far as the three - span continuous slabs are concerned, a series of analysis are conducted, including the specimen internal force redistribution under the different fire condition, the specimen deformation properties, features of the specimen destroying mechanism and the fire proof capability under the various condition

    對簡支板,考察了不同混凝土強度等級、不同的保護層厚度、不同配率等對構件抗火性能的影響;對三跨板,考察了不同受火工況下構件的內力重分佈變化情況、構件的變形性能以及構件破壞機構的特點;分析了各工況下構件的抗火性能的差異。
  6. This dissertation generalizes the test on the full - scale reinforced concrete simply - supported slabs and three - span continuous slabs under fire at the normal loading condition. the conclusion can be drawn from the test about the deformation of the both kinds of slabs and the specimen section temperature distribution. meanwhile, the failure modes, mechanism and internal force redistribution of the continuous slabs are analyzed

    本文對足尺混凝土簡支板、三跨板進行了恆載下的受火試驗研究,通過試驗,給出了混凝土簡支板和板在高溫下的變形、構件截面溫度分佈規律;分析了板的內力重分佈和破壞機構的特點。
  7. Based on the continuous damage theory, considering the shear effect, the high - order shearing, flexural and in - plane deformation coupling model is built ; through the nonlinear fem analysis of rc beams strengthened with frp, the damage theory and damage course is researched ; compared with experiment results, it shows that the model is effective ; the fem analysis software is prepared to provide simple and effective method for the engineering application ; using the soft the frp strengthened beams before and after damage is modeled so as to provide the theory base for engineering application

    摘要基於損傷理論,考慮膠層的剪切效應,建立frp加固混凝土梁的高階剪切彎曲及面內變形耦合模型,編制了有限元分析的軟體,進行非線性有限元分析;通過與已有的試驗結果進行對比,證明該模型的簡單,有效性;利用該軟體對未加固混凝土梁,初始進行加固的混凝土梁以及最大拉應變達到極限值時進行加固的混凝土梁等幾種情況進行數值模擬。
  8. In light of the simulative research results, three methods are applied to analyze some controversial problems in this kind of structural system ( such as the concrete pouring sequence of continuous ends, the applying sequence of pretensioned force, the removal of the temporary supports, the concrete pouring style of continuous ends, the optimization of constructional reinforcement and prestressed reinforcement ). some important conclusions are drawn : the concrete pouring sequence of continuous ends should be in accordance with the principle of " interval end " ; the removal of temporary supports is also on this principle ( opposite to traditional opinions ). at the same time, other problems such as the shrinkage and creep effects of concrete, the c racking and failure pattern, the optimization of reinforced bars and prestressed bars are also analyzed in detail

    在此基礎上,對于目前先簡支后結構體系中存在的一些有爭議的問題(如后端部澆築和后預應力張拉的順序、體系轉換中的臨時支座拆除順序、后端部澆築方式、后端部的預應力及普通的優化等) ,我們分別運用三種方法進行了細致的模擬分析、研究,並得出了一些具有重要工程意義的結論:后端部的澆築順序和后預應力張拉的「隔跨」原則,臨時支座拆除的「隔跨」原則(此前人們一直認為「對稱澆注和對稱張拉」是最為合理的施工工序) ,混凝土的收縮、徐變對先簡支后結構體系的影響一般較小等。
  9. The testing results indicate that the hrb400 continuous reinforced beam not only can achieve plastic internal force redistribution thoroughly and also has enough capability in the amplitude adjustment and can achieve the quotient designed

    試驗研究結果表明, hrb400級混凝土兩跨梁能夠達到完全的彎矩重分佈,並且具有足夠的調幅能力,能達到設計的調幅系數。
  10. As we all know that damage constitutional law of concrete is fit for solving mass little cracks situation, that fracture mechanics model is fit for solving only a few cracks situation, that separate crack model is only fit for dealing with those cracks whose locations is known firstly. but these situations do n ' t reflect the crack characteristic of the steel liner - reinforced concrete penstocks of the three gorges. so, this paper adopts the smear crack model to simulate crack

    基於損傷力學模型更適合解決成群微裂縫問題,斷裂力學模型更適合解決少數裂縫情形,離散裂縫模式只能解決裂縫位置預先知曉的情形,這些都不符合三峽水電站混凝土引水壓力管道的裂縫特點,為此本文採用彌漫裂縫模式來進行裂縫的數值模擬,該裂縫模式能解決裂縫位置預先不知曉的情形,且能分析而無須重新劃分網格。
  11. A high degree of continuity can be achieved just providingthe slab with rebar running along the column. furthermore, stiffness and ultimate resistancecan be controlled in a rather simple way by a suitable selection of steel connection detailingand amount of reinforcement

    這種組合節點可以通過混凝土板內的縱向實現組合梁在不同跨之間的性,而且通過選擇合適的型樑柱接方式和縱向數量,可以有效地控制節點的剛度與承載能力。
  12. The study on the behavior of semi - rigid joints in steel - concrete composite frames gets widely attention recently. a high degree of continuity can be achieved at a very low cost just providing the slab with rebar running along the column. furthermore, stiffness and ultimate resistance can be controlled in a rather simple way by a suitable selection of steel connection detailing and amount of reinforcement

    -混凝土組合框架中半剛性組合節點性能的研究近來引起了廣泛的關注,這種節點形式花很低的成本就可以通過混凝土板內的縱向實現組合梁在不同跨之間的性,而且通過選擇合適的型樑柱接方式和縱向數量,可以有效地控制節點的剛度與承載能力。
  13. Shear capacity of r c continuous short beams

    混凝土短梁受剪承載力計算
  14. Especially the bridge engineering has to be concerned with high, new and difficult technologies. new technologies firstly adopted are post - tensioned prestressed concrete simply - supported box girder, assembly two - way prestressed concrete simply - supported t - girder, reinforced concrete continuous rigid frame, and steel - concrete composite continuous girder. all these have formed a series of new bridge structures taking prestressed concrete simply - supported box girder as main feature

    由於秦沈客運專線的特殊技術要求,在鐵路建設史上首次採用了后張法預應力混凝土箱形簡支梁、裝配式雙向預應力混凝土t形簡支梁、混凝土剛構梁、與混凝土結合梁等橋跨結構,形成了以預應力簡支箱梁橋跨結構為主要特徵的一系列橋梁新結構。
  15. Lu, w. y., lin, i. j., hwang, s. j., and lin, y. h., ( 2003 ) “ shear strength of high - strength concrete dapped - end beams, ” journal of the chinese institute of engineers, vol. 26, no. 5, pp. 671 - 680

    李宏仁、黃世建, ( 2002 )混凝土結構不區域之剪力強度評估-軟化壓拉桿模型簡演算法之實例應用,結構工程,第十七卷,第四期,第53 - 70頁。
  16. Construction of on site pouring reinforcement concrete continuous beams of chongqing longquan avenue overpass

    重慶龍泉路立交橋現澆混凝土梁施工
  17. Continuously reinforced concrete pavement crcp

    連續鋼筋混凝土路面
分享友人