配水幹管 的英文怎麼說
中文拼音 [pèishuǐgànguǎn]
配水幹管
英文
distributing main-
The newly - built projects " construction supervision system should adopt independent social form and implement the supervision of omnibearing and full process ( mainstay project, field interplant project and the supervision manufacture of equipment ), which will be favorable to the optimal achievement of the project ' s general aim, cutting down the latent danger of quality and reducing the cost of operation and management
高揚程梯級提水灌溉工程新建項目的建設監理制宜採用獨立第三方的社會監理形式,並推行從規劃設計到工程實施的全過程、全方位(主幹工程,田間配套工程,設備監造)的監理,以利於工程總體目標的最優實現,減少工程投運后的質量隱患,降低運行管理費用。According to the types, height and fireproof grade of the buildings, four basic ringed arrangements are brought up, namely the ringed arrangemensts of branch lines, the ringed arrangements of cross mains, the ringed arrangements of feed mains and the ringed arrangements of fire waterhead. on the basis of analyzing the means, characteristic and applicability of the four basic ringed arrangements, several practicality ringed arrangements are brought up, namely the ringed arrangements of branch lines and cross mains, the ringed arrangements of cross mains and feed mains, the ringed arrangements of branch lines and feed mains, the vertical ringed arrangements of feed mains and the ringed arrangements of sprinkler system in the abnormity buildings
根據建築物的類型、高度和防火等級等因素,提出配水支管環狀、配水幹管環狀、立管環狀和消防水源環狀這四種基本環狀形式,分析了四種環狀管網的環狀布置方法、特點和適用性。在此基礎上又提出了支管與干管環狀、干管與立管環狀、支管與立管環狀、立管豎向環狀以及不規則區域環狀等幾種實用的環狀形式。Based on the empirical equations used for calculating the cost of main and distribution pipes of gravity sprinkler irrigation project, equations for calculating. 4. economical hydraulic gradient, pipe length and the minimum cost of the main pipe were derived through theoretical analysis and mathematical transformation
3 .在建立的自壓噴灌工程主幹管和配水管道的造價計算經驗公式基礎上,通過理論分析和數學變換,推導得出了自壓噴灌主幹管經濟水力坡度、經濟管長和最低造價計算公式。Therefore, importance should be attached to the following aspects : introducing the market competition mechanism, optimizing the resource allocation of teaching staff, strengthening the construction of backbone teachers, reforming the authorized size management of the teaching staff and the teaching and scientific research mode, perfecting the teachers ' engagement system, intensifying the competitive mechanism, enhancing the teachers ' training to improve their comprehensive quality, improving their professional ethics, and in the meantime, improving their treatment by great efforts
為此,要應該引入市場競爭機制,優化教師資源配置;加強學科帶頭人和骨幹教師隊伍建設;改革現有教師編制管理模式和教學科研組織方式;完善教師職務聘任制,強化競爭激勵機制;強化教師培訓,全面提高教師素質;加強師德建設,提高教師職業道德水平;採取得力措施,大力改善教師待遇加強師資隊伍建設。Management system of yellow river rwtr is set up. operation mechanism is discussed which include technique precondition, rwtr management, rwtr transfer, rwtr markets and so on. the concrete method of yellow river lower reach water rights distribution is studied
對黃河基本水權和豐余水權的確定進行研究;分析了區域水權及其作用;建立了黃河取水權管理體系;探討了黃河取水權體系運作機制;從可操作性角度對黃河下游幹流取水權分配的具體方法進行了研究;探討了黃河基本水權和豐余水權的運動過程。分享友人