遠期信用狀 的英文怎麼說

中文拼音 [yuǎnxìnyòngzhuàng]
遠期信用狀 英文
term credit
  • : Ⅰ形容詞1 (空間或時間的距離長) far; distant; remote 2 (血統關系疏遠) distant in relationship 3...
  • : 期名詞[書面語]1. (一周年) a full year; anniversary 2. (一整月) a full month
  • : Ⅰ動詞1 (使用) use; employ; apply 2 (多用於否定: 需要) need 3 (敬辭: 吃; 喝) eat; drink Ⅱ名...
  • : Ⅰ名詞1 (形狀) form; shape 2 (情況) state; condition; situation; circumstances 3 (陳述事件或...
  • 遠期 : at a specified future date; forward遠期差額 forward margin; 遠期付款 payable at usance; deferred ...
  1. In this paper, on the base of analyzing the reliability operation status and the reliability data of 200mw units with the reliability management information system for jingyuan power plant, the feeble link and the key part of the generation set and system are defined and the corresponding measures are adopted, consequently, is increased the fault ratio of the device we can reduce and enhance security of the power plant, which is an effective method that controls the device reliability by using the mothod of systems engineering, namely plans, organizes, corresponds, controls and supervises the diversified engineering and technic activity of the reliability during the period of the whole device life to realize the reliability aim, minimize the cost of the whole device life and improve the general level of business safety production

    本文在應電廠可靠性管理息系統對該廠的200mw機組運行況和可靠性數據進行分析的基礎上,確定了發電設備和系統的薄弱環節、關鍵部位、並採取相應的措施,從而使設備的故障率減少,使電廠的安全性得以提高。這是一種利系統工程的方法對設備的可靠性進行控制,即對設備全壽命周中各項可靠性工程技術活動進行規劃、組織、協調、控制、監督,以實現確定的可靠性目標,使設備全壽命周最低,提高企業安全生產綜合水平的有效方法。
  2. Firstly, the situation of sif6 ( short for sichuan instrument factory no. 6 ) is introduced, the requirements for sif6 to implement cims engineering are analyzed. the necessities and constraints for sif6 to implement cems are pointed out. the functional demand, information demand and performance demand of cy6 - cems are put forward, the objects of cy6 - cims are presented

    論文以四川儀表六廠cims應工程的規劃與一工程的實施為背景,首先介紹了四川儀表六廠的現,在此基礎上對cims的需求進行了分析,指出了四川儀表六廠實施cims的必要性和各種約束,提出了四川儀表六廠cims系統的功能要求、息要求和性能要求,以及四川儀表六廠cims應工程的總體目標和近目標。
分享友人