運費計算標準 的英文怎麼說

中文拼音 [yùnsuànbiāozhǔn]
運費計算標準 英文
basis/unit for freight calculation
  • : Ⅰ動詞1 (物體位置不斷變化) move; revolve 2 (搬運; 運輸) carry; transport 3 (運用) use; wield...
  • : Ⅰ名詞1 (費用) fee; expense; expenditure; dues; charge 2 (姓氏) a surname Ⅱ動詞(花費; 耗費) ...
  • : Ⅰ動詞1 (計算) count; compute; calculate; number 2 (設想; 打算) plan; plot Ⅱ名詞1 (測量或計算...
  • : Ⅰ動詞1 (計算數目) calculate; reckon; compute; figure 2 (計算進去) include; count 3 (謀劃;計...
  • : Ⅰ名詞1 [書面語] (樹梢) treetop; the tip of a tree2 (枝節或表面) symptom; outside appearance; ...
  • : Ⅰ名詞1 (標準) standard; guideline; criterion; norm 2 (目標) aim; target Ⅱ動詞1 (依據; 依照)...
  • 運費 : transportation expenses; freight; carriage; fare; freight charges
  • 計算 : 1 (求得未知數) count; compute; calculate; reckon; enumerate 2 (考慮; 籌劃) consideration; pla...
  • 標準 : (衡量事物的準則; 榜樣; 規范) standard; criterion; benchmark; pip; rule; ètalon (衡器); merits
  1. It is proposed that the lrt system will adopt a standard rail gauge, power supply by overhead wires, main low - floor vehicles in six axes, one or two cars in one train set during the initial stage of revenue service, two or three cars in one train set in the later stage, 90m platform length, certificate payment system, type - b right - of - way on at - grade section, and signalling control for priority passing at intersections, etc

    建議採用之輕軌系統為軌距,架空線供電之大部分低底板輕軌車輛,每列車以二輛編組營,月臺設長度為60公尺,以付證明系統收,平面段采b型路權,交叉路口以交通號志管制,給予優先通行權。二線合之建設成本,以89年幣值估,約需新臺幣131億元。
  2. Long term disability pricing and profitability, looking beyond the calculations for better disability risk selection, underwriting and claims considerations for home - based workers, underwriting substandard disability insurance, underwriting income protection benefits, individual long term care as part of the individual disability insurance continuum, effective disability claims underwriting, and case management - transferring the skills to claims management

    ;超越,選擇更好的傷殘風險;針對在家工作者的核保和理賠考慮的因素;次傷殘險的核保;收入保障保險的核保-加與除外條款;個人長期護理保險作為個人殘障保險的延續;有效的傷殘理賠-科隆再保險公司為德國人壽保險公司提供一項獨特的服務;案例管理:將案例管理技巧用到理賠管理上。
  3. With the using of microsoft visual basic 6. 0, a multimedia computer - aided design system of small type pumping irrigation district is developed in this paper. provided with the live multimedia messages as well as a good man - machine conversation mechanism, this system can help the user to finish the planning of an pumping irrigated area such as the layout of canal system, the selection of pump models, the establishment of the irrigation program, the calculating of canals " parameters, the estimate of the project magnitude, the selection of the field constructions, the economic analysis of the project, the output of results, etc, a new oo ( object oriented ) programming method is adopted in this system, various softwares are integrated in this systems as well by the " automation " technic provided by vb, in addition, the multimedia technic is applied to this system for the first time, it makes the system easy to ope rate. as for the optimization of the canals " section, a new optimization method is adopted based on the existing theories about the canals " section, and in this way, with the purpose of minimizing the project ' s investment as well as a stalized canal, limited by the longituding slope, the canals " best feasible parameters can be deduced. furthermore, a integral method to reckon the earth work is developed in this paper, by this way, the estimate precision of the earthwork is enhanced notably. this paper includes the particular illumination for the developing procedure of each systems " segment, and in the end, the directions of the system are demonstrated in a sample area which lies in the zhaija village, taizhou city, jiangsu province, the running results showed that the initial purposes are achieved effectively, and it has a preferable practicability

    在渠道縱橫斷面優化方面,本文在利用已經比較成熟的縱橫斷面優化理論的基礎上,提出以工程總用最小為目函數,以渠道縱坡i為控制變量,以渠道不沖不淤流速及灌區允許地面比降為約束條件,通過縱橫斷面聯動優化的方法得到渠道的最佳工程可行的斷面參數。另外,針對部分地區的取土困難的狀況,本文採用積分法渠道工程土方量,從而大大提高了土方量的估精度,有助於確控制工程投資規模及資金投向。本文詳細闡述了該系統所採用的編程方法、系統構成、系統各組成模塊的開發過程以及灌區規劃所採用的優化方法及原理,最後應用本系統對泰州市翟家村機電灌區進行規劃設行結果證明其操作比較簡便,界面友好,行速度快,規劃成果合理,基本達到了系統預定的要求,具備較強的實用性。
  4. Secondly, the content, evaluating guideline system of the food security cost were discussed, and the quantitative analysis of the food security cost at the view point of center finance expend from reform and opening of china was given. threely, the influnce factors of chinese food security under wto were analyzed thoroughly, and the new stratagem of food security - - big food and little grain ration was proposed, and the food security and its types were discussed. the article thought that ensureing the food security hi the reason cost is the process both food security control was improved and microcosmic foundation was intensified increasingly, that the moderation scale of chinese food security repertory, that the rules, which includes negative correlation alteration of agriculture proportion and modern, etc. must be followed, and that the project of water from south to north must give attention to two or more things water need of food produce ability and output

    認為中國糧食安全與成本優化的過程是一個不斷改進糧食安全調控工作的過程,也是使微觀基礎得以強化的過程;按照社會可承受2的糧食可供波動與控制糧食儲備成本的,中國糧食安全儲備的適度規模為48872千噸;應根據「農業比重與農業現代化的負相關變動」 、 「比較優勢與農業保護的平衡用」 、 「大糧食消與增值的備擇性」 、 「產業結構調整與糧食產能保護的兼容性」等要求建立與實施旨在謀求糧食安全與產業結構調整協調的評價指體系;北方地區對中國糧食生產與增產具有很強的正相關性,然而它正遭受著越來越嚴重的水缺乏的影響;南水北調工程必須兼顧糧食產能的用水需要,以有效緩解糧食需求的相對穩定與糧食產量波動相對較大之間的矛盾,從而達到減少儲備、節約成本的目的。
  5. This paper, firstly, expatiates the content and sense about optimal design of water supply networks, briefly introduces all optimal methods which have been advanced, analyzes these methods and points out their limitation, summarizes the factors which influence the results in optimal design of water supply networks ; secondly, it introduces the principle of genetic algorithms ( ga ). it takes yearly expenditure converting value as target function and sets up the ga model on optimal design of water supply networks based on sga by means of taking some effective measures on selection operator, crossover operator, mutation operator and some parameters setting ; finally, the ga model is verified by its application on engineering project

    本文首先闡述了給水管網優化設的內容和意義,簡要介紹了已有的優化方法,分析比較了各種優化方法並指出其存在的不足,歸納總結了影響給水管網優化設結果的各種因素;接著,介紹了遺傳演法的基本原理,然後在遺傳演法的基礎上,通過對選擇元、交叉元、變異元以及部分參數的設置採取改進措施,並以年用折值為目函數,建立了給水管網優化設的遺傳演法模型;最後,通過工程實例驗證了該模型具有一定的理論和應用價值。
  6. We do not expect that institutions will incur significant compliance costs or resource requirements in adopting the " default " approaches, that is the standardised approach to credit and market risk and the basic indicator approach to operational risk

    我們設定了信貸及市場風險的方法,以及業務作風險的基本指方法,並且預認可機構在落實這兩套方法時不會牽涉大的用或資源配套。
  7. Selects only is presently worth, internal returns ratio, the investment recoupment period, the essential freight rate and the synthesis economic indicator took the weight body form plan the standard, obtains the best body form plan through the analysis computation

    選用凈現值、內部收益率、投資回收期、必要率和綜合經濟指作為衡量船型方案的,通過分析得出最佳的船型方案。
  8. This paper, firstly, expatiates the content and sense about optimal design of water supply networks, briefly introduces all optimal methods which have been advanced, analyzes these methods and points out their limitation, summarizes the factors which influence the results in optimal design of water supply networks ; secondly, it introduces the principle of genetic algorithms. it takes yearly expenditure converting value as target function and sets up the genetic algorithms model on optimal design of water supply networks based on simple genetic algorithms by means of taking some effective measures on selection oper ator, crossover operator, mutation operator and some parameters setting ; finally, the genetic algorithms model is verified by its application on engineering project

    簡要介紹了已有的優化方法,分析比較了各種優化方法並指出其存在的不足,歸納總結了影響給水管網優化設結果的各種因素;接著,介紹了遺傳演法的基本原理,然後在遺傳演法的基礎上,通過對選擇元、交叉元、變異元以及部分參數的設置採取改進措施,並以年用折值為目函數,建立了給水管網優化設的遺傳演法模型;最後,通過工程實例驗證了該模型具有一定的理論和應用價值。
  9. In this dissertation, based on the maintenance mode of cosco container lines, the author retrospect the development of technical manage, analyzes the management mode, maintenance system and cost control system of coscon by comparing with the latest development in the world, and absorbing its experience. the author argues the following steps to optimize the technical management of coscon fleet : project the management base center ; introduce the index of standard and performance ; detail the cost estimation ; evaluate the performance of major equipment ; adopt the computer system and strategic outlook

    在此基礎上,作者從以下幾個角度對中遠集船舶機務管理模式進行了優化: 1 、架構出以岸基為中心的中遠集船隊機務管理新模型; 2 、創立了設備管理和設備工況指數; 3 、細化了設備維護用的測方法; 4 、提出了設備維護重要工程的效能評估方案; 5 、提出了船舶維修保養體系改進思路; 6 、強調了船岸通信系統建設和機應用; 7 、進行了機務管理問題的戰略思考。
分享友人