過程管理 的英文怎麼說
中文拼音 [guòchéngguǎnlǐ]
過程管理
英文
process management- 過 : 過Ⅰ動詞[口語] (超越) go beyond the limit; undue; excessiveⅡ名詞(姓氏) a surname
- 程 : 名詞1 (規章; 法式) rule; regulation 2 (進度; 程序) order; procedure 3 (路途; 一段路) journe...
- 管 : Ⅰ名詞1 (管子) pipe; tube 2 (吹奏的樂器) wind musical instrument 3 (形狀似管的電器件) valve;...
- 理 : Ⅰ名詞1 (物質組織的條紋) texture; grain (in wood skin etc ) 2 (道理;事理) reason; logic; tru...
- 過程 : process; procedure; transversion; plication; course
- 管理 : manage; run; administer; supervise; rule; administration; management; regulation
-
This paper takes mobile engineering department equipment management of daqing petrochemical parent company as an example, and studies the design and application of equipment management system of daqing petrochemical parent company, for the implement of computerizing the equipment entire process management with the equipment management system and completing the synthesis management, the records management, the expense management, the fixed asset management, the specialized management and the information management with the computer system and making in the manual management some qualitative and stochastic ingredients transforming into the quantitative standard management. so it guarantees that we can perform advanced predicting management in the entire process of the matter movement and the value movement of equipment and complete the equipment servicing transition from the compulsory servicing and afterwards servicing to the preventive servicing, improving work quality, efficiency and modernized degree which the equipment manages and assisting enterprise ’ s equipment management decision - making and the whole realization of management goal and enhancing the enterprise ’ s interior equipment utilization and realizing its maximum profit
本文以大慶石化總廠機動工程部的設備管理為例,對大慶石化總廠設備管理系統的設計與應用進行研究,旨在通過設備管理系統實現設備全過程管理計算機化,由計算機系統來完成設備的綜合管理、檔案管理、費用管理、固定資產管理、專業管理及信息管理,使人工管理中一些定性的、隨機的成分轉變為定量的規范的管理,保證大慶石化總廠對設備的物質運動和價值運動的全過程實行先進的可預知性管理,並逐漸將設備維修從目前的以強制性維修及事後維修為主過渡到以預防性維修為主,提高設備管理的工作質量、效率和現代化程度,輔助企業的設備管理工作決策及經營管理目標的整體實現,提高大慶石化總廠內部設備的利用率及實現其最大的經濟效益。Abstract : under the base of investigation and research on natural radioactive nuclein in coal of yili area, combining with the distributing characteristic and law of radioactive nuclein in coal of area and residents ' customer of using coal in yili area, the article raises decrement, resources, harmless and prevention and control measure of whole course managing rule with having a definite object in view and put foward a feasible plan and way for economie developmant of yili area, resonable development and utilization of coal resources, preventing from pollution because of mining and utilizing coal and further protecting people ' s health
文摘:在對伊犁地區煤中天然放射性核素調查研究的基礎上,結合伊犁地區煤中放射性核素分佈的特點、規律以及伊犁地區居民的用煤習慣,有的放矢的提出了減量化、資源化、無害化以及全過程管理原則的防治措施,為伊犁地區的經濟發展,煤炭資源的合理開發和利用,防止因煤炭的開采利用而造成的污染,建設性的提出了切實可行的方案和途徑。Then, idef3 and object - oriented petri net ( opn ) model for product development process is constructed respectively. the whole process is realized on smarteam platform
採用由idef3到opn網建立產品開發流程模型,在smarteam平臺上實現了產品設計過程管理。Research on the management of disruptive technology innovation process
突破性技術創新過程管理研究With the further research and application of project management ( pm ) technology, extending function of pm in product data management system has become an important part of enterprise information in manufacturing industry during the process of product development
隨著項目管理技術在製造企業中應用的不斷深入,在產品數據管理系統中擴展項目管理功能已經成為製造企業產品開發過程管理和企業信息化的重要組成部分。To aim at the difficulties in project process management that domestic software enterprise encountered and consider special requirements in software development project process management, this paper is intended to develop a practical and operative software project milestone management framework according to cmm guide, which can improve software development project management process capability effectively
本文針對國內軟體企業在項目過程管理方面存在的問題以及大中型軟體開發項目過程管理的特點和要求,根據cmm定義的軟體過程改進體系和指南,設計了軟體項目的里程碑管理框架,旨在對傳統的軟體開發項目過程管理模式進行改造。Then, the paper proposes process management of software development methods based on hierarchy model. it hierarchies process concept and classifies complex factors to different abstract layers : organization layer, work flow layer and material layer. according to different features, corresponding measures are applied to control and improve the software development process effectively
並在統一過程的基礎上提出了基於層級模型的軟體開發過程管理方法,將軟體開發中的「過程」的概念層級化,將原來眾多復雜的因素劃分到不同的抽象層次:組織結構層、過程流層和物件流層。Cniec is engaged in project consultancy, project design, project labor security and hygiene pre - evaluation, project inspect and control, project survey, turn - key service, project management, petrologic engineeringconstruction, mechanical and electrical integration equipment development and manufacture, international trade and foreign economic and technological cooperation in such areas as mechanical, architecture, pharmaceutical and chemical, textile, civil architecture, military industry, power, electronic, building materials, and control over environmental pollution
我公司主要在環境污染治理專項工程工業爐窯工程國外自備電站和輸變電工程機電設備產品的進出口貿易和施工監理方面為客戶提供從設計采購建造一體化的交鑰匙工程,同時可從事工程項目監理及代表業主從事工程建設項目的全過程管理。Medical talents ' training quality, therefore, should be constantly improved by controlling its enrollment scale, increasing input, improving school running conditions, strictly carrying out its quality standard and strengthening the teaching process administration, so that medical education will really become elite education
為此,要通過控制招生規模,增加投入,改善辦學條件,嚴格執行質量標準,加強教學過程管理,不斷提高醫學人才培養質量,使醫學教育真正成為精英教育。Management professionals who lead improvement of operation, business process and quality, or are in charge of r & d, manufacture and service process. ideally be with university education and computer knowledge
負責企業內部運營管理,業務流程管理,質量管理,產品和技術研發管理,生產過程管理以及服務流程管理的中層管理者和相關負責人。學員應該具備一定的數理基礎知識和電腦操作知識。To implement whole course process management, safety unit management, safety control, etc, in the safety management of expansion project of huanglongtan power plant was no accident in safety record of safety management for the expansion project was achieved. quality raised
摘要黃龍灘電廠擴建工程安全管理上提出了安全工作實行全程「過程管理」 、 「安全單元」管理、 「安全質量」控制等,實現了擴建工程安全管理無事故的安全記錄。According to the experience of electromechanical equipment management of dayuandu navigation - power junction on xiangjiang river of hunan province, this paper probes into the significance and methods of whole - process management of hydropower & navigation and power generation junctions from design, manufacture and installation to operation and maintenance
摘要基於湖南省湘江大源渡航電樞紐機電設備管理的經驗,探討水電、航電樞紐工程設備從設計、製造、安裝到運行、維護實施全過程管理的意義及方法。This thesis comes from the “ fixture speedy design and management ” subsystem, which is belong to the “ productive and technical preparation and process management ” subject of the 2nd institute of china aerospace science and industry corporation
本課題來源於航天科技集團二院的「生產技術準備與過程管理」課題的「工裝快速設計與管理」子系統。The control of the engineering costs in college capital construction projects depends largely on the control and supervision of such factors as decision - making, bidding at design stage, supervising at construction stage and settlement after the construction completion
摘要高校基建工程式控制製造價,要做好決策、設計階段工程招投標、施工過程管理、工程竣工結算等幾個重要環節的控制和管理。With the rapid process of globalization and integration of the world economy, and china ' s entry to wto, the management of construction claim of bringing in foreign capital and foreign projects are required to comply with the international practice, so does the china ' s construction industry on the way of marching to the international construction market. in view of the fact that in most of the domestic construction enterprises, they are of weak consciousness of claim and both sides of contractor and contract are not so clear to the legal procedure and treatment of claim. they are not standard or systematic enough
論文針對大多數國內建築企業存在索賠意識薄弱,承發包雙方對實施索賠的方法、程序及問題處理都不甚了解或不夠科學規范,系統性差等的不足,通過結合建築企業在已按gb t19001 - 2000idtiso9001 : 2000 、 gb t24001 - 1996idtiso14001 : 1996 、 gb t28001 - 2001三個標準(或其中之一)建立運行企業管理體系的基礎上,運用過程方法,以建築工程(建築產品)實現過程為管理目標,對施工索賠問題的識別進行了系統分析,建立了索賠管理控制點,提出了各過程管理控制點相應的對策措施。The main reason that causes a lot of projects of the software enterprises repeat failed is the following : first, lack the effective software process management system, rely on the software designers and developers too much ; second, not mostly set up perfect quality security system, ignore the important function of software testing
許多軟體企業項目屢遭失敗的主要原因,一是缺乏有效的軟體過程管理體系,過多地依賴軟體設計與開發者的個人素質;二是大多沒有建立起完善的質量保障體系,忽視軟體測試的重要作用。Through the study of shenzhen blue coach real estate project, this thesis put forward the concept of " whole stage project management " which refers to the management from the market survey, demands analysis to operation and investment payback stage
本文通過對深圳蔚藍海岸房產項目的研究,提出了「全程項目管理」的概念,即從前期的需求研究和市場開發到後期的營運收回投資的全過程管理。Concurrent product design process management based on dsm
的并行產品設計過程管理It puts the all engineer process and management process into a unified process. it not only defines all the process clearly, but also calls for measuring, controlling, and mending the process
在改進了的生命周期法中,把每個階段包括的過程進行了明確定義(包括原方法中固有的和根據過程管理要求新增的) ,確立了過程之間的邏輯關聯。Austin, texas , january 17, 2006 ? emerson process management is offering 19 new online training courses on various aspects of wireless for process automation
奧斯汀1月17日消息? ?艾默生過程管理正在提供19門涉及過程自動化各方面的在線培訓新課程。分享友人