過重有效荷載 的英文怎麼說

中文拼音 [guòzhòngyǒuxiàozǎi]
過重有效荷載 英文
overweight payload
  • : 過Ⅰ動詞[口語] (超越) go beyond the limit; undue; excessiveⅡ名詞(姓氏) a surname
  • : 重Ⅰ名詞(重量; 分量) weight Ⅱ動詞(重視) lay [place put] stress on; place value upon; attach im...
  • : 有副詞[書面語] (表示整數之外再加零數): 30 有 5 thirty-five; 10 有 5年 fifteen years
  • : Ⅰ名詞(效果; 功用) effect; efficiency; result Ⅱ動詞1 (仿效) imitate; follow the example of 2 ...
  • : 荷名詞(蓮) lotus
  • : 載Ⅰ名詞(年) year : 一年半載 six to twelve months; six months to a year; 三年五載 three to five ...
  • 過重 : excess weight; excessive weight; overcharge; overweight
  • 有效 : effective; valid; efficacious
  1. This paper, in the light of the special geological environment and actual project situation of the three gorges reservoir area, puts forward a comprehensive analysis and evaluation system suitable for the stability analysis of the bank landslide of the three gorges reservoir area under the premise of thorough consideration of the water influence on the stability of the bank landslide, and obtains the following achievements in several aspects that have the practical application significance and certain scientific research value : ( 1 ) it is discovered that the water activity is the primary factor of the formation of the new landslide and the revival of the ancient landslide. on the one hand, the rising underwater level reduces the actual stress of landslide ; on the other hand, the long time soaking of the underwater reduces the mechanics intensity of the landslide and the slide belt, both of which reduce directly the landslide stability ; ( 2 ) in view of the special condition of the three gorges reservoir area, this paper analyzes systematically the forces acted on the landslide of the three gorges reservoir area and the force varieties acted on the divided landslide when the water level changes between 175 meters and 145 meters. thus it is more scientific and comprehensive for the analysis of the forces acted on the landslide ; ( 3 ) this paper summaries systematically 10 kinds of typical computation projects by organic combinations of different kinds of situations in the dry season ( nature statue ), rainy season ( rainstorm or rains for a long time condition ), with 175m water level in the reservoir, during the earthquake, with the water level of the reservoir adjusted from 175m to 145m and so on, and produces

    本文針對長江三峽庫區特殊的地質環境與工程實際情況,在充分考慮水對庫岸滑體穩定性影響的前提下,提出了一個適用於長江三峽庫岸滑坡體穩定性分析的綜合分析評價體系,並取得了如下幾個方面具工程實際意義和一定科學研究價值的研究成果: ( 1 )研究結果發現,水的活動是新滑坡形成或古滑坡復活的主要因素,一方面是由於地下水位升高降低了滑坡體的應力,另一方面是由於地下水的長期浸泡降低滑體及滑帶的力學強度,這兩方面的因素均將直接降低滑坡的穩定性; ( 2 )針對三峽庫區的特殊條件,系統分析了作用於三峽庫區滑坡體上的力系和庫水位在175m與145m間變化時滑體條塊的受力變化,從而使對作用於滑坡體上的力系分析更科學、更全面; ( 3 )通對滑體處于旱季(天然狀態) 、雨季(暴雨或長期降雨狀態) 、 175m庫水位、地震以及庫水位由175m調節下降至145m等各種不同情況的機組合,本文系統地歸納總結出了10種典型計算工況,並具體給出了相應的作用的計算方法,使在庫區岸坡滑體穩定性分析評價時對計算工況選擇及其作用的計算更具規范性; ( 4 )具體運用c + + builder開發了關于滑坡體穩定性綜合分析評價系統,使對滑坡體穩定性分析計算更方便、更準確; ( 5 )將上述滑坡體穩定性綜合分析評價系統應用於慶市豐都縣名山滑坡穩定性分析的具體事例中,分析結果表明,本文所提出滑坡體穩定性綜合分析評價方法對三峽庫區的滑坡穩定性分析是實用可行的。
  2. Based on the research of several shiplocks, the temperature and stress field of the lock floor is simulated under temperature and gravity loads, where the shiplock floor is built on different foundations, the effect of setting up wide construction joints is analyzed by the nonlinear finite element method

    作者通對多個船閘工程的研究,結合非線性限元模擬分析方法,考慮力、溫度等,計算分析土基和巖基上船閘結構底板預留寬縫施工方法的果。
  3. On the basis of the study of traffic features of heavy - load vehicles, the vehicle weight data and the axle - load spectrum of different vehicles were collected for some typical heavy - duty roads in china, and according to the features of heavy - loading pavement, deficiency of the former load - figure are analyzed and new figures which are suitable for heavy - load pavements are put forward. meanwhile, based on the research of the cement concrete fatigue equation and the damage mechanism of asphalt pavement under heavy - load vehicles, axle load conversion equations fitting for heavy - load cement concrete pavement and asphalt pavement are established respectively by further analysis. in addition, design indices, traffic and material parameters and structural combination for heavy - load pavements are discussed in this paper as well

    本課題針對道路路面設計中所存在的問題,從交通特性出發,收集分析了國內幾條道路的交通及軸組成情況,根據交通的特點,分析原圖式的不足,提出了適合於瀝青、水泥混凝土路面的圖式;同時,在水泥混凝土路面疲勞方程及瀝青路面破壞機理研究的基礎上,通路面軸換算公式的進一步研究,分別提出了適合於水泥及瀝青路面的軸換算公式;此外,本文還對水泥、瀝青路面的設計指標、交通參數、材料參數及結構組合等方面進行探討,系統地提出了路面的設計方法,並使之地運用到工程實踐中。
  4. Finally, two examples show that, the availability and practicability of the new model is verified. the analysis of calculation result of berthiervill test embackment shows different part of compression curve have different influence upon the course of consolidation, and correct coefficient and viscous effect have great significance on deformation forecast. associated with the wenzhou airport runway engineering, the reason of increasing of pore - water pressuer in under - lying soft layer and post - construction settlement are given

    最後,通兩個工程實例的分析來說明本文模型的性和實用性:一是對berthiervill填土試驗場的軟基實測數據和理論成果進行對比分析,闡明考慮結構性擾動和粘滯性應對分析天然粘土固結壓縮性的要性;二是對溫州機場袋裝砂井超預壓工程進行數值模擬,指出停預壓期間下臥層孔壓增加和工后沉降大的原因。
  5. Through the bonding tests and the theory analysis between the advanced composite glass sheets and the concrete under the general load - carrying condition, the iterative load - carrying condition, the freeze - thaw action, and the defective bonding, the calculative model has been established, and the numerical value of fibre sheet strain under different load - carrying has been confirmed. the bond strength calculative expressions for the concrete bonded with glass fibre sheet under the pull - shear and the bend load - carrying conditions have been established. the author put forward the decreasing coefficient and the calculative expressions for the influence of reinforce effect by the non - effective area and the calculative expressions for the influence of the freeze - thaw action on the carrying capacity of the concrete beams

    本文採用美國泰扶高強復合玻璃纖維布以及與之性能相當、由南京玻璃纖維研究院自行研製開發的egfw430型玻璃纖維布兩種材料,通在靜、凍融及缺陷粘結條件下的高強玻璃纖維布與混凝土粘結性能的試驗研究與理論分析,建立了玻璃纖維布-混凝土的粘結計算模型,明確了不同受力狀態下纖維布應變的設計取值,提出了玻璃纖維布-混凝土抗剪粘結強度的計算公式;確定了考慮非粘貼面積對加固果影響的折減系數;給出了凍融循環次數引起承力下降的插值計算方法;並驗證了作用下玻璃纖維布與混凝土良好的粘結性能。
  6. In industry, about over 80 % damages of the oscillatory components under dynamic loads are caused by the fatigue failure, but with traditional ndt methods, the damages ca n ' t be tested and evaluated before the fatigue crack coming into being, which result in serious accident in the long period running of these equipments

    工業生產中,約80 %以上受動作用的振動構件破壞是由疲勞失引發的,而傳統的無損檢測技術無法解決疲勞裂紋形成前損傷的檢測和評價問題,造成設備在長周期運行程中發生嚴事故。
  7. Analytical solution was obtained for one - dimensional large - strain and non - linear consolidation of single - layered soil under time - dependent loading on the basis of some simplifications. meanwhile, semi - analytical method was proposed for solving more complicated consolidation problem and corresponding computer code was developed for one - dimensional large - strain consolidation analyses, in which, complicated factors such as selfweight, non - linear and rheological properties of soft soils can be all taken into consideration. the correctness of the method and that of the code were verificated through comparing the results with those obtained from available analytical solutions

    然後根據離散和解析相結合的原則,利用已的成層地基一維線彈性固結解析解,建立了能求解復雜一維固結問題的半解析方法,編制了相應的能綜合考慮土的非線性、流變、成層性、自以及變等復雜因素的軟粘土一維大應變固結計算程序,並通與已各種解析解的比較對半解析法及其程序的正確性和性進行了驗證。
  8. Through the theoretical calculation and parameter analysis and compared the result with general composite beam, the results show that the section stress redistributed by the effects of concrete shrinkage and creep and tensile stress by difference temperature will be greatly reduced. the forcing characteristic of this

    理論計算和限元參數分析,與常規組合結構進行對比,驗證了預應力波形腹板組合結構具大大減小徐變引起的應力分佈及溫差和收縮應在混凝土板產生的拉應力值、對加齡期和持齡期不敏感的特點,結構受力性能非常優越。
  9. Under the horizontal earthquake action and wind force, aim at " the pure frame structure with rectangle columns ", " the pure frame structure with special - shaped columns ", " the frame - truss structure with special - shaped columns " and " frame - shear wall structure with special - shaped columns ", earthquake action analysis was done by the spacial finite element method through the changes structural parameter. analyzing systematically " structure vibration mode ", " vibration period ", " structure lateral rigidity ", " seismic action force ", " seismic response force ", " floor seismic shear force ", " lateral horizontal displacement of structure " and " members internal force ". results indicate : ( 1 ) based on equal area, the special - shaped columns replaced the rectangle columns, the structural lateral rigidity enlarges, the lateral displacement minishes obviously, the earthquake response increase slightly, the biggest increasing amount of frame columns axis - compress ratio is smaller than 0. 08. the whole aseismic performance of structure has improved ; ( 2 ) when the section ' s length and section ' s thickness ratio of special - shaped columns is smaller than 3. 6, the structure benefits to resist seismic action ; ( 3 ) the angle of horizontal seismic action with the whole coordinate is 0 degree, structure earthquake response is bigger, belonging to a control factor of structure aseismic design ; ( 4 ) the frame - truss structure with special - shaped columns and the " a " - brace has the biggest lateral rigidity ; ( 5 ) the frame - shear wall structure with special - shaped columns have bigger lateral rigidity and smaller displacement, members internal force enlarged just rightly, have much superiority of resisting seismic action ; ( 6 ) in the higher seismic fortification criterion region ( 8 degree of seismic fortification intensity ), aseismic disadvantageous building site ( iii type site ), adopting special - shaped columns structure system, should reduce possibly the building ' s self - weight in order to reduce the earthquake response ; ( 7 ) the response spectrum method of computing seismic response and the time - history analysis method have similar analysis result

    西安理工大學碩士學位論文在水平地震作用下,並考慮風組合,分別對「矩形柱純框架結構」 、 「異型柱純框架結構」 、 「異型柱框一析架結構」及「異型柱框-剪結構」等四種結構體系,通改變結構參數,運用空間限元方法,進行地震作用計算。系統地分析研究「結構振型」 、 「振動周期」 、 「結構側向剛度」 、 「結構地震反應力」 、 「樓層地震剪力」 、 「結構側向位移」 、 「層間位移角」 ,以及「構件內力」 。結果表明:在等面積原則下,異型柱代換矩形柱后,結構剛度增大,側向位移明顯減小,地震反應力略增加,框架柱軸壓比最大增幅小於8 % ,結構整體抗震性能所提高;當異型柱肢長肢厚比小於等於3 . 6時,結構利於抗震;水平地震作用力與整體坐標夾角為0度時,結構地震作用應較大,屬結構設計的控制因素之一;異型柱框一析架結構採用「人」字斜撐,側向剛度大於「八」字斜撐和「人一八」字混合斜撐;異型柱框一剪結構側向剛度大、位移小,構件內力增大適中,是一種抗震性能優越的結構體系:在抗震設防烈度較高地區( 8度)和抗震不利的建築場地( m類場地) ,採用異型柱結構體系時,應盡可能減輕結構自,降低地震作用力;分別採用「振型分解反應譜」法和「時程分析」法進行地震作用計算,兩種方法所得結果基本一致。
  10. Main content of " hef ( high efficient firewall ) firewall realize mode study " have : ( 1 ) emulation experiment and ipv6 / tunnelbroker model set up through transproxy, explain transproxy method, improved structure of rfc3053 emphatically, act for technology about solution of efficiency, make their suitable for different need of isp of scale ; ( 2 ) on the basis of analysing ipsec agreement security question, to isakmpsa varying load attacks and improves in consulting, carry on form analyses, proved, design vpn high - efficient safe model based on ip / ipsec concept finally ; ( 3 ) on the basis of ids dynamic characteristic of system, for remedy firewall static deficiency of defence, design one method that the two combine, offer a good foundation for high - efficient online security system ; ( 4 ) through theory design and emulation experiment, the above - mentioned three part can make and imbed fire wall of the system for module, offer certain theoretical foundation to domestic fire wall design of product

    《 hef ( highefficientfirewall )防火墻實現模式研究》的主要內容: ( 1 )通transproxy模擬實驗及ipv6 / tunnelbroker模型建立,著闡述transproxy方法、改進的rfc3053的結構,以及代理技術中率的解決方案,使之適用於不同規模的isp的需要; ( 2 )在分析ipsec協議安全性問題基礎上,針對isakmpsa協商中的變換攻擊做出改進,並進行形式化分析、論證,最終設計出基於ip / ipsec概念的vpn高安全模型: ( 3 )基於ids系統的動態特性,為彌補防火墻靜態防禦的不足,設計出兩者聯動的方法,探索了高網路安全體系模式研究的新方向; ( 4 ) hef防火墻實現模式的理論研究及模擬實驗,所得三部分研究結論均可設計出module ,內嵌入防火墻系統中,為國內防火墻產品的設計提供了一定的理論基礎。
  11. Adopting the deformation harmony theory, the numeric calculation of the curve of load versus settlement is made. the fitting results between the calculated curve of load - settlement and the measured one of piles with different construction process are illustrated. hence, under the condition of few or no static load test data, the performance of bearing capacity of single bored pile in loess may be predicted utilizing indexes of shear wave velocity, static cone penetration test and modification coefficient of depth, so it is remarkable to reduce the blindness of preliminary design of pile

    室內試驗及原位測試指標進行理論計算與現場實測值的對比,筆者引入了施工工藝修正系數k _ ( c1 )和k _ ( c2 )及深度修正系數,使理論計算值與現場實測值具良好的一致性,進而通變形協調理論對?沉降曲線進行數值計算,並用不同施工工藝的實例說明了理論計算?沉降曲線與實測?沉降曲線的擬合果,從而達到可在不做靜試驗或少做靜試驗的情況下通剪切波速和靜力觸探試驗指標以及施工工藝修正系數等預測黃土地基中鉆孔灌注樁承性狀,這對于工程初步設計中減少設計的盲目性具十分要的現實意義。
  12. In view of the technical problems of softening of foundation soil and reduction of bearing capacity of the breakwater under the action of repeated wave loads during the execution of the second phase of the deepwater waterway regulation project in the changjiang estuary, tianjin port construction corporation has successfully developed safer, higher quality and highly efficient technology and special - purpose marine craft and machinery for laying deepwater sand blankets and offshore installation of prefabricated drains, which were more suitable for the working conditions in the changjiang estuary, and has also explored the construction technology for prefabrication of caissons with rubber anti - sliding plates, to ensure the efficient implementation of the engineering measures against softening of foundation soil

    摘要針對長江口深水航道治理二期工程施工程中遇到的堤身在波浪作用下地基土出現軟化、承力降低的技術難題,第一航務工程局成功開發了適合長江口工況的安全、優質、高的深水砂被鋪設和海上塑料排水板打設施工工藝及專用船機設備,探索了一整套帶橡膠阻滑板的沉箱預制施工工藝,確保了抗軟化工程措施的實施。
  13. Which often produces some unexpected problems, such as prolonging time limit of project, increasing engineering quantities and cost, etc. through test on the site, dynamic value analysis, finite element unit method, the paper researchs construction technology of in - situ pile, transfer theory, thickness of supporting layer of head slab and depth of pile in karst area, provides some important conclusions, directs effectively the design and construction of this kind of projects

    但因溶洞的分佈規律性差,現勘探手段難於事先查明它的準確位置及大小,因而常常給施工帶來意想不到的問題:工期延長、工程量增加及工程費用增加等。本文通現場試驗、理論計算和限單元分析,對巖溶地區鉆孔灌注樁的施工工藝、傳遞機理、持力層頂板厚度及嵌巖深度等方面進行了較為系統的研究,得出了一些要結論,地指導了該類工程的設計和施工。
分享友人