進水管 的英文怎麼說

中文拼音 [jìnshuǐguǎn]
進水管 英文
water inlet
  • : 進構詞成分。
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : Ⅰ名詞1 (管子) pipe; tube 2 (吹奏的樂器) wind musical instrument 3 (形狀似管的電器件) valve;...
  • 水管 : waterpipe; water carrier; aqueduct; water conduit; water pipe; syphon; siphon (消防) 水管車 hos...
  1. At the same time, invite the abroad many well - known expert to compose company ' s decision group of brain truster, introduce advanced management concept and the level of management of overall promotive enterprise in many ways

    同時聘請國外多名專家組成公司決策智囊團,多方引理理念,全面提升企業的平。
  2. Sales : imported and domestic natural rubber, butylbenzene rubber, polybutadience rubber, butyronitrile rubber, epdm rubber, butyl rubber, chlorosulfonated polyethylene tyre types superfine, smell - free, butyl, butyronitrile, color and milk natural rubbers, compound rubbers and reclaimed rubbers ; raw and auxiliary materials for rubber chemical such as rubber accelerator, antiager, black, paraffin, octadecoic acid, zinc oxide, magnesium oxide, titanium pigment, coumarone and powder sulfur ; different specifications of epdm color granules, crossover antiskid rubber floor brick, plastic rubber sites, lawn layout, different specifications of antiskid rubber floor brick, rubber blind - people road brick, plant brick, tree guard brick, top adiabatic brick, road rubber reducer brick, special green rubber tyre rubber granule, rubber powder and product, different rubber and plastic pipe, adhesive tape and plate, flexible rubber soft joint, rubber stop tape, bridge extension device, natural rubber plate pedestal, water - expanding rubber, rubber and plastic air duct, pe / pp / pvc water pipe, fulgurite, flame retardant wire gutter, floor wire gutter, mc nylon product, rubber and plastic machinery and fitting relieve, and processing of different ordinary and special rubber and plastic and nylon products

    經營銷售:口、國產天然膠、丁苯膠、順丁膠、丁腈膠、三元乙丙膠、丁基膠、氯璜化聚乙烯、輪胎類精細、無味、丁基、丁腈、彩色、乳膠類等多種型號天然橡膠、合成橡膠和再生橡膠;硫化促劑、防老劑、炭黑、石蠟、硬脂酸、氧化鋅、氧化鎂、鈦白粉、古馬龍、工業硫磺粉等各種橡膠化工原輔材料;各種規格epdm彩色顆粒,天橋防滑橡膠地磚、塑膠場地、人造草坪鋪裝、各種規格防滑橡膠安全地磚、橡膠盲道磚、植草磚、樹木圍護磚、屋頂隔熱板、道路橡膠減速塊,專用綠色環保型橡膠輪胎膠粒、膠粉及成品,各類橡膠、塑料膠、膠帶、膠板,可撓曲橡膠軟接頭,橡膠止帶,橋梁伸縮裝置,天然膠板式橡膠支座,遇膨脹橡膠,橡膠、塑料導風筒, pe pp pvc、電、阻燃線槽,地板線槽、 mc尼龍產品、橡塑機械及配件調劑,並承接各種普通、特種橡塑、尼龍產品加工製造。
  3. Considering the electrovalence, the curve of water consumption and the reliability of water supply, this paper respectively sets up the model based on the maximal flux and the model based on the expectation flux. it takes yearly expenditure converting value and yearly cistern converting value as target function and takes continuity equation, velocity of flow and compression resistance of cast iron pipeline as restrictions and sets up the pga model on optimal design of water supply networks

    考慮到峰谷電價、用量變化曲線及用可靠性因素的影響,分別建立了以最高時流量設計網的模型和以期望時流量設計網的模型,以年費用折算值加上清池年造價折算值為目標函數,以連續性方程、中流速和鑄鐵耐壓值等為約束條件,行并行遺傳演算法對給網優化設計的實現。
  4. ( 2 ) drainage way of toilet and kitchen of residential building in this chapter, the necessity of reformation of drainage way of toilet and kitchen are presented. drainage way with floor blocked up, drainage with back outlet sanitary facilities and drainage with floor descended are discussed and summarized

    ( 2 )住宅衛生間、廚房排方式提出合理解決衛生間、廚房排方式勢在必行,對墊高衛生間地面敷設排的排方式、後排方式和下沉衛生間樓面敷設排的排方式行探討和總結。
  5. Thirdly, the correlative coefficient is computed between the pressure fluctuation signal of draft tube and the displacement signal of upper guide bearing, the thrust bearing and the head cover, with this the conclusions on the shafts response due to pressure surge in

    並與模型尾壓力脈動試驗結果行對比?結合流動模擬試驗以及動力特性計算結果,全面分析?評定機組的實際運行狀況,劃定運行區域,為電站合理調度
  6. Compound quick air inbreathe - release valve for water supply pipeline

    道復合式高速排氣閥
  7. To comply with monitor and inspection of the quarterly, half yearly, and yearly inspection and remedy of rooftop, roof space, deck, ground, basement, down pipe, sanitary pipe, air vent, cement & concrete, structural, foundation, beams, ironmongery and all related

    對屋頂,地板,地下室,下道,排,排氣口,泥和混凝土,地基等相關的結構設備行每季度,每半年,每年的檢查和修理。
  8. The optimization system of water supply networks is very complicated. it deals with lots of factors from the process of networks " modeling, node demand calculation, initial flow distribution, and the optimal design to the drawing of pipe networks and isopiestic line. the total effect will be better if amelioration is imposed on each part of these processes

    網優化系統是一個比較復雜的系統,從網的建模、節點流量的計算、初始流量的分配、優化計算到網圖形和等壓線的繪制,涉及的因素很多,任何一部分的改與完善都有利於整體優化效果的提高。
  9. After analyzing the merits and shortcomings of the current methods for leak hunting of municipal water supply network and inducing the reasons that cause the pipe leakage, this thesis pointed out that the water supply network should be evaluated synthetically by means of reliability theory

    本文分析了現有給網檢漏方法的優缺點,在歸納了導致道漏損的各種原因的基礎上,指出應該利用可靠度理論對行綜合評價。
  10. In accordance with the characteristics of multi - units and high - lift pump station and the application to the actual project, the main pumping house and the auxiliary pumping house are arranged in combination with the intake pond, and then the understructure is integrated with the main pump house ; with which the working space is fully used with convenient management and investment saving

    摘要結合工程應用,針對多機組、高揚程離心泵站的特點,將主副廠房及池結合布置,下部結構與主廠房形成整體結構,既便於維護理,又節省投資、充分利用空間。
  11. Install a shutoff valve in the cold water inlet line

    在冷進水管處安裝一個關閉閥。
  12. Install a shut - off valve in the cold water inlet line

    在冷進水管處安裝一個關閉閥。
  13. It is particularly recommended for boiler feed lines to prevent backflow when supply pressure falls below system pressure

    特別建議用於鍋爐進水管,以防止當供應壓力低於系統壓力時所產生的迴流。
  14. For the best system performance, install on the fresh water feed line before any pressure regulators ( such as the watts series 1156 on a residential boiler application )

    為了獲得最好的系統性能,在任何壓力調節器(如家用鍋爐電器上應用的美國瓦茨系列1156 )之前,要安裝淡進水管
  15. The improvement of the material for the steam tank and the water distributor was, then, presented

    並對氣泡進水管、布器提出材質改
  16. In this article, the cause of oxygen corrosion occurred at the water inlet in the waste heat boiler without the mea - sure of removing oxygen and the problem of water shock were dis - cussed

    本文對沒有除氧措施的余熱鍋爐氣包進水管發生的氧腐蝕及由此產生的氣包沖擊問題行了探討。
  17. The calculation model of hydro - mechanical transient in existence was deeply studied and the conclusion is that, for kaplan turbine and pelton turbine, neglecting differences of dynamic mater pressure along the turbine spiral case during transient may cause some error in the calculation of pressure rise and speed rise

    本文深入研究分析了軸流式和沖擊式機組過渡過程計算的現有模型,指出現有模型中對蝸殼(進水管)部分的處理方法會給這兩種機組的過渡過程計算帶來相對較大的偏差。
  18. In the base of analysis the water conservancy project ’ s management system history and actuality of our country, this paper point out some problems in the system, such as the property is not clear 、 personal exceed 、 the outlay is not enough 、 the system of insurance is not perfect ; bring forward something that can use reference in our country through introduce the water system of america 、 japan 、 holland ; then put forward the combine of construction and operation of water conservancy project, mainly study in feasibility research stage 、 design stage and building stage ; then, analysis the framework of pure - commonweal 、 quasi - commonweal and management water conservancy and point out the management system of water conservancy projects that suit in the conditions of our country. mainly in develop mixed farming 、 deepen in the system of personal 、 make correlation policy accelerate the reform of the water conservancy project system. at last, the author give some advice

    本文在分析我國利工程理體制歷史和現狀的基礎上,指出我國利工程體制存在的諸如單位性質劃分不準、人員超編、工程理經費不足、社保體制不健全等方面問題;通過分析日本、美國、荷蘭等國的利工程理體制,提出可供我國利工程理體制模式借鑒之處;而提出新建利工程建設理和運行理有機結合的方法,主要從可研階段、設計階段、施工階段行結合;然後按照利可持續發展戰略思想,探討適合我國國情的三類利工程理體制模式,分別分析純公益性、準公益性、經營性三類利工程理體制模式,研究出適合我國國情的利工程理體制模式;從開展多種經營、深化人事制度改革、制定相關政策等方面促進水管單位理體制的改革;在文章的最後,提出筆者的幾點建議和展望。
  19. The intake pipe is going to wash them up right inside the water treatment piant

    進水管道會將他們沖處理廠
  20. One of chongqing ' s largest drinking water suppliers said the water level had fallen below most of the pipes the company uses to draw water from the river

    一家重慶的供公司說,由於長江位持續下降,大部分進水管道已經露出面,無可供了。
分享友人