連龍海 的英文怎麼說

中文拼音 [liánlónghǎi]
連龍海 英文
longhai lian
  • : Ⅰ動詞1 (連接) link; join; connect 2 (連累) involve (in trouble); implicate 3 [方言] (縫) ...
  • : Ⅰ名詞1 [動物學] (古代傳說中的神異動物) dragon2 (古代巨大的爬行動物) a huge extinct reptile:恐...
  • 龍海 : long hai
  1. The main contents include : water environment, marine sediment and the trend monitoring of marine life quality ; at the same time, to consolidate the monitoring of the functional zones, such as seashore bathing places, oceanic reserves, marine aquafarms ; to set up the seashell monitoring and controlling zones in the sea areas of both pingtan and yunxiao at the first time ; to carry out the statistical monitoring of polder, exploiting sea sand, spartin aallerni flora, terrestrial sewages, etc., to carry out monitoring of the total quantity of pollutants into the offshore marine areas in the min river, the jiulong river as well as the municipal sewages of xinlin industry in xiamen and jiaocheng in ningde ; to carry out the red tide monitoring in the offshore marine areas of fujian province ; to implement time - lapse, pointing and continuous red tide monitoring of high frequency and high intensity in the sandu gulf, the min river estuary and offshore marine areas of xiamen

    主要內容包括水環境、洋沉積物和洋生物質量的全域環境趨勢性監測,同時加強了水浴場、洋保護區、水增養殖區等功能區監測;首次在平潭和雲霄域設置了貝類監控區;開展了圍填砂開采、互花米草、陸源排污口統計監測;並在閩江、九江、廈門杏林工業排污口、寧德蕉城市政排污口鄰近域開展污染物入總量監測;在全省近岸域開展赤潮監視監測,對三都灣、閩江口、廈門近岸域赤潮監控區實施高頻率、高密度的定時定點續監測。
  2. The salt water system drawing for the kowloon south no. 2 pumping station and its reservoir andor the latest planning report would be useful to our understanding of the proposed salt water reticulation to the north of the development area via the pcwa. may we obtain a copy of them

    為了解經公眾貨物裝卸區接發展區北面的擬議鹹水管道網,九南二號水抽水站及其配水庫的鹹水系統繪圖及或最新規劃報告對我們甚為有用,可否給我們一份復本?
  3. Dalian pacific hailong technology co., ltd is a high - tech enterprise specialized in researching and developing bio - active substance in ocean lives and production of marine healthy food

    太平洋科技有限公司是專業從事洋生物活性物質研究開發和洋健康食品生產的高科技企業。
  4. The location of zhongqi : localed in ancient east zhou dynasty, the hometown of famous poet in tang dynasty dufu. longhai subway, country road 310, the lianhuo highway near our factory, easy for the travel. and only 40 minutes way to the shaolin temple and longmen grotto

    中啟地理:地處古東周、唐朝詩聖杜甫故里,隴鐵路、 310國道,霍高速門前經過,交通十分便利,距世界名剎少林寺、世界文化遺產門石窟只有40分鐘路程。
  5. With reference to the cantilever erection of the continuous steel box girder of zhuanxing road overhead bridge crossing shenfengjin expressway in shanghai, this paper mainly describes the application of plc - controlled hydraulic sync jack - up system to the balanced cantilever erection of the box girder, closure construction of the girder at midspan, and the operation, control key points and corresponding technical requirements for application of the system

    摘要結合上莘奉金高速公路顓興路跨線續鋼箱梁懸臂架設施工,重點闡述了plc控制液壓同步頂升系統在鋼箱梁「對稱懸拼,跨中合」中的應用及操作控制要點、技術要求。
  6. Can build 2 - 3 ornamental breakwaters in a line west from hkcec, linked by ornamental pedestrian bridges to provide a promenade in the harbour, and to shelter an area for international dragon boating

    可以由香港會議展覽中心以西興建2至3道美觀並成一線的防波堤,並以美觀的行人天橋接,以形成一道中長廊及一個可供國際舟賽的平靜水域。
  7. The west kowloon reclamation will provide housing for more than 100 000 people, commercial space and vital road and rail arteries linking kowloon with the new airport and north - west new territories

    西九區將為超過10萬名居民提供住所,並設有商業用地。該填區也為接九與新機場和新界西北部的重要道路及鐵路干線,提供土地。
  8. After breakfast, sightsee new - aged volcanic sightseeing areas : black dragon hill ( crater, stone sea ), buried - hill ( birch forest, bagua lake, ) ; sightsee the second and third lakes of the five great chain lakes, return to harbin by bus

    早餐后,游覽新期火山觀光區:黑山(山顛火口、石) 、火燒山(樺林幽靜、八卦湖、噴氣錐、噴氣碟) ;瀏覽五大池二池、三池,乘車返回哈爾濱。
  9. The two - kilometre western harbour crossing is the first six - lane cross - harbour road tunnel in hong kong. opened in 1997, it links sai ying pun on hong kong island and the west kowloon reclamation near yau ma tei in kowloon

    西區底隧道在一九九七年?用,全長兩公里,接港島西營盤與九油麻地附近的西九區,是香港第一條六線過行車隧道。
  10. The two - kilometre western harbour crossing is the first six - lane cross - harbour road tunnel in hong kong. opened in 1997, it links sai ying pun on hong kong island and the west kowloon reclamation near yau ma tei in kowloon. it was used by an average of

    西區底隧道在一九九七年啟用,全長兩公里,接港島西營盤與九油麻地附近的西九區,是香港第一條六線過行車隧道。
  11. Route 3 - starting from sai yun pun and across the harbour via the western harbour crossing to the newly constructed western kowloon highway. it extends further to the north from tsing yi to yuen long via a tunnel through tai lam country park

    三號干線-以西營盤為起點,經西區底隧道,接西九快速公路,再由青衣經過一條貫穿大欖郊野公園的隧道向北伸展至元朗。
  12. This proof following enterprise already through the authentication, and has set up a file in the dongguan 114 nets industry and commerce enterprise database, inquires the more detailed enterprise material, please dial the dongguan enterprise information desk 96060 ( artificially ) 9686810114 billion ( to be automatic ), this enterprise numbers for 48267

    茲證明珠嘉倫藥業集團光彩大藥房鎖有限公司石田分店已通過認證,並已在東莞114網工商企業數據庫中備案,查詢更詳細的企業資料,請撥東莞企業查詢臺96060 (人工) 9686810114 (自動) ,該企業編號為48267 。
  13. The tia final report provided in the cd - rom included in volume two of ifp recommended the implementation of a number of road improvement schemes in the form of a number of localized road junction improvements ( schemes 1c, 7, 8 and 9 ), a new link road between yan cheung road and lin cheung road ( scheme 3 ), a new vehicular underpass along lin cheung road ( scheme 4 ) and an elevated road above the western harbour crossing toll booth and additional slip road leading to west kowloon highway ( scheme 6 )

    載于發展建議邀請書第二冊所附光碟的交通影響評估最後報告,建議實施多項道路改善計劃,包括多條區內道路的路口改善計劃(計劃1c 、 7 、 8和9 ) 、欣翔道與翔道之間的新接道路(計劃3 ) 、沿翔道一條新的行車隧道(計劃4 ) ,以及西區底隧道繳費處對上的架空道路及通往西九快速公路的新增接路(計劃6 ) 。
  14. The construction of phase iii started in september 1935 and was completed in 1939, when the third cross - harbour pipeline had been laid. this phase included the laying of twin cross - harbour pipelines that connected kowloon and hong kong island, the building of the tunnel and pumping station, the heightening of the main dam from 115 ft. to 275 ft. and the construction of an auxiliary dam, named the pineapple pass dam

    第三期工程於1935年9月展開,至1939年第三條底輸水管建成后才告完工,主要工程包括兩條接九至香港的底輸水管、接水塘與供水網路的輸水隧道、抽水機、主壩由115尺加高至275尺,以及興建82尺高的菠蘿凹副壩。
  15. Fifth harbour crossing - a cross harbour rail between kowloon and northshore of hong kong island

    第五條過鐵路:一條接九與港島北的過鐵路;
  16. New projects to be examined in the rds - 2 include the west rail ( phase ii ), the east kowloon line, a fourth cross - harbour rail link, the north hong kong island line, a second connection from the ma on shan railway to the urban areas and the west hong kong island line

    現正審議的計劃,包括西鐵(第二期) 、東九線、第四條過鐵路線、北港島線、接馬鞍山鐵路與市區的第二條鐵路線,以及西港島線。
  17. Six sound mountainous region area is located within the boundaries of the hebei province qinhuangdao lulong shimen town, is located northeast our country huabei pingyuan the beijing and tianjin tang qin economy to move in a circle the area, east is near bohai sea, west depends on luanhe river, north the pillow mt. yanshan - odd arteries, south depend on 205 federal highways and the jingshan railroad parallel transportation skeleton line ; by a series of lianshan, the rivers, the village are composed, about area approximately 8 square kilometers

    六音山地區位於河北省秦皇島市盧縣石門鎮境內,位於我國華北平原東北部京津唐秦經濟環行地區,東臨渤,西依灤河,北枕燕山余脈,南靠205國道與京山鐵路并行交通干線;由一系列山、河流、村落組成,面積約8平方公里左右!
  18. However, this route alignment offered few options to serve the proposed boundary control facilities. therefore, the landing point has been moved south for the road to slope down along the southern coast of the black point headland. this alignment leads to the flat area around lung kwu sheung tan, which is the only viable location for the proposed boundary control facilities

    然而,此公路路線可供接擬建的邊界口岸設施的方案很少,因此,經修訂的建議是把著陸點南移,使路線沿爛角咀角的南岸開始鋪築,沿山坡往下興建,然後到達鼓上灘的平地。
  19. Kwun tong is situated at the eastern part of the kowloon peninsula, and its boundary stretches from lion rock in the north to lei yue mun in the south, and from the winding paths of kowloon peak in the east to the north coast of the airport ( kai tak ) runway in the west

    觀塘區位於九半島的東面,北望獅子山,南臨鯉魚門,東飛鵝山的蜿蜒山徑、西接舊機場跑道以北的岸。
  20. The article analyzed the passenger transport status of bohai gulf and east area of china, ship type structures and problems of domestic passenger transport fleet, status and development of coastal passenger transport volume, and passenger / rolling ship type of course on dal ian - yantai, dalian - weihai, dalian - longkou, dalian - xingang, dalian - shangh ai. based on history data and materials, used metrology and economy model to forecast the passenger and vehicle transport volume for the future

    本文對渤灣及華東地區客運現狀、國內客運船隊船型構成及存在的問題、沿客運量現狀及發展進行分析,對大?煙臺、大?威、大?口、大?新港、大?上航線客滾船型進行技術經濟分析。根據歷年發展數據和資料,用計量經濟學模型對今後各年的客運量和車運量進行預測。
分享友人