配水閘 的英文怎麼說

中文拼音 [pèishuǐzhá]
配水閘 英文
distributing gate
  • : Ⅰ動詞1 (兩性結合) join in marriage 2 (使動物交配) mate (animals) 3 (按適當的標準或比例加以...
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : anchor gate
  • 水閘 : water gate; water lock; penstock; dam; sluice; pen; sasse; canal-lock
  1. All sizes are standardly equipped with awwa epoxy coated, ul / fm listed osy resilient seated gate valves, cfm ( cubic feet per minute ) or gpm ( gallon per minute ) meter and ball type test cocks

    作為標準置,所有通徑美國自來廠協會( awwa )認可的環氧樹脂塗敷, ul / fm認證外閥桿軛架彈性閥座閥, cfm (立方英尺/分鐘)或gpm (加侖/分鐘)表和球型測試旋塞。
  2. The scheme embraces four projects, namely ( 1 ) to build up sluices at anqiu bridge and nanzhou bridge ( and the one at anqiu bridge is the first choice ) so that pollutants can be from entering the lake ; 2 ) as a necessary accessory for the above project, to supplement water capacity from changdang lake as a strategic water source into the protection program, and culvert - pipe plan is recommended from two other alternatives through systematic analysis ; 3 ) to carry out comprehensive realignment for some reed regions which are located at the entrances of the lake, and to develop a wetland ecosystem mainly with some reeds ; and 4 ) to set up a green protection belt right round the lake, including planting reeds at lakebeach, building forest belt, developing bases of green foodstuff and disposing sludges in the lake base

    該方案由4個工程子系統組成, ( 1 )截污工程:在岸丘橋和南州橋位置各築一節制(而岸丘橋工程又是首選工程) ,以封住湖泊兩頭入流,杜絕污染物進入源地的截污工程; ( 2 )引工程:是截污工程的套工程,利用下游長蕩湖來補充量,並對3個引工程設想進行了系統分析,推薦涵管方案,同時將長蕩湖作為該市戰略源地一併納入保護體系中; ( 3 )濕地生態處理工程:對進入蕩區前的蘆葦區進行綜合整治,發展以蘆葦為主的濕地生態處理工程; ( 4 )環湖綠色自然保護帶工程:包括建設圍湖蘆葦蕩、環湖林帶、綠色食品基地以及污泥處置。
  3. The article analyses the reasons for the main defects such as cracks, subsidence and ablations that existes in the irrigation collocation buildings such as aqueduct, clough and water fall and puts for ward some technical processing measures

    摘要文章對深史杭灌區套建築物渡槽、、跌等存在的裂縫、沉陷、沖蝕等主要癥害原因進行了分析,提出了相應的處理措施。
  4. In this paper, referring to qingju water power station, temperature control analysis and study has been done : study on the match ratio of the concrete and question of modifying of the special fine sand concrete to improve resisting ability of splitting of concrete ; study on the technology of the highly mixed fly ash to reduce the adiabatic temperature rise of concrete ; in case of the condition of resisting splitting to allow, study on the temperature control measure to strengthen and water the size of building, simplify the operational procedure, accelerate the construction speed, economize the expenses of the project

    溫控問題成為青居電站設計和施工的關鍵技術問題。 、本文對工大體積混凝土溫控問題進行了分析和總結,結合青居電站壩工程,開展溫度應力及溫度控制研究:研究混凝土的合比及特細砂混凝土『改性問題,提高混凝土的抗裂能力;研究高摻粉煤灰技術,降低混凝土的絕熱溫升:在抗裂條件允許的情況下,研究施工過程中溫控措施的簡化,以加大澆築尺寸,簡化施工程序,加快施工進度,節約工程費用。
  5. Mixture mixing : install and debug the mixing equipment before construction, take the trial mix according to the mixture ratio, and find out the turning on location of every hopper strobe as well as the relation among material flow of every kind, draw up the curve, and if there is adjustment because of factors like material batch, difference of moisture content and so on, it need to be confirmed by the laboratory so as to ensure the mixture ratio of construction meet the design requirement

    混合料拌和:施工前首先安裝、調試好拌和設備,根據確定的合比進行試拌,找出各料斗門開啟位置與各種材料流量的關系,並繪製成曲線,如因材料批次、含量不同等因素而調整,須由試驗室確定,以確保施工合比符合設計要求。
  6. It is the important research subject in sluice design and analysis currently that modeling rapidly and accurately in sluice fem analysis in condition of weak foundation, nonlinear simulation analysis of sluice and auto steel design

    軟土地基上有限元分析的快速準確建模、非線性模擬分析及自動筋設計是設計和分析中的重要研究內容。
  7. 4. beishanzhuang sluice is modeled visually and 3 - d fem simulation analyzed, and the stress and displacement rule of sluice in different fact is calculated and analyzed. the effects of different type of base plate are compared, and steel design of sluice is calculated and analyzed

    對北單莊進行了可視化建模並對其進行了三維有限元模擬計算,計算分析了各種工況下的應力和位移規律,比較了不同類型底板的效果,對進行筋計算分析。
  8. Through analysis and study, it is believed important and feasible that the implemented projects, the importing feng jia - shan reservoir into yang mao - wan reservoir and the water supply from shi tou river to xi ' an city ; form the synthetic analysis of the main factors - quantity, time, apace and user " character, it can be conferred that it is not necessary for the four projects in the western areas to join together at present ; adding gate at the 2 head of lin jiacun trench can only help to relax the problem of lack of water in bao jixia irrigation area, to solve the problem of short of water in the irrigation area needs to take project measures at the trunk and branches of wei he river from lin jia village to the upper stream ; the mode of supplying water of the four projects in the western areas are all by gravity, they can only be supplied one way and ca n ' t be supplied each other

    通過分析研究認為:已實施的引馮濟羊工程和石頭河西安供工程,是十分必要的和可行的;從資源置的主要要素? ?數量、時間、空間和用戶性質的綜合分析研究來看,西部四大工程目前尚無整體聯網的必要;林家村渠首加對解決寶雞峽塬上灌區缺僅能起到緩解作用,從根本上解決塬上灌區的缺問題,還必須從林家村以上渭河干支流上採取進一步的工程措施;西部四大工程均為重力供,只能單補,而不能互補。
分享友人