進口建築物 的英文怎麼說

中文拼音 [jìnkǒujiàn]
進口建築物 英文
inlet structure
  • : 進構詞成分。
  • : Ⅰ名詞1 (人或動物進飲食的器官; 嘴) mouth 2 (容器通外面的地方) mouth; rim 3 (出入通過的地方) ...
  • : Ⅰ動詞1 (建築) build; construct; erect 2 (建立; 設立; 成立) establish; set up; found 3 (提出;...
  • : 築名詞(貴陽的別稱) another name for guiyang
  • : 名詞1 (東西) thing; matter; object 2 (指自己以外的人或與己相對的環境) other people; the outsi...
  • 進口 : 1 (船隻進港) enter port; sail into a port2 (外貿進口) import3 (入口) entrance; [機械工程] i...
  1. Andrew, with binoculars, was already scanning the dockside and port buildings coming into view.

    安德魯舉起瞭望遠鏡,掃視著入視野的碼頭和港上的
  2. In this paper, the finite - element numerical analysis calculation is applied to the foundation of high - rise and multi - floor building and the evolvement law of stress and displacement of tunnel used by urban traffic to explore the mutual influence between the wall rock of underground space and high - rise building foundation, taking account of the specific construction situation in the " sanmu garden " project in dadukou district in chongqing, from the perspective of underground space static - force structure stability analysis to open a underground tunnel with 6m in span and 7. 5m in height for track traffic 20m below the surface. this paper, taking considerations of three different states, i. e. the natural state without any artificial interference, the state of high - rise buildings on the surface, and the underground tunnel state with excavation for track traffic, and four plane lines and four vertical lines, analyzes and studies the distributing law of stress and displacement of calculation section from the following aspects : ( 1 ) the main stress vectorgraph, displacement distribution graph ( ux, uy ) and chromatogram graph of stress isoline ( 1, 2, xy ) of section under different states ; ( 2 ) the contrastive distribution curve of stress ( 1, 2, xy ) of different plane and vertical lines under the same state ; ( 3 ) the contrastive distribution curve of stress ( 1, 2, xy ) of the same plane and vertical lines under different states, wishing to provide references for underground space utilization and project designing and construction of the tunnel under high - rise buildings in the future

    本文結合重慶市大渡區「三木花園」開發設項目,從地下空間靜力結構穩定性分析角度出發,針對在該項目中涉及的高層和多層以及在其地下20米處開挖了一個用於軌道交通的跨度6米,高7 . 5米的地下隧道這一具體工程情況,採用2d - 3d -有限元結構分析程序對高層與多層的地基基礎及其與城市軌道交通使用的地下隧道圍巖的應力與位移演變規律行了有限元數值分析計算,探索了地下空間圍巖與高層或多層地基基礎之間的相互影響,通過考慮未受到任何人為擾動影響的天然狀態、地表存在多層或高層狀態和地下開挖用於軌道交通的地下隧道狀態等三種不同狀態以及4個水平剖線和4個垂直剖線等不同情況,從以下幾個方面具體分析研究了計算斷面的應力與位移分佈規律: ( 1 )在各種不同狀態下計算斷面的主應力矢量圖、位移分布圖( ux 、 uy )以及應力等值線色譜圖( _ 1 、 _ 2 、 _ ( xy ) )等; ( 2 )相同狀態下不同水平與垂直剖線的應力_ 1 、 _ 2和_ ( xy )對比分佈曲線; ( 3 )不同狀態下相同水平或垂直剖線的應力_ 1 、 _ 2和_ ( xy )的對比分佈曲線等,為今後在對地下空間的開發利用以及在高層地下開挖硐室時的工程設計和工程施工提供參考依據。
  3. By the scale of 1 : 35 flood - relief model test, combined the structures built and the pump entrance will be built of baishan dam, to decide the overall arrangement of the water cushion

    通過1 : 35比尺的整體泄洪模型試驗,結合白山已及籌的白山大泵,選定水墊塘的總體布置方案。
  4. Based upon the present regulation, the design and construction check and structure strength check, the electric power generation water inlet anchor gate crane platform ' s hydro - engineering structure of fushui power plant were conducted and an analysis for the reasons of building structure fracture was carried out

    摘要行了富水電廠發電閘門啟閉機平臺安全檢測,依據現行規?對其行了設計與施工復核、結構的強度復核和的裂縫成因分析。
  5. With analyzing of the case study and based on simulating and analyzing quantitatively, this article, considering the goal of the performance - based fire - protection design is protecting occupants from being injured and keeping buildings from being damaged, thought that fire compartmentation of a large building of saling books can be divided according to their saling malls and fire compartmentation in the saling mall can be separated by the fire - proof screen. on the evacuation design, the quantity of safety exits around these buildings and the evacuation width should be increased if possible and the safety exit number, exit width and evacuation distance can be determined according to the simulating results on smoke layer temperature and height, concentration of co2 and co, occupants evacuation time and visibility. on the means of preventing and discharging smoke, the most proper measure should be determined according to their geometrical characteristics and the natural means of discharging smoke is feasible to the large building of saling books. based on analyzing of smoke

    通過對案例分析研究,本文認為大型書城性能化防火設計研究的最終目的是保證人員生命安全和保證結構安全,在模擬計算和量化分析的基礎上,大型書城的防火分區可以將中庭連通的書城區域劃分為一個區,在書城場地內可以採用防火卷簾行防火分區劃分;在人員疏散設計中,應盡可能利用書城賣場的空間設計較多的安全出和增大疏散寬度,其安全出數量、寬度和疏散距離可以根據人員安全疏散時間和煙氣溫度、沉降高度、 co2濃度、 co濃度、能見度模擬計算結果驗證確定;在防排煙方式的選擇上,應當根據的幾何特點選取最適宜的措施,就大型書城而言,採用自然排煙的方式是可行的。
  6. While carrying out the scheme, at first, the basic theory of antenna, array antenna and electromagnetic absorption, the performance parameter of antenna and parabolic antenna are deeply researched. in conformity, the characteristic and calculation of aperture field and near - to - far - field transformation for radiation pattern are detailed analyzed. second, the factors such as, the amount of the antenna elements, mutual coupling between each element, ground and the buildings on earth ' s surface, which affect the performance of array antennas ’ resultant field are stressed discussed

    在系統實現過程中,課題首先從天線、陣列天線,以及電磁場計算方法的基本理論著手,分析了天線與拋面天線的各項性能參數,以及天線的面場和近-遠區輻射場的特點和計算;而,更加深入的討論和研究影響天線陣列合成場強的各項因素,包括系統所使用的天線單元個數對陣列合成場的影響、天線單元之間由於互耦造成的影響、傳播過程中地面和/或地面的影響等。
  7. In little shop of treasures, you just purchased a building in a small town to open your import shop, but you don ' t have any money left to fix up the joint

    在寶的小商店,你剛剛購買了在一個小的城鎮中的一楝開你的貨商店,但是你沒有任何的錢左邊整理關節。
  8. In this paper, we study the most serious damming section of the east - one main canal, which is from the entrance of the hao wan flume ( chainage12 + 123. 6 ) to the exit of shang tian yuan tunnel ( chainage24 + 091. 1 ). the main content is analyzing the flow characteristic of the canal, setting up mathematical model of the discharge condition of the east - one main canal, according to the survey section and actual roughness factors, building, bend and so on, we divided the canal into more than loocaculation segments. each segment is calculated by microsoft excel electrical table through computer as permanent transition flow of non - prismatic channel

    本論文研究的渠段為陸渾灌區東一乾渠壅水最為嚴重的渠段,從郝灣渡槽(樁號12 + 123 . 6 )至上天院隧洞出(樁號24 + 091 . 1 ) ,其主要內容是,分析渠道水流特徵,立東一乾渠輸水狀況的數學模型,根據測量斷面及實際糙率、、彎道等因素的不同,將渠道劃分成120多個計算段,每段按非稜柱體恆定漸變流,運用microsoftexcel電子表格行編程計算。
  9. The outline tests on the alignment of spur dikes in the flume with repeated tidal flow were carried out based on the alignment of the regulation structures in the north trough of the deep waterway in the yangtze estuary

    摘要結合長江深水航道治理二期工程北槽中整治的布置形式,在潮汐往復流水槽中行了丁壩群不同布置形式的概化試驗。
  10. Simulating random movement of sea wave in the wave basin and making researchs into the action of sea wave on coastal and offshore structures could provide the reliable basis for engineering design and scientific experimentation

    在實驗水池中模擬海上多向不規則波浪的隨機運動現象,而研究波浪對海洋工程與港的作用,可為工程設計與科學實驗提供可靠的依據。
  11. Based on the structural features of semi - cylinder composite dike in the yangtze estuary deepwater channel regulation phase project n a section, the key technique of such semi - cylinder transportation procedure and precasting quality is analyzed and summarized, which may serve as a reference for relevant construction

    摘要依據長江深水航道治理二期工程n a標整治中半圓體混合堤結構形式,對這種半圓體大型構件出運工藝與預制質量控制的技術關鍵行分析總結,供同行參考。
  12. It calls for the buildings there to be reconfigured into smaller units with ground level access, to convert a massive sun - blasted square into smaller shaded public spaces, and to ensure access and activities throughout the day and weekends.

    ,把分拆為較細小的發展項目,並以地面作把一大片廣受陽光暴曬的戶外空地,變為蔭蔽的公眾空間,同時保證不論平日或假期,公眾都可享用到這片空間活動。
  13. All water conveyance and water discharge structures are designed to locate at right bank strip ridge, due to special topography and land form. large excavation area and steep slope raising from close plan locations of adjacent structure lead to slope stability. in general, slope stability analysis and treatment are concerns of zipingpu project

    由於其特殊的地形、地貌,工程的各輸、泄水共7條隧洞均布置在右岸條形山脊內,各相鄰的平面位置距離較近,開挖范圍大、坡度高且陡,存在著大量因開挖而形成的高邊坡穩定問題。
  14. Gullies for buildings - part 4 : access covers ; german version en 1253 - 4 : 1999

    的雨水.第4部分:入封蓋
  15. Gullies for buildings - part 3 : quality control ; german version en 1253 - 3 : 1999

    的雨水.第3部分:質量控制
  16. The paper makes the analysis of an engineering accident of the cracking of adjacent existing buildings caused by surface subsidence from groundwater lowering during the construction of large diameter dig - hole piles, finds out the cause, presents the treatment scheme and effectively guarantees the smooth conducting of the project

    該文對由於大徑人工挖孔樁施工降水引發地面沉降,造成鄰近開裂的工程環境事故行了分析,查明了原因,並提出了治理的方案,有效地保證了工程的順利行。
  17. The construction scheme is briefly introduced herein, and furthermore, the diversion structures, the composite scheme consisting of open caisson group adopted to treat the overburden of the foundation for the stage 2 longitudinal concrete cofferdam and the diversion method of bottom outlet combined with the dam gap used for the stage 2 diversion are described as well

    文中對該方案行了簡要介紹,並介紹了有關導流,以及二期縱向混凝土圍堰堰基覆蓋層採用了沉井群等綜合處理方案和二期導流採用的底孔加缺聯合泄流方式。
  18. At present, many fields remain to further research, especially the profound combination of gis technique with ece ( estuarine and coastal engineering ), which should be developed for the purposes as follows : ( 1 ) to serve the huge comprehensive work in changeable natural conditions and difficult construction conditions which takes a long period and covers a large region, e. g. the regulation work of deepwater channel in the yre ( yangtze river estuary ) ( 2 ) to combine the gis with applied numerical model ( 3 ) to study the hydrodynamic processes and characteristics of waves, tidal currents and sediment transport, as well as the affection carried by the regulation work in an estuary ( 4 ) to monitor and to analyze ees ( evolution of erosion and sedimentation ) and the variation of riverbed ( 5 ) to play a role of dynamic supervising of a engineering project

    目前尚有許多有待一步研究的領域,尤其是以服務于長江深水航道治理這樣規模大、周期長、影響區域廣、自然條件復雜、施工情況多變的國家重點工程為目的,將gis與專業應用數學模型結合,對河海岸波浪、潮流、泥沙運動的動力機制,以及整治工程對其影響的研究,對入海航道沖淤和河勢演變的監測分析,對施工展和工程效果實現「動態」監控和管理,尚缺乏同gis技術的深入有效結合。
  19. On the basis of the design and calculation of such space truss system, this paper has analysed and summed up the experiment dataes of the wind tunnel test and made a deeply research and analysis on this kind of structure which undergoing complicated wind load. compare the wind load values which gained by calculating according to load criterion and the wind tunnel test separately and then analyze and compare the two different results got by static wind load and dynamatic ones separately. at last, analyze the two outcomes through these two different methods which in virtue of finite element program midas

    本文在鹽田碼頭閘的工程設計基礎上,分析總結了對該行風洞試驗的試驗數據,並對利用風洞試驗數據計算所得風荷載值與按規范計算所得的風荷載值行了比較,然後藉助有限元軟體midas對該結構在靜力風荷載作用下和動力風荷載作用下的節點位移行了計算分析和比較。
  20. However if these breakthroughs are to be is be realised in practice a paradigm shift in synthetic chemical techniques will be necessary so we can create at will really large molecules with accurately defined structures at the atomic level

    這些基礎性的展暗示著在我們袋中的超級電腦(以及我們的大腦)及可輕易地抵擋超級颶風及劇烈地震的將成為現實。
分享友人