邊蓄 的英文怎麼說

中文拼音 [biān]
邊蓄 英文
ben suc
  • : 邊Ⅰ名詞1 (幾何圖形上夾成角的直線或圍成多邊形的線段) side; section 2 (邊緣) edge; margin; oute...
  • : 動詞1. (儲存; 積蓄) store up; save up 2. (留著而不剃掉) grow 3. (心裏藏著) entertain (ideas); harbour
  1. Richard yem sync : under the action of the waves the hydraulic ram ' s blue unit, shown down here on my left, pumps high pressure fluid into these large accumulators

    Richard同步解說:在波的作用下,液壓油缸的藍色單元,在我的左,將高壓液體泵入大型電池。
  2. M ) richard yem sync : under the action of the waves the hydraulic ram ' s blue unit, shown down here on my left, pumps high pressure fluid into these large accumulators

    Richard同步解說:在波的作用下,液壓油缸的藍色單元,在我的左,將高壓液體泵入大型電池。
  3. This paper establishes a model simulating dam actual placing process and considering the non - continuity of initial temperature on the boundary of new and old concrete, daily air temperature change, concrete - placing temperature, hydration heat, heat insulation on boundary, water - storing process, placing intermission and curing with water. the calculation of stress field considers the concrete weight, static water pressure, thermal stress, different autogenous volume change between rcc and normal concrete, change of elastic modulus of concrete with age and creep action

    考慮了乞今最為全面的初始條件和界條件,包括模擬壩體的實際升程過程,考慮了新老混凝土接觸面上的初始溫度不連續,逐日的氣溫變化,混凝土的入倉溫度,水化熱溫升,界保溫,水庫水過程,澆築間歇以及灑水養生等因素;應力場的計算考慮了混凝土的自重,靜水壓力,溫度應力,常態混凝土與碾壓混凝土不同的自生體積變形,混凝土的彈性模量隨齡期的變化以及徐變的作用。
  4. In addition according to the comparison of typical floods the impact of floodplain morphology to the flood propagation was studied. no continuous water body in main channel and floodplain and the change of floodplain morphology and the increased flood detention capacity caused the time of flood propagation increasing and the flood types changing in abnormally

    同時通過對典型洪水的對比分析,研究了灘地界條件對洪水運行的影響,認識到由於主槽與灘地水體不連續以及灘地地形的改變,灘地洪能力增大,造成洪水傳播時間增長和洪峰峰型的異常變化。
  5. Fryeburg, in south - west maine near the new hampshire border, sits on an enormous aquifer

    福萊伯位於緬因州的西南地區,靠近新罕布希爾的界,擁有巨大的地下水層。
  6. Batteries may be constructed with one-piece cover, with double flanged seal channels on the under side, into which sealing compound is poured.

    電池可以是整體蓋結構的,在蓋底上有一個供灌注封口劑用的凸出的雙封溝。
  7. There. a cistern on the other side

    那裡,在另一有一個水池
  8. The adverse impact of developing fca on the ecological sites, surface drainage, and flood storage raises environmental concern

    發展界禁區對于具生態價值之地點、地面排水及洪方面帶來的負面影響,會引起人們對環境的關注。
  9. Aiming at the complex boundary in the numerical calculation of flood diversion area, a bevel angle cartesian method is adopted based on the traditional cartesian method

    摘要針對分洪區水流數值計算中的復雜界問題,在傳統笛卡爾坐標方法的基礎上改用斜角笛卡爾方法。
  10. He stands about 1. 55 metres and is of medium build and dark complexion. he has a square face, small eyes, and short black hair with white sideburns

    六十二歲的姜偉雄身高約一點五五米,中等身材,方面,細眼,黝黑膚色,有黑色短發及兩白鬢。
  11. Unquestionably there ll be nick, an englishman with a long grey beard, selling second - hand books. watch out, too, for the filipino family further down the road selling exceptional meat satay on a stick and, if you re lucky, just beside the pizza milano kitchen, you may hear a bunch of west africans practising their drum routine

    例如,你會遇上了一臉胡須的英國人力克在推薦他的二手書又可能碰到一個菲律賓家庭,在售賣他們美味的沙爹串湊巧的話,你還可在pizza milano kitchen旁,欣賞到一群西非人擊鼓作樂。
  12. ( 2 ) a series of experiments on time scale distortion are made with real river model, inflow and outflow boundary condition, and continuous simulation. by means of analysis of the experimental data on model water level, water - surface gradient, cross velocity, outflow discharge process and the sediment transportation capacity, the main physical reasons for the above hydraulic parameters deviations caused by time scale distortion are illustrated : response delay of model channel storage capacity and rate of water level with time

    ( 2 )採用真實的河工模型和入出流界控制條件以及連續模擬的方法進行了有關時間變態率的系列試驗,通過模型水位、比降、流速、出口流量過程線和斷面挾沙力試驗資料的分析,闡明了時間變態引起上述各種水力參數偏離的主要物理原因:模型的槽響應和洪水過程時間變化率的響應滯后。
  13. ( 6 ) conclusion was obtained by the analyzing the mechanics environment and the stability of the lanslide on the right bank after the dam built : the value of the rock mass stress increased and the tensile stress region obviously reduced, the direction of the principal stress was unchangeable the dam and the landslide were stable under the dangerous condition ( the reservoir and at the same time the earthquake was viii ), but when the water lever suddenly fell and did not think of other force, safe factor evidently reduced, the dam and the landslide will be destroyed under the most dangerous condition ( the water lever suddenly fell and at the same time the earthquake was vi ) ; the stability of the landslide will be destroyed by the horizontal thrust under the most dangerous condition or ; the physical and mechanical parameter will be reduced due to long period filter, the landslide will be destroyed too

    ( 6 )建壩工程荷載條件下河谷巖體力學環境分析及右岸古滑坡體的穩定問題分析得出:建壩后河谷的巖體應力量值明顯增高,同時左岸的張應力區的范圍及量值明顯減小,主應力的方向依然與模型的底界垂直;大壩建成后逐漸水階段以及同時考慮本區最強地震力的作用等各種不同的工況條件時,滑坡體及壩體總體上仍處于穩定狀態;水位驟降時,在未考慮其他外力作用的情況時,滑體的安全系數將顯著降低。若考慮水位驟降及本區最大地震力的共同作用,壩體將在滑坡體下滑推力的作用下產生破壞;建壩后水平推力對右岸古滑坡體穩定性的影響分析可以看出,在最危險的工況條件下,壩體及滑坡體也將處于臨界狀態;在長期滲透變形的作用下,由於滑帶的物理力學參數的降低而有可能導致壩體失穩破壞。
  14. Qualitative analysis on the effect of flood control and engineering safety -, seizing lots of water conservancy effective adjust storage. then making water level risen and reservoir backwater enlarged in the same flow level ? effect on beach and the buildings across river, soil salinization caused by flow from a lower to a higher place and unsmooth groundwater drainage destroy of travel resource caused by disorder enclose tideland for cultivation in reservoir silt up flood plain are given, then presents enclose tideland for cultivation dyke is important cause which water level rise in reservoir

    本文從青銅峽水庫泥沙淤積入手,分析水庫泥沙淤積特性和庫區圍墾堤開發利用淤積灘地的現狀,對防洪安全及工程安全的影響、侵佔大量的有效調庫容、造成同級流量下水庫水位抬升水庫回水上延、對沿岸及過河建築構成影響、因水位抬升致使庫區周灌區地下水排水不暢乃至倒灌而造成土地鹽堿化、對水庫庫區大量淤積灘地無序圍墾造成旅遊資源破壞等五方面影響的定性分析,提出庫區圍墾堤是水庫水位抬升的重要原因。
  15. The reservoir bank collapse are also discussed in this paper. the bank destruction widths are respectively predicted. for the immersion field appeared in either bank of the reservoir after the reservoir impoundment, this paper predicts the immersion incidences by the investigation and analysis

    同時對水庫運行期的岸再造現象進行了塌岸寬度預測,並確定了水庫水后東門尕莊、波浪灘、上下灘、馬爾坡一帶發生浸沒的范圍。
  16. The choice dam type is especial importance, during the designed research of the rock - fill dam, particular under the rock - fill dam with very deeply cover layer, the stress and strain of the middle wall and cutting interpenetration wall of the dam foundation is mostly sensitive, whether the. design of dam is scientific and reasonable, it is very important for cutting interpenetration and stability of the dam, the article offer the reference for the design of cutting interpenetration in the foundation with deep cover with earth the water conservancy in xiaban zone, based on the study and analysis the design of cutting seep in the foundation with deep cover with earth, cutting interpenetration concrete wall and the joining model of cutting interpenetration material in body of dam and the applying effect in the practical worko based on the foundation which absorbed and summarize the achievement of design and research in the inter and outer country, for the project of the clay vertical middle wall and vertical cutting interpenetration, the asphalt concrete vertical middle wall and vertical cutting interpenetration the clay inclined middle wall and the lever carpet layer cutting interpenetration, respectively in terms of the different stage of complete period sluice period and working condition, adopting nonlinear calculate and analysis with the finite element method ; carrying the analysis and study with the 3d finite element method as to the different joining model of the left bank high slope cutting interpenetration body and the foundation concert cutting interpenetration wall ; carrying the analysis and study with the 3d finite element method as to the effect of the wall stress and strain because of the different elasticity modulus of the concert cutting interpenetration wall through the analysis and study with the different project. have comparatively all - around comprehended the various model dam, particular the distribute rule of stress and strain of the cutting interpenetration system, provide for the important evidence of the plastic area size the join model of the foundation cutting interpenetrate wall and dam body cutting interpenetrate system the choice of the dam model and the design of the structure of the dam body, the result of research and advice have very importance value in design and building for the similarity project

    工程設計中,壩型的選取顯得尤為重要,特別對于壩基有深厚覆蓋層的堆石壩,心墻和壩基防滲墻的應力和變形是壩體、壩基最敏感的部位,設計方案是否安全、科學和合理,對大壩防滲和穩定起到至觀重要的作用。本文研究分析了國內外深厚覆蓋層基礎防滲設計、壩基混凝土防滲墻與壩體防滲體銜接形式及工程實際應用效果,為下坂地水利樞紐工程深厚覆蓋層基礎防滲設計的方案選擇提供了參考;在吸收和歸納了國內外堆石壩的設計研究成果的基礎上,對粘土心墻和壩基垂直防滲方案、瀝青混凝土心墻和壩基垂直防滲方案以及粘土斜心墻和壩基水平鋪蓋防滲方案,分別按竣工期和水運行期的不同工作情況進行了有限元非線性計算分析;對左岸高陡坡的大壩防滲體與基礎混凝土防滲墻的不同結合型式進行了三維有限元靜力計算分析和研究;對混凝土防滲墻不同彈性模量對墻體應力和變位的影響進行了三維有限元靜力計算分析和研究。通過對不同方案的計算分析和研究,比較全面的了解了各方案壩體,尤其是防滲體的應力和變形分佈規律,為壩型選擇、壩體結構設計、基礎防滲墻與壩體防滲體的結合型式以及塑性區大小的確定提供了重要依據。
  17. Displacement function means for calculating geostress in fem analysis of underground houses is used, based on crustal stress data of underground cavern of pump water station of tong guanshan yixing to store energy, applying the displacement function theory and 3d nonlinear fem, the thesis simulates a displacement field applied the boundary in engineering area and obtain the initial crust stress field through load function in ansys. the result shows that the error between regressed ones and actual ones is controlled in allowed limit and supply the important data for building and design

    根據宜興銅官山抽水能電站地下廠房區的地應力實測資料,運用位移函數法理論,採用三維非線性有限元計算方法,反演出施加在廠房區界上的位移場,藉助州sys有限元分析軟體,獲取模型界節點的坐標信息,然後通過ansys軟體的載荷函數將界位移程序化施加到模型界上,最後得到整個區域的初始地應力場,結果表明回歸后的地應力值與實測值接近,為地下工程的施工設計提供了重要的資料。
  18. By the amended ‘ alternative hypothesis ’ model, the article proves that excess sensitively coefficient equates to the income of the short - looking consumer accounts for the gross income. at the same time, it proves that the intertemporal elasticity of substitution of the china is near zero

    並且通過兩個修正後的「二分」儲模型證明了:在短視型居民的際消費傾向為1的假設下,過度敏感性系數等同於短視型消費者收入占總收入的比重。
  19. This superintendent was a slim creature of thirty - five, with a sandy goatee and short sandy hair ; he wore a stiff standing - collar whose upper edge almost reached his ears and whose sharp points curved forward abreast the corners of his mouth - a fence that compelled a straight lookout ahead, and a turning of the whole body when a side view was required ; his chin was propped on a spreading cravat which was as broad and as long as a bank - note, and had fringed ends ; his boot toes were turned sharply up, in the fashion of the day, like sleigh - runners - an effect patiently and laboriously produced by the young men by sitting with their toes pressed against a wall for hours together

    這位校長是個歲的瘦子,著沙灘色的山羊胡和沙灘色的短頭發他穿著一副硬挺挺的衣服領子,領幾乎頂到他耳,兩個尖尖的領角順著脖子彎過來,到他的嘴角就像一堵圍墻似的,逼著他只能往前方看,每當他要看旁的時候,就不得不把整個身子都轉過來他的下巴托在一條寬大的領結上面,那個領結就像一張支票那樣又寬又長,周圍還帶有花
  20. There is a picked body of heroes who reserve themselves for great occasions.

    他身還有一批經過精心挑選的勇士,這些勇士們養精銳,以待所用。
分享友人