運煤設備 的英文怎麼說

中文拼音 [yùnméishèbèi]
運煤設備 英文
equipment for coal handling
  • : Ⅰ動詞1 (物體位置不斷變化) move; revolve 2 (搬運; 運輸) carry; transport 3 (運用) use; wield...
  • : 名詞(黑色固體礦物) coal
  • : Ⅰ動詞1 (設立; 布置) set up; establish; found 2 (籌劃) work out : 設計陷害 plot a frame up; fr...
  • : Ⅰ動詞1 (具備; 具有) have; be equipped with 2 (準備) prepare; provide with; get ready 3 (防備...
  • 運煤 : coal-conveying
  • 設備 : equipment; device; facility; implementor; apparatus; installation; appointment; furnishing; setou...
  1. The paper uses the methods of determining the nature and quantity. the sea coal quantity is forecasted by the index - smoothness method based the demand of the future coal market and distributed by the proportion of different transportation modes of the coal input areas and the economical principle, evaluate the capacity, the equipment and the facilities of the coal harbors, establish the evaluation model and index, and research the capacity and countermeasure of the coastal coal harbors based the forecast of the coal production and consumption market by the system principle

    本項研究採用定性與定量向結合的方法;炭海量預測以未來炭市場需求預測為依據,按照主要炭調入地區輸方式的分配比例,並根據輸的經濟性和合理性原則,採用指數平滑預測方法進行預測;對港口通過能力和施、的利用情況進行定量評價,並建立相關的評價模型和評價指標。
  2. Coal mine equipment. troughed belt conveyors for loose bulk materials. cleaning scrapers and lateral bibs used for underground and for above ground. specifications. characteristics. test methods. acceptance testing

    .鬆散集料用傳輸槽帶.地面和地下清除鏟機和側閥栓.規范.特性.試驗方法.驗收試驗
  3. Aiming at such problems in combustion system of homemade middle and miniature boiler, as a complex system with the character of dead zone, time variation, serious non - linearity, large time delay, coupling and a lot of disturbance, this paper presents a new set of optimal control resources. by using well - matched control method on system, stable automatic running is realized. having the serious divulgence coals difference a lot from each other in character, instability of chemistry, value of lowest emission of heat, home - made boiler controller is not at all ideal. instead of traditional model that controls the ratio based on proportional control or with the correct signal of the amount of oxygen, this paper, combined with intellect control theory - - fuzzy control and self - optimizing concept, propounded a kind of fuzzy self - optimizing controller to be used in air supplying system of the boiler, and expatiates on the idea of dividing the control process into two parts, dynamic and static to realize, thus meets the demand of homemade boiler economic running

    計針對國產中、小型電站鍋爐燃燒系統參數時變、嚴重非線性、干擾因素復雜、耦合嚴重、模型不易確定的特點,提出多變量協調控制方案,解決了系統可控性差,難以實現穩定自動行的問題;在此基礎上,改變以往以煙氣含氧量控制送風的傳統模式,針對國產電站鍋爐主體及一、二次送風迴路泄露嚴重,種混雜、成分不穩定、燃燒發熱值低、燃燒效率不高等問題,應用智能控制理論中的模糊控制技術,結合自尋最優控制的思想,計了一種模糊自尋優控制器,應用在電站鍋爐送風控制系統上,並闡述了動靜態兩種實現途徑,通過在線優化風配比,實現最佳經濟燃燒,切實保障了鍋爐的經濟行。
  4. Hence, the leather belt carrys the rightful selection of control mode, immediately affect entirely to be beaten the coal measures secure operation together

    皮帶輸機在火力發電廠輸系統中,承擔了全廠來輸、提升、分配等工作,是輸系統的主要
  5. Through the research on the reducer reliability and optimization design, the design quality of the drilling machine are improved greatly. it is proved that the type zk - 150 drilling machine capability is advanced and operation is reliable by examine and industrial test in coal mine. another advanced equipment provided to users has wide application foreground

    通過可靠性優化計,使鉆機的計質量得到很大提高,所研製的zk - 150型鉆機經性能檢測和工業性試驗證明:技術性能先進,機械轉可靠,為礦提供了又一先進,具有廣闊的市場前景。
  6. Scraper chain is suitable for transmission equipment for loose material such as cement, flour, corn, sand, stone and coal etc, of which the loose material is powdery, grain and polt

    埋刮板鏈適用於粉末狀、顆粒狀及小塊狀的水泥、麵粉、穀物、砂石和炭等散狀物料的
  7. Continuous handling equipment and systems - general safety requirements for continuous handling equipment for opencast lignite mining

    連續搬和系統.露天褐采礦用連續搬的一般安全要求
  8. Continuous handling equipment and systems - general safety requirements for continuous handling equipment for opencast lignite mining ; german version en 14658 : 2005

    連續搬和系統.露天褐采礦用連續搬的一
  9. Guide for the procurement of power station equipment - boiler auxiliaries - coal handling and bulk storage plant

    發電站的購置指南.鍋爐附屬.的搬和散貨堆放廠
  10. By using subarea - subsection mining method, multi - channel layout program, heidaigou open - pit coal mine has overcomed the technological continuity problems appearing in bench combination and has fully improved the capacity of existing equipments, so that the transportation distance has been reduced and enormous economic benefits have been gained

    在此過程中,黑岱溝露天礦通過分區分段開采、多通道布置等方案,克服了並段臺階工藝接續過程中出現的問題,最大限度的增加現有生產能力,減少距,創造了巨大的經濟效益。
  11. Type lxg suspension over - rail crane is specially designed for use at coal, mill in power plant, it applies to hoisting the roller spare parts of coal mill and etc, it is also suitable for use of connecting the workshop and various site where it is needed

    Lxg型電動單梁懸掛過軌起重機是為我國大型火力發電廠輸磨系統而計的專用起重,主要用於吊磨輥及其它磨機部件,它還適用於連跨車間以及需要懸掛過軌的各種現場。
  12. Coal mine equipment. troughed belt conveyors for loose bulk materials. carrying idlers. specifications. characteristics. acceptance testing

    .散裝產品槽形傳送帶輸送機載捲筒.規范.特性.驗收檢驗
  13. The problem of coal fired boiler burning residue is common in many power plants. it is also unsolved critical problem for safe, economical and stable operation of power plants. during the last decades, this problem caused countless accidents in domestic power plants, they resulted in equipment damages, personal injuries or death, and even enomorous econoimic lose

    幾十年來,國內燃電廠由於爐內結渣引起的各種、人身事故不計其數,輕則導致鍋爐低負荷行或停爐清渣,產生巨大經濟損失,重則導致損壞,甚至引發人身事故。
  14. The leather belt transport aircraft is living, and the coal measures is beaten together in thermal power plant, undertake quan chang coal transportation, advance, distribute and so on work, is being beaten the coal measures capital equipment together

    的控制系統可分為皮帶輸機(包括篩碎、除鐵、除木、除塵和計量)的控制、卸的控制、場機械的控制和給配系統的控制四個部分。
  15. Guide for procurement of power station equipment - part 4 - 5 : boiler auxiliaries - coal handling and bulk storage plant

    電站的采購指南.第4 - 5部分:鍋爐輔助.料搬和散料存放場
  16. Langfang jihua - trade fuels management company limited was established in 2006, has been two years of coal sales history, major cities headquarters in beijing have large freight yard with a total area of 160, 447 square meters, each package of road freight yard with all the machinery coal unloader missing, the coal and coal transport system, sprinkler irrigation equipment, are equipped with dedicated rail lines

    廊坊冀華通貿燃料經營有限公司成立於2006年,至今已有2年炭銷售歷史,總公司在北京各大城市均有大型貨場,總面積160447平方米,每個貨場均擁有整套行進的機械缺卸、配系統和炭轉、噴灌,均配有鐵路專用線。
  17. Whether it is a question that how big or how heavy, the oversized special project machinery and just - in - time deliveries, for oil, gas, petrochemical, energy, construction industry, mining and metallurgy projects, electronics, environmental equipment and associated industries, or whether the essential large volume raw materials for industry or agriculture use of a country, like energy, gas, coal, grains, woods, forest products, enviromental facilities, or whether the most common consumer goods for ordinary people daily use, for exampe, food, office or family furniture, construction materials, chemicals, mineral metals, health products, sports entertainment, pharmaceutical, telecommunications, textiles products, etc, or the elegant gifts crafts or toys you choose for your lovely children, your family, and your friends

    本著為中國廣大中小企業提供一流的貨代理及各類高附加值的綜合物流服務的理念,讓您與國際接軌,與世界同步。無論您多大多重的大件機械或行業,或是關系國計民生的糧食木材炭等能源物資的輸,還是普通百姓每日離不開的衣食住行等日常生活用品,如食品醫療服裝衣物家庭裝修要用的五金工具建築材料傢具等,或冰箱彩電電腦手機等家用電器,或您為父母孩子親友精心采購的玩具工藝禮品等,大連泛海通達貨代理有限公司為您精心計了多種海公路及鐵路的單項輸服務或綜合立體物流服務解決方案。
  18. The term “ ship ” includes the hull, materials and outfit, stores and provisions for the officers and crew, and, in the case of vessels engaged in a special trade, the ordinary fittings requisite for the trade, and also, in the case of a steamship, the machinery, boilers, and coals and engine stores, if owned by the assured

    第15條「船舶」術語包括船殼、材料和、高級船員和船員的給養,且若船舶受雇於特別輸,包括該特別輸所需的通常要求的裝置,如果是汽船,包括屬于船東所有的機器、鍋爐、及和機艙貯
  19. Based on coal quality engineering analysis, the software of optimization steam coal blending is developed. it is for the least total cost of the current plant

    基於質工程分析優化得到的配,追求的是當前條件下電廠總費用最小,是針對當前狀態和行情況進行的優化。
  20. Renovation and optimization of conveying equipment in coal preparation plant

    的改造與優化