邊坡頂 的英文怎麼說

中文拼音 [biāndǐng]
邊坡頂 英文
crest of slope
  • : 邊Ⅰ名詞1 (幾何圖形上夾成角的直線或圍成多邊形的線段) side; section 2 (邊緣) edge; margin; oute...
  • : Ⅰ名詞(地面傾斜的地方) slope Ⅱ形容詞(傾斜) sloping; slanting
  • : i 名詞(人體或物體的最上部) crown; peak; top Ⅱ動詞1 (用頭支承) carry on the head 2 (從下面拱...
  • 邊坡 : bank
  1. The chair chuffed slowly up the incline, rocking and jolting on the frozen clods. and suddenly, on the left, came a clearing where there was nothing but a ravel of dead bracken, a thin and spindly sapling leaning here and there, big sawn stumps, showing their tops and their grasping roots, lifeless. and patches of blackness where the woodmen had burned the brushwood and rubbish

    小車子饅慢地駛上斜,在冰陳了的泥塊上顛簸著前進,忽然左現出一塊空地,是兒只有一叢枯稿了的蕨草,四下雜布著一些斜傾的細長的小樹,幾根鋸斷了的大樹樁,毫無生氣地露著和根還有幾處烏黑的地方,那是樵夫們焚燒樹枝亂草和廢物過后的痕跡。
  2. Mount sainte - genevieve formed an enormous mound to the south ; and it was a sight to see from the summit of notre - dame how that throng of narrow and tortuous streets ( to - day the latin quarter ), those bunches of houses which, spread out in every direction from the top of this eminence, precipitated themselves in disorder, and almost perpendicularly down its flanks, nearly to the water ' s edge, having the air, some of falling, others of clambering up again, and all of holding to one another

    聖日芮維埃芙山像一個巨大圓瓶兀自隆起在東南,這倒是很值得從聖母院上觀看一下的:只見那許許多多狹窄彎曲的街道(今天的拉丁區) ,那密密麻麻的屋宇,從山上向四面八方撒散開來,幾乎一溜筆直地沿著山俯沖下去,直至河,有的像要跌倒,有的像要再爬起來,但又都似乎彼此相互扶持。
  3. He moved from end to end of his voluptuous bedroom, looking again at the scraps of the day s journey that came unbidden into his mind ; the slow toil up the hill at sunset, the setting sun, the descent, the mill, the prison on the crag, the little village in the hollow, the peasants at the fountain, and the mender of roads with his blue cap pointing out the chain under the carriage

    他在他那豪華絕倫的臥室里走來走去,白天旅行的種種情景悄然襲來,闖入他的心裏。黃昏時那緩慢吃力的上路,落山時的太陽,下山,風車,懸崖上的監獄,山坳里的小村,泉水的農民,還有那用藍帽子指著車下鏈條的補路工。
  4. And combining with compound analysis, this thesis has calculated and estimated the deformation and stability of slopes of the cliff debris and residual soil slope project on the project site at k15 + 183 of yong ' an section of yong - zhang highway ; ( 3 ) in the course of the cut slope excavation inner displacement has been in control of real time field monitoring

    同時開挖後期會出現回彈現象。 3 、數值計算成果表明,隨著開挖階數的增加,大小主應力在內也進行不斷的調整。開挖后腳處大小主應力值nlfep程序結果與ansys計算結果較為相似,兩者吻合性較好。
  5. A combined neural network and genetic algorithm with solving stability safety of homogeneous slope was proposed and the finite element method is applied to analysis the progressive failure process of the slope and the maximum equilibrium theory, requests out stability safety of homogeneous slope with the smooth arc radius of difference with the difference below the level coordinate of arc peak, utilizing the neural network algorithm to establish slidng the nonlinear mapping relationship between level coordinate of arc radious and arc peak, being adapted the neural network algorithm to look for along the minimal stability safety of homogeneous slope and corresponding arc radious and arc peak

    提出了求解穩定性安全系數的神經網路與遺傳演算法。該方法採用有限元分析和極限平衡理論,求出不同的滑弧半徑和不同的弧水平坐標下的穩定性安全系數,利用神經網路演算法建立滑弧半徑和弧水平坐標與安全系數之間的非線性映射關系,採用遺傳演算法搜索的最小穩定性安全系數及相應的滑弧半徑和滑弧中心坐標。
  6. The car ploughed uphill through the long squalid straggle of tevershall, the blackened brick dwellings, the black slate roofs glistening their sharp edges, the mud black with coal - dust, the pavements wet and black. it was as if dismalness had soaked through and through everything

    汽車艱辛地爬著上,喲過達娃斯哈的散漫的村落,一些黑色磚墻的屋子,它們的黑石板的屋的尖銳的緣發著亮光,地上的泥土夾著煤屑,顏色是黑的。
  7. Said marian, from the top of the roadside - bank on which they had climbed, and were maintaining a precarious footing in the hope of creeping along its slope till they were past the pool

    瑪麗安說,她們已經爬到了路上,猶豫不定地站在那兒,希望沿著山爬過去,繞過那個水塘。
  8. ( 三 ) under the dynamic load of the explosion, the numeric analysis has been done and achieve the rule as follow : ( 1 ) when the frequency of vibration is 0. 3hz, the acceleration of the slopes top gets the maximum ; so 0. 3hz is believed the natural frequency of the slope as a whole ; ( 2 ) the vibration of explosion can been magnified because of the condition of the landform, when the relative altitude is up to 45m, the acceleration of horizon gets the maximum ; when the relative altitude is up to 100m, the absolute value of acceleration and the deformation of horizon is larger than that in the bottom of the slope ; ( 3 ) in the period of forced vibration, at the top of the slope, the acceleration of horizon become larger and larger ; at the middle part of the slope, it becomes smaller ; ( 4 ) when the explosion velocity of is much little, the shallow part destruction is the primary deformation of the slope

    (三)採用模態疊加法針對爆破動力作用,進行的動力響應分析,得出了以下結論: ( 1 )振動頻率為0 . 3hz時,部水平向加速度峰值最大;綜合考慮,可認為該的自振頻率為0 . 3hz左右; ( 2 )地形對爆破地振動存在放大作用,研究剖面的面,水平向加速度及位移在地形相對高差45米左右最大,而後隨相對高差的增高而減小,相對高差為100米時,水平向位移及加速度絕對值均大於腳; ( 3 )強迫振動段,水平向加速度值隨時間變化的規律為:節點總的變化趨勢是越來越大,而體中部節點的變化趨勢是越來越小; ( 4 )當爆破振速較小時,變形破壞的形式表現為表面滑塌型。
  9. Based on the method of limitation analysis of soil plasticity, researching from the soil arching mechanism of soil - nailing retaining, the upper limit of the critical height of soil - nailing slopes and the minimum horizontal length from coping of the potential slide surface to the edge of deep excavation are obtained through the analysis to weight of soil and vertical loading and the mechanism of soil and soli - nailing acting reciprocally

    摘要基於土的塑性極限分析方法,以均質土為例,從土釘支護結構的準粘聚力理論出發,綜合考慮土體自重、的條形荷載,以及土釘與土體的相互作用的機理,推導出了土釘支護的臨界高度的上限值和潛在螺旋曲線滑動面在方向距基坑沿的最小水平距離解析表達式,可供基抗支護設計參考。
  10. I stood listening to that musical vibration from my lofty slope, to those flashes of separate cries with a kind of demure murmur for background, and then i knew that the hopelessly poignant thing was not lolita ' s absence from my side, but the absence of her voice from that concord

    我站在這高高的斜上,傾聽那微微的音樂般的震顫,傾聽那輕輕的嗡嗡聲中間或迸出的歡叫聲,然後我明白了,那刺痛心肺、令人絕望的東西並不是洛麗塔不在我的身,而是她的聲音不在那和聲里了。
  11. After excavation, there are concentration phenomenon of stress at the corner or the shiplock room, and the tension zone lies in half of the middle part as well as the part of the two slopes to the lower part of the upright wall. finally the analysis results are compared with site monitoring data in period of construction as well as the feedback reports, the result of all comes to meet with each other very well

    開挖完成後,在閘室拐角處存在不同程度的應力集中現象,中隔墩上部1 2的巖體及南北至直立墻部平臺以下的部分巖體為拉應力區。在兩側墻的塑性區出現在損傷區和部分卸荷影響區內,中隔墩大部分區域的巖體都進入了塑性狀態,閘室底板處的塑性區基本上與損傷區一致。
  12. But, there remained a broken country, bold and open, a little village at the bottom of the hill, a broad sweep and rise beyond it, a church - tower, a windmill, a forest for the chase, and a crag with a fortress on it used as a prison

    但是,在山腳下還留著一片破落的田野,粗獷而赤裸。山下有一個小小的村莊,村子那一片開闊地連著個緩,有一個教堂尖塔一個風磨一片有獵林,還有一片峭壁,壁有一座用作監獄的碉堡。
  13. Combining anchor - shotcrete with shed - tunnel structure, a reasonable and complete supporting system of the slope was formed, and the excavation scope of slope reduced significantly

    通過棚洞按一定率回填,種植樹草,可有效地綠化洞口
  14. Everything you see in the film ( aside from the walls, floor, ramp, and complete honda accord ) is parts from those two cars

    你在廣告中看到的一切(從墻、地板、屋、斜到整車)都是從那兩部拆掉的本田雅閣零件製作出來的。
  15. The factors included the characters of terranes and weak interbeds and the intersections with slope surface ; the characters and combinations of structure joints and the intersections with slope surface ; combinations of lithology ; dualistic structure of m - shaped slope made up of red rockmass and overlying deposit soil

    按紅層巖體結構狀態,把紅層巖體結構劃分為4種,然後又按紅層巖體的巖性組合特徵、巖層產狀與面產狀的關系、結構面的發育情況及其與面的關系、以及上覆堆積土的巖體的線形狀和巖土組合特徵細分為13個類型和亞類。
  16. Bearing capacity and displacement are two main problems in the application of geotechnical engineering. based on a series of pull - out tests using three kinds of paper and a sort of window screening as geogrid, twenty - seven in limit and several in working - stress geogrid - reinforced slope model tests designed through orthogonal principle have been conducted to have obtained the relationship between the bearing capacity and four factors ( i. e. reinforcement, angle of reinforced slope, the designed - length of reinforcement and the distance between layers of reinforcement ). the law of slope lateral ( horizontal ) displacement versus to the height of slope vary with external - load was derived from the model test data, and the main factor affecting the lateral and vertical displacement of geogrid - reinforced slope was obtained through analysis

    承載力(強度)和變形是巖土工程應用領域的兩大主要問題,本文以紙和窗紗布模擬加筋土的土工格柵,在一系列拉拔試驗的基礎上,以正交設計理論分別安排27個極限應力狀態和若干個工作應力狀態加筋土模型試驗,並以模型試驗獲得的數據為依據,採用誤差、極差及回歸分析方法,探討了加筋土承載力與筋類、筋長、層間距、角4因素的相關關系,獲得了在外荷載作用下加筋土的側向位移隨高的變化規律(並進行了定性解釋)和的豎向位移特性,並分析其主要控制因素。
  17. A weak loose blasting is adopted to successfully demolish the jamb wall of wall at edge of slope, the blasting safety is ensured in a complex environment

    摘要如何保證在復雜環境條件下的爆破安全,位於緣的提灌站出水池胸墻採用弱松爆破拆除達到了預期效果。
  18. Two - dimensional and three - dimensional stability analyses under pressure on top surface of slope

    壓力下的二維與三維穩定分析
  19. After the engineering slope was dug, several small plastic zone the designed rock - fill dam will coming in the temporary slope, because rock - fill dam change the stress field on a small degree. but a gravity dam will arouse a great area of plastic zone in the permanent slope, which will bring a stability problem. after detail and depth study, the rock - fill dam project is more compatible of the engineering geology condition in nuozadu hydraulic - power station ' s dam site

    工程開挖后,擬定的堆石壩方案由於嵌入淺,應力的調整有限,塑性區主要分佈在壩高程附近的較小范圍內;而擬定的重力壩方案,由於嵌入深,引起了一定程度的應力調整,巖體表層產生了鬆弛變形,塑性區主要分佈在壩高程到前緣(永久)的v ivb類巖體分佈區。
分享友人