運土工序 的英文怎麼說

中文拼音 [yùngōng]
運土工序 英文
earth-moving operation
  • : Ⅰ動詞1 (物體位置不斷變化) move; revolve 2 (搬運; 運輸) carry; transport 3 (運用) use; wield...
  • : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
  1. On this foundation the article inducts in detail the method which is based on the relative settlement of calculating unit area end support ( qb ) force at the same time considering the feature of pedestal pile ' s " arch effect " the article introduces conception of pile effective length and finally obtain t he formula of calculating man - made pipe with bulb - shaped axial carrying capacity. the article uses marc program to calculate and analyze foundation soil ' s stress and displacement and gets the change curve chart and the proportion that is shared by king - pipe side soil friction resistance and pipe end counterforce respectively. the article inducts the structure of pedestal in detail on the basis of generalizing pedestal application cases of many countries

    在此基礎上論文詳細歸納了以相對沉降為依據確定單位面積端承力q _ b的計算方法,並考慮擴底樁的「拱效應」特點引入了有效樁長的概念,最後結合公路規范推出了比較實用的人挖孔擴底樁軸向承載力計算公式。論文用了marc程對地基的應力和位移進行了有限元數值計算分析,得到了地基的應力和位移場的變化曲線和在加載過程中樁側摩阻力和樁端反力各自所承擔的比例;本文還在總結各國挖孔擴底樁應用情況的基礎上就擴底樁的構造進行了詳細的歸納。
  2. On the basis of the others, according to the constructional feature of the constitution of the composed soil nails, the computation mode of the he strut frame made of composed soil nails was set up to analyze the distortion of the he strut frame made of composed soil nails when it is stressed. with the engineering data, the strut frame made of composed soil nails is analyzed with the program ababqus, and the effects of the distortion characters, the property of the deposition of the ground, the mechanical property of the soil nails, the variation of the length and the separation of the soil nails, and the diametric of the mixing piles on the strut frame made of composed soil nails, and the distortion property of the strut frame made of composed soil nails under different ground conditions

    在總結前人的研究成果下,針對復合釘墻構造的特點,建立了模擬復合釘墻受力變形的計算模型,並結合程實測資料,用大型通用有限元程ababqus對復合釘墻進行了有限元分析,詳細討論了復合釘支護結構開挖過程中的變形特性、地面沉降性狀、釘受力性狀;釘長度變化、釘間距變化、攪拌樁樁徑變化對復合釘支護結構的影響;復合釘支護結構在不同地基條件下的變形特性。
  3. By emptying the above mentioned theoris and conclusions, this paper introduces detailedly the whole process of the compare and selection of cangzhou city gongrong road canal bridge ' s plan, design calculation and check of structure. the internal force calculation of the bridge adopts the program of plane member system ( bricas ), and it was checked by the program of brcad

    本文最後應用上述理論和結論,以大量篇幅詳細介紹了滄州市光榮路河橋(下承式鋼管混凝系桿拱橋)從方案比選到結構設計和計算、驗算的全部過程,以及施中的要點,本橋內力計算採用平面桿系有限元計算程, (交通部公規院的《橋梁設計綜合計算程》 ( bricas4 . 0 ) ) ,並採用空間有限元程( brcad2 . 0 )進行驗算。
  4. A 3 - d simulative calculation program concerning temperature field and creep stress field and its pre - processing and post - processing has been developed. by applying this program, temperature field and creep stress field of hydraulic culvert and sluice engineer concrete is simulated. 2

    開發了非穩定溫度場和應力模擬計算的三維有限元計算程及有限單元法的前後處理程用此程對水涵閘程混凝進行了溫度場和應力場的計算分析,得出相關結論。
  5. Fabrication of the box beam is divided into such parts as reinforcement, formwork, concreting, prestressing, moving and storing of beam, pipe grouting under pressure, end sealing of the beam, water - proof layer on the bridge surface system, protective coating etc. the paper makes description of effective box beam construction technology and workmanship which can be adopted in other projects, such technologies as : manufacturing and fixing of reinforcement, steel reinforcement fixing baseplate, web plate and top plate respectively and lifting the steel skeleton into form, requirements of design and manufacturing and way of utilization for dismantling - erection type formwork and hydraulic formwork, optimization of concrete ratio, concrete pouring process of two ends of beam in priority over the middle, in sequence of first baseplate followed by web plate and top plate at last, concrete pouring in inclined section and in horizontal layer, concrete vibration mainly by external vibrator in assistance with internal vibrator, methods and regulation for steam curing of concrete, dual controls over stress and strain to ensure quality of prestressing workmanship, construction method of effective beam moving by heavy - weight special moving facility, some regulations and key notes about construction of grouting under pressure, beam ends sealing, water - proof layer on the bridge surface system, protective coating

    箱梁製造由鋼筋程、模板程、混凝程、預應力程、移存梁程、孔道壓漿程、梁體封端程、橋面防水層和保護層程等施環節組成。文中介紹的採用胎具製作和綁扎鋼筋,分底腹板和頂板分別綁扎並吊裝鋼筋骨架入模;拆裝式和液壓式兩種模板的設計、製作要求和使用方法;綜合考慮、優化混凝配合比,混凝灌注從兩端至中間、先底板、后腹板、再頂板的施和斜向分段、腹板水平分層、附著式振搗為主、插入式搗固為輔的施藝,蒸汽養護的方法和規定;應力應變雙控制確保預應力施質量的施技術;採用重物移器有效移梁的施方法;壓漿、封端、橋面防水層和保護層施的一些規定和注意事項等都是對箱梁製造行之有效的施技術和施方法,並可為以後類似施作借鑒。
  6. In this article, according to three - dimension finite element theory and heat conduction theory, the computation program of simulating thermal stress field of rcc arch dam during construction and service is researched and developed

    本文採用三維有限元法和熱傳導理論,研究開發了碾壓混凝拱壩施期和行期溫度應力場全過程的模擬計算程
  7. Lee, hsin - yun ( 2001 ). “ the strategic decision making of consulting organisations. ” the mba programme report of management centre, university of leicester, uk

    李欣,遊憩區專案之開發時決策模式,國立交通大學程學系營建管理組,博士論文, 2006年。
  8. Then on the basis of calculating result from the prefigurative deviation control structure calculation, " rational data forecast processing about error adjust in prefigurative deviation control was made by the prefigurative theory of bp neural network and corresponding program and software matlab6. 1. at last via the data comparison with the practical survey data draw a conclusion : it is feasible for the construction prefigurative deviation control and error adjust used in pc rigid frame bridges to use the calculation model and program brought forward in this paper

    同時,在對預應力混凝剛構橋施過程線形預拱度控制的結構計算分析的基礎上,利用bp神經網路的預測理論和相應的程及軟體包matlab6 . 1對預拱度控制中的誤差調整進行了較好的預測處理,通過與實際施數據及成橋后測量結果作分析比較,得到結論:用本論文的計算模型和程對預應力混凝剛構橋預拱度控制過程進武漢理大學碩士學位論文行結構分析和誤差調整處理是可行。
  9. Researching on the technology if reverse order is to study strains if pits, structural systems if basement, environmental surwey and underpinnings. on account of emphasizing developing methods if checking strength if pick - ets, modemizing machenes of excavation and studying methods of underpinning is put forward and is a way if controlling the quality of pickets in sites, which leads an active effect ; synthetic application if rankintheory, spatial and time effect theory to excavation tl aanalyze the state of soil force and strain is brought forward and the time effect should be considered in the zone of clay, the formation and development of soil plasticity are analyzed and the most dangerous zone to decide how to excavate and where to begin is found ; analyzing the cause of picket settlement during reverse order and the differential settlement and discussing hlw to solute it. duringh the temporary survey and the environmental warship, bringing rorward the theory of environmental vibration and analyzing the state of soil force and probability of losing stabilization of soil under the effect of environmental vibration ; analyzing the state offeree in underground concrete wall by the method of mathematics and pointing out the place of the maximum force and deformation. based on systematic illustrating the reverse order, problems about application and development of reverse order and suggestions also are expressed

    鑒于國內外的研究把重點放在大力發展程樁的實驗室承載力監測方法與設備、如何使方開挖機械現代化及對周圍建築的臨測方法上,本文提出了現場利用聲波層析成像技術監測鋼砼樁內部質量的方法與程,並得出了聲波層析成像技術是砼樁的動態質量檢測的有效手段,這對指導施有積極、現實意義;提出了綜合用朗肯壓力理論、基坑空間和時間效應影響理論來分析逆作法施過程中基坑邊坡體應力及應變的變化情況,指出粘地區也應考慮時間效應,並且進一步分析了基坑邊坡體的塑性區形成和發展,找出邊坡最不利的區域,以確定地下室體的挖掘的方式和順,指出憑主觀臆斷與經驗來施是不可取的;在分析、經較逆作法與大開挖順作法的地下室結構體系受力情況及施的不同,提出了節點處理技術;分析了逆作法施期間樁的沉降變化原因及由此而產生的差異,並探討了解決的方法;本文還提出了環境振動對體邊坡穩定產生影響的觀點,並分析了在環境振動影響下,體的應力狀態及休失穩破壞概率,並且還用彈性力學知識和數學分析的方法定量地分析了地下混凝墻受力狀態,指出了被監測墻體的最大應力、應變位置。
  10. In light of the simulative research results, three methods are applied to analyze some controversial problems in this kind of structural system ( such as the concrete pouring sequence of continuous ends, the applying sequence of pretensioned force, the removal of the temporary supports, the concrete pouring style of continuous ends, the optimization of constructional reinforcement and prestressed reinforcement ). some important conclusions are drawn : the concrete pouring sequence of continuous ends should be in accordance with the principle of " interval end " ; the removal of temporary supports is also on this principle ( opposite to traditional opinions ). at the same time, other problems such as the shrinkage and creep effects of concrete, the c racking and failure pattern, the optimization of reinforced bars and prestressed bars are also analyzed in detail

    在此基礎上,對于目前先簡支后連續結構體系中存在的一些有爭議的問題(如后連續端部澆築和后連續預應力張拉的順、體系轉換中的臨時支座拆除順、后連續端部澆築方式、后連續端部的預應力筋及普通鋼筋的優化等) ,我們分別用三種方法進行了細致的模擬分析、研究,並得出了一些具有重要程意義的結論:后連續端部的澆築順和后連續預應力張拉的「隔跨」原則,臨時支座拆除的「隔跨」原則(此前人們一直認為「對稱澆注和對稱張拉」是最為合理的施) ,混凝的收縮、徐變對先簡支后連續結構體系的影響一般較小等。
  11. Lee, hsin - yun ( 2000 ). “ the case study of 3t company. ” the mba programme report of management centre, university of leicester, uk

    曾仁傑、李欣、陳維福,交通大學總務處營繕組程作業程參考手冊,國立交通大學程學系, 1998年。
  12. Using theory of structure intensity and prestressed concrete bridge, this paper reviews theoretical computing method of stress and deflection. making use of the procedure of computing bridge structure, the structure of simply supported - continuous system is calculated and the result is analyzed, the character on force and deflection is generalized in the paper

    用力學理論、混凝結構強度理論和橋梁結構相關理論論述了橋梁應力與變形的理論計算方法;利用專用橋梁結構計算程結合具體程項目中的簡支轉預應力連續結構進行了數值模擬計算,並對計算結果進行理論分析,提出這種結構型式在受力狀態與結構變形上的特點。
  13. This paper introduces the development and present situation of vibration absorb technology in the world ; generally analysis the rubber - bearing ( rb ) and lrb " s operative mechanism, function and the calculation of parameter ; advance the concept of standardization to lrb ; on the basis of generally analyzing the connected factor such as the site category, the diameter of lead bar, the height of bearing, the designing carrying capacity, the span of bridge, the inherent period and the displacement of rb, determine the parameter, the absorbing vibration target, the method and the process of standardization to lrb ; then according to the two - step rule of resisting and defending earthquake, and combining with the response spectrum theory in the seismic vibration of bridge, make a lot of calculation and analysis of vibration absorb design to the real bridge collected and combined by finite element program ; at last, gives the result of standardization through diagram and explains to its usage

    本論文介紹了國內外減震技術的發展和現狀;綜合分析了普通板式橡膠支座和鉛銷橡膠支座的作機理、性能及參數的計算;提出了鉛銷橡膠支座標準化的概念;在綜合分析場地、鉛銷直徑、支座高度、設計承載力、橋梁跨徑、固有周期以及支座變位等影響因素的基礎上,確定了鉛銷橡膠支座標準化的參數、減震目標、方法和過程;並根據抗震設防兩階段原則,結合橋梁地震振動理論的反應譜法,用有限元程對收集和組合的實橋進行了大量減震設計的計算和分析;最後以圖表的形式給出了鉛銷橡膠支座標準化的結果,並說明了其使用方法。
  14. The indoors tests of compaction, liquid and plastic limit, strength, permeability and compres - sion are done, including cement - improved - soil, lime - improved - soil, lime - fly ash - improved soil. the correctness and rationality of mixing proportion is proved according to the site of qin - shen quick - speed railway. and the construction technics of each improved soil are summarized

    最後結合秦沈客專線的施,驗證了各摻入料配合比的正確性、合理性,歸納總結了各改良的施藝、關鍵、質量保證措施,為今後高速鐵路路基填料的改良積累了一些資料。
  15. The main work done in this paper is as follows : ( 1 ) simulate the temperature field of basement wall by ansys software, sum up the characteristics of the temperature field of basement wall, and analyze the influence of the types of the molding board, environmental change and cement content ; ( 2 ) the whole simulation analysis process of early - age concrete stress field is realized by sub - development of ansys, and cts - ansys software is developed with fortran ; ( 3 ) based on the cause of cracking, the influence of the thickness of the wall, length, bar arrangement, mix proportion, expanding agent, etc, on the wall stress due to concrete creep and temperature change is analyzed

    本文主要進行了以下幾個方面的研究: ( 1 )利用ansys軟體,模擬了施期地下室側墻溫度場,總結了地下室側墻溫度場分佈的特點,分析了模板類型、環境變化和水泥用量等對墻體溫度場的影響; ( 2 )以大型通用有限元軟體ansys為平臺進行二次開發,用visualfortran語言編寫了cts - ansys程,實現了施期混凝徐變溫度應力的模擬計算; ( 3 )從裂縫形成的原因出發,分析了地下室側墻厚度、長度、配筋率、配合比、膨脹劑等因素對墻體徐變溫度應力的影響。
  16. Influence of the temperature field and stress field is ignored but some other factors are considered such as temperature difference between the surface and inside of the concrete, circumstance temperature, work sequence, shaping period, elasticity modulus, the volume etc. and the emulation technology is applied to calculating the construction of the concrete

    用模擬技術對大體積混凝結構進行了不考慮損傷狀態下的溫度場及應力場的模擬計算。計算過程中綜合考慮了混凝結構內部溫度的變化,環境溫度的變化,施,澆築時間以及材料彈性模量的變化,徐變特徵,自身體積等因素,同時指出了模擬計算中存在的問題與不足之處。
  17. It is very efficient in dealing with the data by the fuzzy cluster analysis program which is compiled with fortran77. the author concludes that the theory of fuzzy cluster analysis can be applied to the quality control work of concrete production with the program analyzing the experiment data and the method of fuzzy cluster analysis contributes to the quality control work of rmc production

    利用fortran77語言編寫出了模糊聚類分析的計算機程,實現了分析研究過程的電算化,大大提高了作效率;用該程實現了對試驗室數據的分析研究,得出了模糊聚類分析理論適用於混凝質量控制作的結論;並將該程進一步應用於商品混凝的實際生產中,初步得出了模糊聚類分析方法有助於混凝攪拌站實現對混凝生產的質量控制。
  18. Accounting for the effects of imperfection and large displacement of arch, an approach for the stability analysis of arch bridge is presented , and a program is developed to predict the nonlinear buckling of arch the elastic lateral stability of the jiefang arch bridge in guangzhou during the construction phases and operating periods after its completion is analyzed the results show that the effects of initial deflection and large displacements on the critical load of lateral stability are significant, and that once the initial deflection and large displacement are taken into account, the values of the safety factor are smaller than those obtained by linear buckling analysis

    考慮拱肋初始撓度等缺陷的影響,採用桿系結構大位移分析的有限元方法,建立了拱橋非線性穩定的計算方法,並編制了相應的計算程文中計算了解放大橋鋼管混凝拱橋在施階段及成橋后營期間的彈性側傾穩定結果表明:考慮拱肋初始撓度和結構大位移影響后,拱橋的非線性側傾穩定安全系數比按線性穩定計算值低
  19. There are different types of landscape succession, but in general, there are three ones according to the sequence of time and space : ( l ) original landscape - - > rock - exploring and land - excavating landscape - - > rock and soil filled landscape - - > filled dumping site landscape ; ( 2 ) original landscape - - > rock - dumping and land - excavating landscape - - > occupied dumping site landscape - - > reclaimed landscape ; ( 3 ) original landscape - - > land - occupying landscape - - > industrial square landscape - - > reclaimed landscape

    ( 2 )景觀演變類型可從不同角度劃分為不同類型,但概括起來,景觀演變時空列可分為三種類型:原地貌景觀巖剝離爆破、地挖損景觀巖回填景觀內排場景觀;原地貌景觀巖輸排棄、地壓占景觀外排場景觀復墾景觀;原地貌景觀地面平整、地佔用景觀業廣場景觀復墾景觀。
分享友人