部分裝載 的英文怎麼說

中文拼音 [fēnzhuāngzǎi]
部分裝載 英文
part cargo shipment
  • : Ⅰ名詞1 (部分; 部位) part; section; division; region 2 (部門; 機關或組織單位的名稱) unit; mini...
  • : 分Ⅰ名詞1. (成分) component 2. (職責和權利的限度) what is within one's duty or rights Ⅱ同 「份」Ⅲ動詞[書面語] (料想) judge
  • : Ⅰ名詞1 (服裝) dress; outfit; attire; clothing 2 (演員的化裝品) stage makeup and costume Ⅱ動詞...
  • : 載Ⅰ名詞(年) year : 一年半載 six to twelve months; six months to a year; 三年五載 three to five ...
  • 部分 : (整體中的局部或個體) part; section; portion
  • 裝載 : freight; loading; shipping; capacity; storage; embarkation; laden
  1. In view of bearing capacity of the elastoplastic theory analysis, the author made a comparison between the achieved bearing capacity limit load pi / 4 of round base ( space problem ) and the limit load pi / 4 of bar groundwork foundation design ( plane problem ) from soil mechanics at home and abroad as well as foundation criterion, and explained why the value of formula in present design criterion from soil mechanics is inclined to be conservative. in the light of the author ' s many years experience of vibration test on the spot and the research work of relevant projects, the author worked over the dynamic pile testing of the bearing capacity of foundation and batholith, and gathered the parameter of dynamic analysis and testing. the author also talked over the difficult point of pile foundation design criteria in present batholith engineering world, i. e. the confirmation of batholith bearing capacity of pile end, from the following aspects : a ) confirmation of single axis counter - pressure strength of rock in house ; b ) f. e. m calculation of elastoplastic model ; c ) calculation of soil mechanics ; d ) deep well load test

    然後,對巖土工程領域至今尚未解決,甚至不為人注意的考慮地基變形的地基承力問題進行了實用化的探討,提出了考慮地基變形的地基承力上程計算方法;對基於彈塑性理論析的地基承力國內尚未見報道的空間問題得到了圓形基礎(空間問題)的承力界限荷p _ ( 1 / 4 ) ,並與國內外土力學專著及地基基礎設計規范中的條形基礎(平面問題)的界限荷p _ ( 1 / 4 ) ,進行了對比,從而定量上解釋了目前設計規范引用土力學承力公式值偏於保守的這一情況;根據本文作者多年從事現場地基工程振動試驗及相關課題的研究工作,本文以截頭錐模型模擬地基,對地基(巖基)承力的動測法進行了研究,為各類地基(包括巖基) ,匯總了動力析和檢測川的參數:針對日前巖土工程界應用樁基設計規范中的難點? ?樁端巖基承力的確定問題,從巖石室內單軸抗壓強度確定、基於彈塑性模型的有限單元法計算、土力學計算及深斤荷試驗四方面進行了深入討論;本文作者根據多年現場荷試驗的工程實踐,對深井荷試驗置的核心? ?反力置,設計了側壁支撐反力加系統,該加系統具有實用、簡便、穩定及安個等優點。
  2. Determination of dimensional characteristics of sleeping bags - part 3 : volume under load and easiness of packing

    睡袋尺寸特性的測定.第3:受下的容積和易包
  3. Safety of woodworking machines - circular sewing machines - part 8 : single blade edging circular rip sawing machine with power driven saw unit manual loading and or unloading

    木工機械安全.圓形鋸床.第8:帶動力驅動置人工或卸單鋸條粗齒圓鋸床
  4. Packaging - pallets for materials handling - part 2 : working load

    .物料運輸用托盤.第2:工作
  5. After the briefly present the origin and features of internet protocol version 6 ( ipv6 ), the paper detailedly introduced the conception, characters, security technologies of vpn, and main tunnel protocols used to implement and deploy vpns. after analyzing and comparing these technologies of realizing vpns, we choosed ipsec. then, the paper analyzed in the ipsec structure, function, work mode, and its components such as authentication header ( ah ), encapsulating security payload ( esp ), internet key exchange ( ike ), encryption and authentication algorithms, security association, security policy, and how they cooperate with each other in order to secure ip packages

    在簡要介紹ipv6協議的由來和優點之後,詳細闡述了虛擬專用網的概念、特點、安全技術及實現的關鍵隧道協議,通過對實現技術的析比較,選用了安全性強大的ipsec隧道技術,接著深入研究了ipv6安全協議ipsec的體系結構、操作模式,詳細論述了ipsec協議簇的各個組成,如認證報頭ah協議、封安全荷esp協議、密鑰管理ike協議、加密認證演算法、安全聯盟和安全策略等,以及這些組件之間如何協作,來共同實現對網路層ip數據包的安全保護。
  6. Freight containers. information related to containers on board vessels. part 1 : bay plan system

    貨運集箱.有關船箱的信息.第1:間檔方案系統
  7. Measurement of fluid flow by means of pressure differential devices inserted in circular cross - section conduits running full - part 2 : orifice plates

    用插入滿的圓截面管道中的壓差置測量流體流量.第2:節流孔板
  8. Venturi measurement of fluid flow by means of pressure differential devices inserted in circular cross - section conduits running full - part 4 : venturi tubes

    用插入滿的圓截面管道中的壓差置測量流體流量.第4:文杜利
  9. Refuse collection vehicles and their associated lifting devices. general requirements and safety requirements. part 1 : rear - end loaded refuse collection vehicles

    垃圾收集車及其相關升降置.一般要求和安全要求.第1:尾式垃圾收集車
  10. Refuse collection vehicles and their associated lifting devices - general requirements and safety requirements - part 1 : rear - end loaded refuse collection vehicles

    垃圾收集車及其附屬提升置.一般要求和安全要求.第1:後式垃圾收集車
  11. Electro - hydraulic servo loading system ( ehsls ) is used to simulate the aerodynamic torque acting on the rudder of missiles, and it is one of the main simulation equipments in hardware - in - loop flight simulation laboratory

    電液伺服加系統是導彈武器系統半實物模擬中模擬作用在導彈舵面上氣動荷的加置,它是導彈在實驗室內進行半實物模擬的主要設備之一,是飛行器大迴路模擬中的重要組成
  12. In addition, resovling the base for fixing actuator in the part of setting and debugging of whole test bench ; indicating performance of the test bench reliability and the test data is accord with correlative standard and may be taken as the bases of trouble shooting and maintain for tractor hydraulic lift system through testing the hydraulic lifter ' s static performance of tractor newholland 110 - 90. postgraduate : shenggang luan major : mechanism design and theory tutor : prof. bolin mi

    試驗臺的安與調試主要是完成加油缸的地基處理,而在試驗通過對紐荷蘭110 - 90型拖拉機液壓提升器的靜態性能的檢測,表明本試驗臺性能可靠,所得到的試驗數據滿足相關標準中規定的精度要求,可以作為拖拉機液壓懸掛系統故障診斷和預知維修的依據。
  13. The ability of keeping the ip packet ' s integrity, secrecy, authentication, data origination, anti - relay is discussed. the relationship of ipsec component authentication header ( ah ), encapsulating security payload ( esp ) and ike ( internet key exchange ) is also talked about. this discussion of ipsec makes the impression that ipsec make ip layer security enough

    論述了ipsec在ip報文的完整性、機密性、數據來源認證和抗重播等方面的能力, ipsec的基本協議? ?認證報文頭( ah )和安全封荷報頭( esp )與ipsec安全體系的其它組成如安全策略、加密和認證演算法、密鑰管理等如何合作,共同完成對ip報文的安全保護。
  14. In any situation whatsoever and wheresoever occurring and whether existing or anticipated before commencement of or during the voyage, which in the judgment of the carrier or the master is likely to give rise to risk of capture, seizure, detention, damage, delay or disadvantage to or loss of the ship or any part of her cargo, or to make it unsafe, imprudent, or unlawful for any reason to commence or proceed on or continue the voyage or to enter or discharge the goods at the port of discharge, or to give rise to delay or difficulty in arriving, discharging at or leaving the port of discharge or the usual or agreed place of discharge in such port, the carrier may before loading or before the commencement of the voyage, require the shipper or other person entitled thereto to take delivery of the goods at port of shipment and upon failure to do so, may warehouse the goods at the risk and expense of the goods ; or the carrier or the master, whether or not proceeding toward or entering or attempting to enter the port of discharge or reaching or attempting to reach the usual place of discharge therein or attempting to discharge the goods there, may discharge the goods into depot, lazaretto, craft, or other place ; or the ship may proceed or return, directly or indirectly, to or stop at any port or place whatsoever as the master or the carrier may consider safe or advisable under the circumstances, and discharge the goods, or any part thereof, at any such port or place ; or the carrier or the master may retain the cargo on board until the return trip or until such time as the carrier or the master thinks advisable and discharge the goods at any place whatsoever as herein provided ; or the carrier or the master may discharge and forward the goods by any means, rail, water, land, or air at the risk and expense of the goods

    四、不論任何地方任何情況,不論是在開航前或航程中存在或預料到的,只要承運人或船長認為可能有導致捕獲、扣押、沒收、損害、延誤或對船舶或其貨物不利或產生滅失,或致使起航或續航或進港或在卸貨港卸貨不安全、不適當、或非法,或致使延誤或難于抵達、卸或離開卸貨港或該港通常或約定的卸貨地,承運人可在貨或開航前要求發貨人或與貨物權利有關的其他人在貨港口提回貨物,如要求不果,可倉儲貨物,風險和費用算在貨主頭上;承運人或船長,不論是續航至或進入或企圖進入卸貨港,或抵達或企圖抵達港口通常的卸貨地,或企圖在此卸貨,也可將貨物卸在倉庫、檢疫站、駁船,或其他地方;船舶也可續航或回航,直接或間接地,抵達或停留在船長或承運人在此情況認為安全或適當的任何港口或地點,全將貨物卸在此港口或地點;承運人或船長也可將貨物留在船上,直到回航或直到承運人或船長認為適當時將貨物卸到本合同所規定的任何地方;承運人或船長也可卸貨並將貨物用任何交通工具,經鐵路、水路、陸路、或空運轉運貨物,風險和費用算在貨主頭上。
  15. Safety of woodworking machines - circular sawing machines - part 15 : multiblade cross - cut sawing machines with integrated feed of the workpiece and manual loading and or unloading

    木工機械的安全.圓盤鋸床.第15:帶工件一體進料和人工和或卸功能的多鋸條橫切鋸機
  16. As a detecting device working underwater, the synthesize aperture sonar is fixed in the underwater carrier

    作為水下探測器的一種,該系統的水下探測體內承的是合成孔徑聲納系統。
  17. Mining machinery terminology - part 2 : loading equipment

    礦山機械術語第2設備
  18. Terms for railway vehicle parts - accessories - part 2 : load fastening devices

    有軌機動車件名稱.附件.第2:物固定
  19. Road traffic noise reducing devices. test method for determining the acoustic performance. part 2 : intrinsic characteristics of airborne sound insulation

    道路交通噪音減弱置.聲性能測定試驗方法.第2:氣聲隔絕固有特性
  20. Testing earth - moving machinery - measurement of tool forces and tipping loads of loaders

    運土機械試驗.第2:機工具強度和翻倒荷的測量
分享友人