進口隧道 的英文怎麼說

中文拼音 [jìnkǒusuìdào]
進口隧道 英文
access tunnel
  • : 進構詞成分。
  • : Ⅰ名詞1 (人或動物進飲食的器官; 嘴) mouth 2 (容器通外面的地方) mouth; rim 3 (出入通過的地方) ...
  • : Ⅰ名詞1. (隧道; 地道) tunnel; underground pass2. [書面語] (道路) road3. (郊外的地方) suburbsⅡ動詞[書面語] (旋轉) turn
  • : Ⅰ名詞(道路) road; way; route; path 2 (水流通過的途徑) channel; course 3 (方向; 方法; 道理) ...
  • 進口 : 1 (船隻進港) enter port; sail into a port2 (外貿進口) import3 (入口) entrance; [機械工程] i...
  • 隧道 : tunnel; tunneling; tunnelling; chunnel; drive
  1. In this paper, the finite - element numerical analysis calculation is applied to the foundation of high - rise and multi - floor building and the evolvement law of stress and displacement of tunnel used by urban traffic to explore the mutual influence between the wall rock of underground space and high - rise building foundation, taking account of the specific construction situation in the " sanmu garden " project in dadukou district in chongqing, from the perspective of underground space static - force structure stability analysis to open a underground tunnel with 6m in span and 7. 5m in height for track traffic 20m below the surface. this paper, taking considerations of three different states, i. e. the natural state without any artificial interference, the state of high - rise buildings on the surface, and the underground tunnel state with excavation for track traffic, and four plane lines and four vertical lines, analyzes and studies the distributing law of stress and displacement of calculation section from the following aspects : ( 1 ) the main stress vectorgraph, displacement distribution graph ( ux, uy ) and chromatogram graph of stress isoline ( 1, 2, xy ) of section under different states ; ( 2 ) the contrastive distribution curve of stress ( 1, 2, xy ) of different plane and vertical lines under the same state ; ( 3 ) the contrastive distribution curve of stress ( 1, 2, xy ) of the same plane and vertical lines under different states, wishing to provide references for underground space utilization and project designing and construction of the tunnel under high - rise buildings in the future

    本文結合重慶市大渡區「三木花園」開發建設項目,從地下空間靜力結構穩定性分析角度出發,針對在該項目中涉及的高層和多層建築物以及在其地下20米處開挖了一個用於軌交通的跨度6米,高7 . 5米的地下這一具體工程情況,採用2d - 3d -有限元結構分析程序對高層與多層建築物的地基基礎及其與城市軌交通使用的地下圍巖的應力與位移演變規律行了有限元數值分析計算,探索了地下空間圍巖與高層或多層建築物地基基礎之間的相互影響,通過考慮未受到任何人為擾動影響的天然狀態、地表存在多層或高層建築物狀態和地下開挖用於軌交通的地下狀態等三種不同狀態以及4個水平剖線和4個垂直剖線等不同情況,從以下幾個方面具體分析研究了計算斷面的應力與位移分佈規律: ( 1 )在各種不同狀態下計算斷面的主應力矢量圖、位移分布圖( ux 、 uy )以及應力等值線色譜圖( _ 1 、 _ 2 、 _ ( xy ) )等; ( 2 )相同狀態下不同水平與垂直剖線的應力_ 1 、 _ 2和_ ( xy )對比分佈曲線; ( 3 )不同狀態下相同水平或垂直剖線的應力_ 1 、 _ 2和_ ( xy )的對比分佈曲線等,為今後在對地下空間的開發利用以及在高層建築物地下開挖硐室時的工程設計和工程施工提供參考依據。
  2. Both tsing kwai highway and west kowloon highway are essentially on viaducts, until the route finally enters hong kong s first dual 3 - lane immersed tube tunnel, the western harbour crossing, which measures 2 km from the portal on the west kowloon reclamation near yau ma tei to the exit and the end of the new airport access, at sai ying pun on hong kong island

    青葵公路和西九公路均主要為高架路,直至入本港首條雙程三線沉管西區海底。這條過海由位於西九填海區近油麻地的入至設于港島西營盤新機場通終點的出計,全長兩公里。
  3. In this paper, we study the most serious damming section of the east - one main canal, which is from the entrance of the hao wan flume ( chainage12 + 123. 6 ) to the exit of shang tian yuan tunnel ( chainage24 + 091. 1 ). the main content is analyzing the flow characteristic of the canal, setting up mathematical model of the discharge condition of the east - one main canal, according to the survey section and actual roughness factors, building, bend and so on, we divided the canal into more than loocaculation segments. each segment is calculated by microsoft excel electrical table through computer as permanent transition flow of non - prismatic channel

    本論文研究的渠段為陸渾灌區東一乾渠壅水最為嚴重的渠段,從郝灣渡槽(樁號12 + 123 . 6 )至上天院洞出(樁號24 + 091 . 1 ) ,其主要內容是,分析渠水流特徵,建立東一乾渠輸水狀況的數學模型,根據測量斷面及實際糙率、建築物、彎等因素的不同,將渠劃分成120多個計算段,每段按非稜柱體恆定漸變流,運用microsoftexcel電子表格行編程計算。
  4. The tunneling method for the landslide section at the entrance of heishuigou tunnel ( for the internal circle construction road in the construction site of guandi hydropower station ) is presented herein ; in which the tunneling method and the effects of both the pilot and the system supportings on the entrance tunneling into the landslide body are described as well

    摘要介紹了官地水電站場內環線路黑水河溝滑坡體的施工方法,包括開挖的施工方法以及超前與系統支護對在滑坡體上洞所發揮的作用。
  5. The tram passes the swish skyscrapers of queensway, with hong kong park on the right catch a quick glimpse of the old battery and tunnels at street level and the trendy shopping mall, pacific place, before trundling into wan chai district

    當電車經過金鐘區亮麗的高樓大廈時,位於右方的便是香港公園旅客可欣賞古色古香的炮臺和街上已被荒廢的,此外還有緊貼潮流脈搏的太古廣場購物中心,之後電車便會駛灣仔區的街
  6. Article 47 no sand collection, stone query, earth digging or waste dumping, explosive operations and other activities that would threaten the safety of roads, road bridges, road tunnels and road ferries is allowed within the perimeter of 200 meters of large and medium - sized road bridges or ferries and within a perimeter of 100 meters above road tunnels or outside the mouths of road tunnels and within a certain distance on both sides of the roads

    第四十七條在大中型公路橋梁和渡周圍二百米、公路上方和洞外一百米范圍內,以及在公路兩側一定距離內,不得挖砂、採石、取土、傾倒廢棄物,不得行爆破作業及其他危及公路、公路橋梁、公路、公路渡安全的活動。
  7. So he took his son in through the main entrance and through the ticket gate and there they saw this incredible hill and on the hillside is a beautiful face of mickey mouse all in flowers. above that they see the train coming in, and off to the side of the hill are the two tunnels that lead in to disney world. his son was just in awe looking at the hillside and the train, and when his father said, " let s go to disney world, " the son cried because he didn t want to leave and stop looking at the hillside and train

    他帶著兒子從大門去,他來到那裡,經過賣門票的地方,他看著那美麗的山坡地,山坡上是鮮花組成的米奇老鼠的臉,上面來了一列火車,在上面經過有人拿著汽球在賣汽球,還有別的人做著別的事,很遠的地方有兩條,通往迪士尼世界他要帶兒子走,兒子卻敬畏地站在那兒,他目瞪呆地看著米奇老鼠汽球等等
  8. Analysis on landslip ' s structure characteristics of fuxi tunnel ' s entrance

    富溪滑坡構造特徵分析
  9. Nhi mainly provides research and development, design, manufacturing and services of the significant technology equipments of crushing & grinding, ore dressing, metal rolling and dressing shearing, tunnel boring, bulk material transporting and handling, synthetic excavating, construction machinery, transmission machinery, particle board, environmental protection and military and large castings and forgings for metallurgy, mining, coal, power, building material, port, chemical industry, environment industries

    簡介:北方重工主要為冶金、礦山、煤炭、電力、建材、港、化工、工程、環保等行業提供破碎粉磨、礦物洗選、燒結球團、金屬壓延和精整剪切、、散料輸送和裝卸、煤礦綜采、工程機械、傳動機械、人造板、環保、軍工等重大技術裝備及大型鑄鍛件的研發、設計、製造和服務。
  10. Its installation is convenient and easy to renewal. at present, the fireproofing board for tunnels mainly depends on import and mostly expensive, which no doubt increases engineering cost greatly

    現在國內許多使用的防火板都是的,國內尚無生產廠家,而防火板大都價高,這無疑增加了的施工成本。
  11. The relation between the strengthening length of the tunnel anti - seismic and the properties of surround rock of tunnel entrance and the shape of tunnel liner is analyzed

    抗震設防長度與洞段圍巖性質、襯砌斷面形式的關系以及段的加固措施行了研究。
  12. Abstract : this paper summarizes installation and test of mine car rollovermachine rowa at north entrance of qingling tunnel. it briefly describes selection of installation site, foundation construction, mechanical structure, and installion and test of electric and hydraulic system

    文摘:本文通過總結rowa礦車翻轉機在秦嶺的安裝和調試過程,對翻轉機的安裝場地選擇、基礎施工、機械結構件、電氣以及液壓系統的安裝和調試方面,行了簡要的敘述。
  13. The paper introduces the progress and the statue quo of tunnel portal construction, discusses the condition to employ full face method, bench cut method, single side heading method and double sides heading method of portal construction, points out advantages and disadvantages of these methods. the order to adopt these methods of single track, double track and tri - track tunnel in shallow - depth, uneven pressure and incompact ground is also advised after compare

    討論了全斷面法、臺階法、單側壁導坑法和雙側壁導坑法在段施工中的使用條件和優缺點,對這四種施工方法從各個方面行了比選,提出了單線、雙線和三線的洞段處于淺埋、偏壓、鬆散的地層中時各種施工方法選擇的先後順序。
  14. Some key technical problems about construction method, vehicle velocity and clearance of the tunnel scheme were discussed according to the geographical location, engineering geological conditions, request of the harbor entrance and shipping, localization of the tunnel and some principal technical criterions

    根據泰州公路過江通的地理位置、工程地質條件、港航運要求、通工程定位以及工程的主要技術標準等,對泰州公路過江方案的建設方法、行車速度和建築限界等若干關鍵技術問題行了分析論證。
  15. Construction technologies of treatment of mountain collapse at entrance of niutoushan tunnel

    牛頭山山體崩塌處理施工技術
  16. With these boundary conditions, the pressure field and the velocity field is visualized by numerical simulation. now, we can understand the complex flow field at the tunnel entrance from the images. these images are helpful for us to explore the complicated mechanism of the aerodynamic problems and make new aerodynamic model

    通過對這個流場的可視化,使我們對洞附近的復雜流場有一個直觀的了解,得出了高速列車從明線上到,再到內時,附近的壓力場和速度場可視化結果,這有助於我們探索洞復雜流場形成的物理機制,從而為我們一步發現新的空氣動力學問題,建立新的空氣動力學概念和物理模型提供依據。
  17. The paper discusses the employing condition, mechanical principle, reinforce effect, economic guideline and construction requirements of various auxiliary construction methods in surface ground and inside tunnel, then summarizes the design parameters of these methods and illuminates how to choose them

    論文討論了在行地表加固和洞內加固的各種輔助工法,對這些工法的適用條件、力學原理、加固效果、經濟指標和具體施工要求等行了論述,總結出了各種輔助工法的設計參數。
  18. Through tests of different nozzle - equipped emergency ventilation systems, the authors hold that, under the same condition of air volume and air pressure, the round mouth nozzle and its parameters is the best, thus provides reference for the design of emergency ventilation system

    對不同類型噴的通風系統性能行了試驗,提出在相同的風量和風壓下,橢圓噴的通風功能和防災能力最強,噴風速提高有利於提高其風量效率等結論,為事故通風系統提供了設計依據。
分享友人