進水渠首 的英文怎麼說
中文拼音 [jìnshuǐqúshǒu]
進水渠首
英文
intake heading-
As one of the three main parts of the dujiangyan irrigation system, it controls the water that flows into the baopingkou water inlet and discharges flood and sand with its top graphical feature
巧妙利用河道地形的泄洪排沙工程,為控制內江進水量的關鍵所在,是都江堰渠首工程三大主體之一。The dynamic programming model for water conveying and distribution system design is firstly presented in this thesis in the aspect of systematic optimization. taking the minimum earthwork or total cost as objectives, the longitudinal and transverse cross sections of two - stage and more canal system can be optimized to obtain optimal canal slops and relevant parameters, which will satisfy the restraints of water levels without erosion and sediment
在系統優化方面,本文在總結前人的基礎上首次提出了輸配水系統優化設計的動態規劃渠系協調優化模型,以土方量最小或總費用最小為目標函數,對兩級或兩級以上的渠系縱橫斷面進行優化設計,可得到滿足渠道不沖不淤、水位銜接及首末水位約束的最優縱坡及其相應的斷面參數。Through analysis and study, it is believed important and feasible that the implemented projects, the importing feng jia - shan reservoir into yang mao - wan reservoir and the water supply from shi tou river to xi ' an city ; form the synthetic analysis of the main factors - quantity, time, apace and user " character, it can be conferred that it is not necessary for the four projects in the western areas to join together at present ; adding gate at the 2 head of lin jiacun trench can only help to relax the problem of lack of water in bao jixia irrigation area, to solve the problem of short of water in the irrigation area needs to take project measures at the trunk and branches of wei he river from lin jia village to the upper stream ; the mode of supplying water of the four projects in the western areas are all by gravity, they can only be supplied one way and ca n ' t be supplied each other
通過分析研究認為:已實施的引馮濟羊工程和石頭河西安供水工程,是十分必要的和可行的;從水資源配置的主要要素? ?數量、時間、空間和用戶性質的綜合分析研究來看,西部四大工程目前尚無整體聯網的必要;林家村渠首加閘對解決寶雞峽塬上灌區缺水僅能起到緩解作用,從根本上解決塬上灌區的缺水問題,還必須從林家村以上渭河干支流上採取進一步的工程措施;西部四大工程均為重力供水,只能單補,而不能互補。
分享友人