道路排水系統 的英文怎麼說

中文拼音 [dàobèishuǐtǒng]
道路排水系統 英文
road drainage system
  • : Ⅰ名詞(道路) road; way; route; path 2 (水流通過的途徑) channel; course 3 (方向; 方法; 道理) ...
  • : 1 (道路) road; way; path 2 (路程) journey; distance 3 (途徑; 門路) way; means 4 (條理) se...
  • : 排構詞成分。
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : 系動詞(打結; 扣) tie; fasten; do up; button up
  • : Ⅰ名詞1 (事物間連續的關系) interconnected system 2 (衣服等的筒狀部分) any tube shaped part of ...
  • 道路 : road; way; path
  • 排水 : drain off water; drain away water; dewatering
  • 系統 : 1. (按一定關系組成的同類事物) system 2. (有條理的;有系統的) systematic
  1. After acquiring the land for the hsinchu station, the following public construction projects will be conducted : transportation system such as road engineering, sidewalk and accommodation road, land preparation, sewerage system, foul sewer, common duct and landscaping

    交通運輸工程如停車場專用等整地工程雨工程共同管工程及景觀綠美化工程等。
  2. The water - depth computer monitoring system collects data from gps, multi - frequency fathometer ( 16 frequencies ) and plc network. based on the analysis of these data, a three - dimensional underwater ground profile is presented for the scheduled area of geotextiles - laying, the development tool of the three - dimensional underwater ground profile is opengl. this thesis is organized into five chapters

    深計算機監控採集來自gps 、多通測深儀( 16通)以及plc網的數據,將這些數據進行處理后,顯示待鋪設軟體的小區域內的三維下地形,三維地形的開發採用目前國際上流行的三維圖形介面opengl 。
  3. During the second phase of the east lake lakeshore scenery construction project, an approach was taken to establish a public domain including a cha - gang lose - water " observation platform, bathing beach and parking lots. the design and analysis of all these elements have been addressed in the following article as well as other components such as roadway alignment, installation, water bank stabilization, planting, street lighting, sculptures and accessible paths for disables. the proposed landscape will ensure a systematic visual system with enhanced cultural, artistic, and unique characteristics, and properly arranged facilities along the shoreline

    本文通過東湖環湖景觀建設綜合整治二期工程中的茶港親平臺、沙灘浴場及停車場的和景觀設計,對東湖環湖的面、鋪裝、駁岸、綠化、亮化、燈飾、小品、殘疾人通等多個方面進行了分析,以期建立一個一有序的視覺體,增強東湖環湖旅遊線的文化性、藝術性和獨特性,合理安布置配套設施,使之成為一條步移景異,集秀、翠、幽、雅為一體的湖畔風光游覽
  4. The works mainly comprise the demolition of an existing stepped ramp of a footbridge nf85 ; construction of a lift shaft and link slab to connect to the existing footbridge ; improvement works to an existing bus lay - by adjacent to the footbridge ; and associated road, drainage and landscape works

    工程主要包括在橫跨青山公邊圍的現有行人天橋nf85拆除現有臺階斜興建升降機槽及連接臺以連接該現有行人天橋改善近該行人天橋的巴士站及相關的道路排水系統和環境美化工程。
  5. Fibre - cement pipes for sewers and drains - pipes, joints and fittings for gravity systems

    管和用纖維泥管.第1部分:重力管用管管連接件和管配件
  6. Construction of boundary crossing facilities and necessary link roads ; and associated civil, structural, electrical and mechanical, marine, geotechnical, water mains, fire services, environmental mitigation measures, street lighting, traffic aids, directional signs, traffic control surveillance system, landscaping and drainage works

    進行相關的土木結構機電海事土力務設施消防設施環境保護街照明設施輔助交通設備標志交通控制及監察環境美化和渠等工程。
  7. Through setting interior drainage system, water saved in the pavement structure can be eliminated from subgrade and pavement structure, and it does good to improve the pavement performance and prolong the service life of pavement

    設置面結構內部,能夠將積滯在面結構內的分迅速地基、面結構外,有利於改善的使用性能,延長面的使用壽命。
  8. Secondly, it brings forward that it is a practical technical and structure mode to use the multiple preventing layer as the water preventing and draining system in highway tunnel of loess

    然後在總結現有公技術特點的基礎上,提出了黃土公宜採用復合防層為主的適用技術與結構型式,得出了一些有益的結論。
  9. It focuses on designing and selling complete systems of ductile cast - iron pipes for drinking water, irrigation, wastewater drainage and rainwater drainage ; pipe systems for industrial general circuits ; pipe systems for fire prevention ; full ranges of valves, sprinklers and connectors for water and purification systems ; fire prevention and irrigation devices ; complete cast - iron pipe systems for building industry wastewater and rainwater drainage ; and roadworks components made of steel and ductile cast iron and steel for accessing pipe systems water supply, wastewater drainage and telecommunications

    其主要業務是設計並銷售全套球墨鑄鐵管,用於飲用,灌溉,廢放,雨放工業,工業,消防管網及凈所需各類管件及高壓介面,消防及灌溉用各類管件,建築工業用管列廢及雨放,工程用各類配件井蓋等。
  10. E associated works including at - grade roads, drainage, sewers, watermains, slope stabilization and protection works, traffic aids, street lighting, electrical and mechanical works, traffic control and surveillance system works, fire services main, irrigation system, hard and soft landscaping, fire hydrants and emergency crossing

    進行相關的地面及污渠輸管斜坡鞏固護坡電氣及機械園景建築及種植花木緊急過處工程設置輔助交通設備交通管制及監察裝設街照明設備安裝消防管街井頭灌溉
  11. Roads ( works, use and compensation ) ordinance ( chapter 370 ) ( notice under section 8 ( 2 ) ) - - pwp item no. 92cd yuen long, kam tin, ngau tam mei and tin shui wai drainage improvement, stage 1, phase 2b - - tam tin ( works package d ) road works ancillary to the proposed drainage improvement works in cheung po, ma on kong, yuen kong san tsuen and tin sam tsuen areas

    (工程、使用及補償)條例(第370章) (根據第8 ( 2 )條規定所發的公告) - -工務計劃項目第92cd號元朗、錦田、牛潭尾及天圍雨改善工程第1階段第2b期? ?錦田(工程組合d )擬建的長莆、馬鞍崗、元崗新村及田心村地區改善工程? ?附屬工程
  12. Roads works, use and compensation ordinance chapter 370 - notice under section 8 pwp item no. 92cd yuen long, kam tin, ngau tam mei and tin shui wai drainage improvement, stage 1, phase 2b - kam tin works package d road works ancillary to the proposed drainage improvement works in cheung po, ma on kong, yuen kong san tsuen and tin sam tsuen areas

    (工程、使用及補償)條例(第370章) - - (根據第8 ( 2 )條規定所發的公告)工務計劃項目第92cd號元朗、錦田、牛潭尾及天圍雨改善工程第1階段第2b期- -錦田(工程組合d )擬建的長莆、馬鞍崗、元崗新村及田心村地區改善工程- -附屬工程
  13. Roads ( works, use and compensation ) ordinance ( chapter 370 ) - - ( notice under section 8 ( 2 ) ) pwp item no. 92cd yuen long, kam tin, ngau tam mei and tin shui wai drainage improvement, stage 1, phase 2b - - kam tin ( works package d ) road works ancillary to the proposed drainage improvement works in cheung po, ma on kong, yuen kong san tsuen and tin sam tsuen areas

    (工程、使用及補償)條例(第370章) - - (根據第8 ( 2 )條規定所發的公告)工務計劃項目第92cd號元朗、錦田、牛潭尾及天圍雨改善工程第1階段第2b期- -錦田(工程組合d )擬建的長莆、馬鞍崗、元崗新村及田心村地區改善工程- -附屬工程
  14. Roads works, use and compensation ordinance chapter 370 notice under section 8 - pwp item no. 92cd yuen long, kam tin, ngau tam mei and tin shui wai drainage improvement, stage 1, phase 2b - tam tin works package d road works ancillary to the proposed drainage improvement works in cheung po, ma on kong, yuen kong san tsuen and tin sam tsuen areas

    (工程、使用及補償)條例(第370章) (根據第8 ( 2 )條規定所發的公告) - -工務計劃項目第92cd號元朗、錦田、牛潭尾及天圍雨改善工程第1階段第2b期? ?錦田(工程組合d )擬建的長莆、馬鞍崗、元崗新村及田心村地區改善工程? ?附屬工程
  15. Roads ( works, use and compensation ) ordinance ( chapter 370 ) ( notice under section 8 ( 2 ) ) - - pwp item no. 119cd ( part ) drainage improvement in northern new territories, package c ( phase 1 ) - - drainage improvement works at lung yeuk tau, kwan tei, tan shan river and leng tsai, fanling, new territories - - ancillary road works

    (工程、使用及補償)條例(第370章) (根據第8 ( 2 )條規定所發的公告) - -工務計劃項目第119cd號(部分)新界北部雨改善計劃c部分(第一期)新界粉嶺龍躍頭、軍地、丹山河及嶺仔雨改善工程附屬工程
  16. Roads works, use and compensation ordinance chapter 370 notice under section 8 - pwp item no. 119cd part drainage improvement in northern new territories, package c phase 1 - drainage improvement works at lung yeuk tau, kwan tei, tan shan river and leng tsai, fanling, new territories - ancillary road works

    (工程、使用及補償)條例(第370章) (根據第8 ( 2 )條規定所發的公告) - -工務計劃項目第119cd號(部分)新界北部雨改善計劃c部分(第一期)新界粉嶺龍躍頭、軍地、丹山河及嶺仔雨改善工程附屬工程
  17. Roads works, use and compensation ordinance chapter 370 notice under section 8 - pwp item no. 109cd drainage improvement works in tai po road works ancillary to the proposed river improvement works in upper lam tsuen river, she shan river and upper tai po river

    (工程、使用及補償)條例(第370章) (根據第8 ( 2 )條規定所發的公告) - -工務計劃項目第109cd號- -大埔雨改善計劃建議的林村河上游、社山河及大埔河上遊河改善工程附屬工程
  18. Roads ( works, use and compensation ) ordinance ( chapter 370 ) ( notice under section 8 ( 2 ) ) - - pwp item no. 109cd drainage improvement works in tai po road works ancillary to the proposed river improvement works in upper lam tsuen river, she shan river and upper tai po river

    (工程、使用及補償)條例(第370章) (根據第8 ( 2 )條規定所發的公告) - -工務計劃項目第109cd號- -大埔雨改善計劃建議的林村河上游、社山河及大埔河上遊河改善工程附屬工程
  19. The construction of so many homes, roads, shopping centers and parking lots has disrupted the natural drainage systems in coastal areas, and wastes that were once filtered by forests or wetlands are now regularly fouling marinas and beaches

    許多建設如住家、、購物中心、停車場等,已經擾亂了海岸地區天然的;原本該由森林或濕地過濾下來的泄物,現在卻經常污染遊艇碼頭與海灘。
  20. Road drainage system

    道路排水系統
分享友人