部載荷 的英文怎麼說

中文拼音 [zǎi]
部載荷 英文
compound loading
  • : Ⅰ名詞1 (部分; 部位) part; section; division; region 2 (部門; 機關或組織單位的名稱) unit; mini...
  • : 載Ⅰ名詞(年) year : 一年半載 six to twelve months; six months to a year; 三年五載 three to five ...
  • : 荷名詞(蓮) lotus
  • 載荷 : load; loading載荷變化 load fluctuation; variation in load; 載荷裝置 load device
  1. In view of bearing capacity of the elastoplastic theory analysis, the author made a comparison between the achieved bearing capacity limit load pi / 4 of round base ( space problem ) and the limit load pi / 4 of bar groundwork foundation design ( plane problem ) from soil mechanics at home and abroad as well as foundation criterion, and explained why the value of formula in present design criterion from soil mechanics is inclined to be conservative. in the light of the author ' s many years experience of vibration test on the spot and the research work of relevant projects, the author worked over the dynamic pile testing of the bearing capacity of foundation and batholith, and gathered the parameter of dynamic analysis and testing. the author also talked over the difficult point of pile foundation design criteria in present batholith engineering world, i. e. the confirmation of batholith bearing capacity of pile end, from the following aspects : a ) confirmation of single axis counter - pressure strength of rock in house ; b ) f. e. m calculation of elastoplastic model ; c ) calculation of soil mechanics ; d ) deep well load test

    然後,對巖土工程領域至今尚未解決,甚至不為人注意的考慮地基變形的地基承力問題進行了實用化的探討,提出了考慮地基變形的地基承力上程計算方法;對基於彈塑性理論分析的地基承力國內尚未見報道的空間問題得到了圓形基礎(空間問題)的承力界限p _ ( 1 / 4 ) ,並與國內外土力學專著及地基基礎設計規范中的條形基礎(平面問題)的界限p _ ( 1 / 4 ) ,進行了對比,從而定量上解釋了目前設計規范引用土力學承力公式值偏於保守的這一情況;根據本文作者多年從事現場地基工程振動試驗及相關課題的研究工作,本文以截頭錐模型模擬地基,對地基(巖基)承力的動測法進行了研究,為各類地基(包括巖基) ,匯總了動力分析和檢測川的參數:針對日前巖土工程界應用樁基設計規范中的難點? ?樁端巖基承力的確定問題,從巖石室內單軸抗壓強度確定、基於彈塑性模型的有限單元法計算、土力學計算及深斤試驗四方面進行了深入討論;本文作者根據多年現場試驗的工程實踐,對深井試驗裝置的核心分? ?反力裝置,設計了側壁支撐反力加系統,該加系統具有實用、簡便、穩定及安個等優點。
  2. The warhead is the missile's payload, or cargo.

    戰斗是導彈的有效,即運物。
  3. The main components of the latter are multi - rib sandwich panels, including floor slabs and wall slabs. reinforced concrete conformation columns are set where the longitudinal walls and latitudinal walls intersect and copulative beams are set where floor slabs and wall slabs intersect. they play a role of linking and transferring loads, bearing a small part of loads at the same time

    無骨架體系的主要承重構件是密肋夾芯板(包括樓板和墻板) ,縱、橫墻相交處設鋼筋混凝土構造(連接)柱,墻板和樓板相交處設連系(圈)梁,連系梁和柱主要起連接和傳遞作用,也承擔少
  4. Directed against the problem on confirming vertical bearing capacity of large diameter cast - in - place pile in the west of coteau area of yunnan province, the paper, analyses the influence degree of the variety of soil physics and mechanics property in area geology condition on bearing capacity of pile foundation, through 5 piles " loading test ; the influence degree of construction technics on bearing capacity of pile foundation under the influence of every exterior factors ; the influence degree of grouting injection around the pile shaft on bearing capacity of pile foundation

    本文針對滇西山區大直徑灌注樁豎向承力確定存在的問題,進行了5根試樁的靜試驗,分析了區域地質條件下土的物理、力學性質的變化對橋梁樁基承力的影響程度;地下水對樁承力的影響程度;各種外因素影響下,樁的施工工藝對樁承力的影響程度;通過在樁體周圍土中注漿對樁承力的影響程度。
  5. When reinforced concrete upper structure - piled raft - subsoil system is studied, every part of this system is looked upon homogeneous discrete space. accofding to static equivalent principle, equivalent node loads are calculated, and load embattle is integrated with element equivalent node force and directly bearing load

    在分析時,本文將鋼筋混凝土上結構和地基、基礎的研究問題視為各向同性空間問題,且按靜力等效原則計算等效節點列陣由單元等效結點力和直接作用於單元結點上結點集成而得。
  6. Flying boat is a controllable aircraft that can flying in the air, the flotage provided by the helum - filled bag inside the flying boat can support the boat and it s load in the air, motor pushing it forward ; the direction is guided by the device on it s tail, going down of the boat is made by escaping the gas inside, it can rise or fall straightly or stay in the air, no necessity of special site for taking off

    飛艇是一種可操縱的浮於空中的飛行器。在飛行中主要依靠內充滿氦氣的氣囊提供的浮力,將飛艇及其支持在空中,發動機為其提供前進的動力,通過操縱尾翼上的升降舵和方向舵控制飛艇的俯仰和方向運動,飛艇的下降是通過排放氣來實現的。飛艇可以垂直起降空中懸停,不需要有專用設備的起降場。
  7. Lintels - method for assessment of load

    門窗過梁.第1分:評定方法
  8. In different in terne die travel, the metal flow characterize in warm extrusion forming processes and the affection for the flow of metal stage which made by the difference between the blank bottom altitude and the axial direction limiting size in warm extrusion forming technique have been analysed we have gotten the equivalent strain field and the velocity field and other field variable that the blank in different in terne die travel and the die travel - load curve. at the same time, we have analyzed the contributing factor for the oil pump stator forming process optimized and achieve thereasonable die parameter for the war m extrusion forming finally, the optimized technics parameters were used into pilot production, then the qualified oil pump stator forging were produced, the analog results were compared with those of pilot production

    論文具體分析研究了不同成形工藝過程中金屬流動的特點,並對不同凸模行程下溫擠成形過程中的金屬流動特點、坯料連皮厚度(底高度)與溫擠壓成形工藝中的軸向界限尺寸的差值對金屬變形階段的影響進行了分析,獲得了坯料在不同凸模行程下的等效應變場、速度場等場變量及凸模行程-曲線,同時對油泵定子成形過程的影響因素等進行了分析,優化並獲得了合理的溫擠成形工藝及模具參數。最後,利用模擬優化獲得的各項工藝參數進行生產實驗,得到實際生產出的合格油泵定子件,並將模擬結果與生產實驗結果進行比較。
  9. Packaging - pallets for materials handling - part 2 : working load

    包裝.物料運輸用托盤.第2分:工作
  10. Under special conditions such as low partial load / deep vacuum, unexpected high air leakage resulting in a major temperature difference ( above 10 c ) between the steam exhaust turbine temperature and all air - take off temperature measurement, the suction capacity can be improved by using 2 main ejector simultaneously

    在特殊條件如局/極端真空,不正常的熱交換,意想不到的高空氣泄漏導致的在蒸汽排氣溫度和抽空溫度測量上產生的嚴重溫差( 10 c以上) ,用兩臺主抽汽器同時工作可以提高抽氣量。
  11. After the briefly present the origin and features of internet protocol version 6 ( ipv6 ), the paper detailedly introduced the conception, characters, security technologies of vpn, and main tunnel protocols used to implement and deploy vpns. after analyzing and comparing these technologies of realizing vpns, we choosed ipsec. then, the paper analyzed in the ipsec structure, function, work mode, and its components such as authentication header ( ah ), encapsulating security payload ( esp ), internet key exchange ( ike ), encryption and authentication algorithms, security association, security policy, and how they cooperate with each other in order to secure ip packages

    在簡要介紹ipv6協議的由來和優點之後,詳細闡述了虛擬專用網的概念、特點、安全技術及實現的關鍵隧道協議,通過對實現技術的分析比較,選用了安全性強大的ipsec隧道技術,接著深入研究了ipv6安全協議ipsec的體系結構、操作模式,詳細論述了ipsec協議簇的各個組成分,如認證報頭ah協議、封裝安全esp協議、密鑰管理ike協議、加密認證演算法、安全聯盟和安全策略等,以及這些組件之間如何協作,來共同實現對網路層ip數據包的安全保護。
  12. The inversion confirms that plate boundary actions are main factors controlling the regional stress field, and spreading forces of mountains and seashores are another important factor

    同時顯示了板塊在垂直下的彎曲對局水平應力場造成相當的影響。
  13. In this test, a special bolt - jack is used to exent of prestressing force to brace angles as the whole structure is under dead - load. in this state brace angles withstand partly load before twice - load and the stress and strain of concrete are decreased. in this way the aim of removal of load and strengthening can be reached

    本試驗中採用專用螺栓千斤頂在恆定水平下對混凝土柱角鋼撐桿施加預壓應力,使外包角鋼在二次受力前即分擔,使混凝土應力水平和應變水平降低,達到卸與加固同步進行的目的。
  14. Destructive tests on welds in metallic materials - cold cracking tests for weldments - arc welding processes - externally loaded tests

    金屬材料焊接的有損檢驗.焊接的冷裂試驗.弧焊工藝.外部載荷試驗
  15. In order to analysis the contact problem between elasticity roller and rigid plane, another iterative process is raised. supposing the right contact point has been known, the left contact point has to be found and the distribution of stick zone and slip one have to be determined in each iterative process. the outer load is evaluated according to the solved force distribution in contact zone

    針對彈性滾柱與剛性平面的穩態滾動接觸問題,採用已知接觸區右端點來搜索接觸區左端點以及區內粘連區、滑移區分佈的迭代搜索方法,並根據搜索得到的接觸區內分佈壓力反求出外部載荷
  16. The paper puts forward an iterative process to searching for the contacted zone and the distribution of contact force, in the case of the outer loading has been known. the regularization algorithm is used to evaluate the mechanical parameters of the near - boundary points in contact bodies

    列出了運用邊界元法解決靜態接觸問題的基本算式,設計了根據已知外部載荷來搜索接觸長度和接觸壓力分佈的迭代搜索方法,運用幾乎奇異積分的正則化演算法,求解了接觸體內近邊界點的力學參量。
  17. Finally, the finite element software ansys is used to analyze the stress of missile connecting mechanism in critical moments, which displays the inner load changes with the outer force

    最後,應用有限元分析軟體對重要環節的導彈連接機構進行了應力分析,體現出外力變化時的內部載荷響應。
  18. Because complexity of ship structure and exterior carry loads, accurate forecast of construction strength is a very difficult mission

    由於船舶結構本身的復雜性以及外部載荷的復雜性,準確預報結構強度一直是一項非常困難的任務。
  19. All of the load is transmitted to the straining sensing tube.

    部載荷都傳遞到應變傳感管上。
  20. When the outer load increases, the deformation of skylift will have a bigger effect on stability

    當外部載荷增加時,非線性分析得出的變形結果對消防車穩定性的影響也會加大。
分享友人