配載氣 的英文怎麼說
中文拼音 [pèizǎiqì]
配載氣
英文
make up carrier gas-
The paper mainly consider the followings : the performance parameter determination of cryopump, heat load determination and heat transfer of large cryopanel, reasonable distribution of heat load, the condition for construct steady flow in small vertical circle pipeline, balance condition for gas and liquid two - phase flow in the connection pipe between cryopanel and dewar, the safety of cryopump
文中探討了低溫泵性能參數的確定;大抽速低溫抽氣面的熱負載的確定及合理分配;冷凝面上豎直圓管內受熱建立穩定流動的條件;冷凝面與杜瓦間的連接管道內氣液「雙相流動」的平衡條件;低溫泵系統運行的安全問題。In the light of the problems of the air balance system of model lcj1250 chain drive pumping unit, it is proposed to change the air balance with counterweight balance, and three criteria for the modification is put forward : ( 1 ) ensuring the reliability of the unit with smooth operation, low noise and long life ; ( 2 ) cutting down the production cost and using less component parts as possible ; ( 3 ) carrying out modification without such main technical parameters as stroke, pumping speed and maximum polished rod load
針對lcj1250氣平衡式鏈條抽油機存在氣平衡故障率高和現場維修困難等問題,提出將氣平衡改造成工作可靠的重力平衡的方案,並確定了改造的三個原則:一是保證整機的可靠性,使抽油機運轉平穩,振動噪音小,壽命長;二是力求降低生產成本,減少零部件製造,盡可能選用原來的通用件,捨去平衡缸和空氣包等氣平衡附件,在原往返架主體上懸掛一個配重箱;三是力求不改變沖程、沖次及最大懸點載荷等主要技術參數。Abstract : in the light of the problems of the air balance system of model lcj1250 chain drive pumping unit, it is proposed to change the air balance with counterweight balance, and three criteria for the modification is put forward : ( 1 ) ensuring the reliability of the unit with smooth operation, low noise and long life ; ( 2 ) cutting down the production cost and using less component parts as possible ; ( 3 ) carrying out modification without such main technical parameters as stroke, pumping speed and maximum polished rod load
文摘:針對lcj1250氣平衡式鏈條抽油機存在氣平衡故障率高和現場維修困難等問題,提出將氣平衡改造成工作可靠的重力平衡的方案,並確定了改造的三個原則:一是保證整機的可靠性,使抽油機運轉平穩,振動噪音小,壽命長;二是力求降低生產成本,減少零部件製造,盡可能選用原來的通用件,捨去平衡缸和空氣包等氣平衡附件,在原往返架主體上懸掛一個配重箱;三是力求不改變沖程、沖次及最大懸點載荷等主要技術參數。High energy explosive was used to create a powerful and planar shock wave for accelerating flyer plate to high velocity, and high pressure was produced when flyer impacting with the sample. in the experiments, the impactor was brass and target was ofhc copper. by measuring the shock wave velocities of hr2 steel, high - density glass, aluminium alloy ( ly12 / lf6 ), magnesium - aluminium alloy ( mb2 ), polymethyl methacrylate and air, shock pressure and release isentrope of ofhc copper have been obtained
採用化爆加載、平面波發生器和空腔增壓技術,以黃銅為飛片,無氧銅為靶板,測量了抗氫鋼( hr2 ) 、重玻璃( sio _ 2 ) 、鋁合金( ly12 lf6 ) 、鎂鋁合金( mb2 ) 、有機玻璃( pmma ) 、空氣( air )和無氧銅( ofhccopper )各阻抗匹配樣品中的沖擊波速度,上述材料的hugoniot狀態參數c _ 0 、均為已知,由此確定了無氧銅的沖擊加載壓力和等熵卸載后的狀態,得到了等熵卸載路徑。( 9 ) by studying matching between catalytic converter and exhaust gas system, the conclusions having been gotten as follow : " purifying step by step and driving step by step " and " mental substrate and chinaware substrate being used in same engine " being the laying principles in exhaust gas system, which can solve the contradiction between high converting efficiency of exhaust emission and small loss of power, fuel economics, the rapid light - off and laying difficulty of catalyst
( 9 )進行了催化轉化器與排氣系統的匹配研究,對于催化劑的布置,提出了「分級凈化,逐級推動」的原則;對于載體形式的選擇,提出了「金屬載體和陶瓷載體復合」使用的原則。這樣可以良好的解訣催化轉化器與發動機匹配時,排氣污染物高凈化率與動力性經濟性損失小之間的矛盾、快速起燃和結構布置困難的矛盾。General performance requirements of electrical assembly for airborne radar
機載雷達電氣裝配通用技術要求The 705d high altitude meteorological exploring radar is a automatic vehicle - loaded radar which is very important in the attacking process of artillery
705d型高空氣象探測雷達是車載式全自動二次測風雷達,配備于炮兵防空兵氣象分隊,它在炮兵部隊的攻擊過程中,起著非常重要的作用。One does this by redistributing the aerodynamic load along the wingspan or by incorporating the vortices coming off the horizontal stabilizer
為了造成這種結果,一個辦法是沿著翼展重新分配空氣動力負載,或是設法利用機尾水平穩定翼所產生的渦流。In famous constructions and key projects such as capital international airport, sanxia three gorges hydropower project, nanjing metro subway, qingdao good - world sea palace, jinan railroad sub - bureau, suzhou amusement park, beijing 1st heating power plant, china 2nd autombile plant, xian peace villa, our products continue to operate safely
其技術性能指標達到目前國內同類產品的領先水平,其空載損耗比s11型配電變壓器的空載損耗降低60以上。同時,由於本產品採用全密封結構,絕緣油和絕緣介質不與空氣接觸,因而可在潮濕的環境中運行,是城市和農村配電網路中理想的配電設備。Using the traits of arc adjust itself of the co _ 2 welding, adopting slow - descending feature or even feature of electrical source equipping with system that delivering the welding rod at the invariable speed, then, the arc burning steadily is realized, and the quality of welding is improved
利用co _ 2氣體保護焊電弧的自身調節特性,採用緩降或平硬特性的電源配等速送絲系統,通過改變電源空載電壓來調節電弧電壓,再利用電弧電壓和熔化速度之間的關系調節焊絲熔化速度使之等於送絲速度,最終實現電弧的穩定燃燒。Voluntary inspection programme for residual current circuit breakers schneider electric ( hong kong ) ltd. recently conducted a voluntary inspection programme for its merlin gerin c60h - and square d qoe - residual current circuit breakers with overload protection ( rcbo ) which were supplied from january to december 2004
施耐德電氣(香港)有限公司近日自行檢驗一批於2004年1月至12月期間供應的梅蘭日蘭( merlingerin ) c60h -及美商實快電力( squared ) qoe -配備過載保護裝置的漏電斷路器。Article 47 the carrier shall, before and at the beginning of the voyage, exercise due diligence to make the ship seaworthy, properly man, equip and supply the ship and to make the holds, refrigerating and cool chambers and all other parts of the ship in which goods are carried, fit and safe for their reception, carriage and preservation
第四十七條承運人在船舶開航前和開航當時,應當謹慎處理,使船舶處于適航狀態,妥善配備船員、裝備船舶和配備供應品,並使貨艙、冷藏艙、冷氣和其他載貨處所適于並能安全收受、載運和保管貨物。The carrier shall, before and at the beginning of the voyage, exercise due diligence to make the ship seaworthy, properly man, equip and supply the ship and to make the holds, refrigerating and cool chambers and all other parts of the ship in which goods are carried, fit and safe for their reception, carriage and preservation
承運人在開航前和開航時,應當謹慎處理,使船舶處于適航狀態,妥善配備船員、裝備船舶和配備供應品,並使貨艙、冷藏艙、冷氣艙和其他載貨處所適于並能安全收受、載運和保管貨物。Fire protection, and surveillabce works as follows : electrical : 22. 8kv ; 27, 800kva ; three loading centers located in the power house, factory, and office building ; generator 2 800kw
電氣: 22 . 8kv供電設備容量三處負載及配電中心分佈於動力室與廠房發電機容量2800kw ,供緊急負載使用本配電系統處使用數字式電驛及電表,符臺現代化之電力監控新潮流。The thing flows the trolley name carrying trolley ; the surface uses the electricity to galvanize, the contour artisticly, the service life is long ; attaches the security leather belt, the fixed link loading and unloading speed is quick, both is advantageous for the mechanized transporting, and is suitable for the short distance the manual shift, may realize the plan production, saves the manpower, reduces the cost ; with thing and so on turnover box flows the vessel coordination use, may realize the modular management, the setting at space is big, folds the collection not to occupy the space ; is suitable the thing flows the transporting in the enterprise working procedure ; also may or allocates and dispatches the center in the factory to install the cargo to transport to the store, a direct achievement commodity goods part
物流臺車又稱載物臺車;表面採用電氣鍍鋅、外形美觀、使用壽命長;附安全皮帶、固定桿裝卸速度快,既便於機械化搬運,又宜於短距離的人力移動,可實現規劃生產,節省人力,降低成本;與周轉箱等物流容器配合使用,可實現單元化管理,置物空間大,折疊收藏不佔空間;適用於企業工序間的物流搬運;也可在工廠或配送中心裝上貨物運到商店,直接作為商品貨架的一部分。Standard test method for glazing and glazing systems subject to airblast loadings
強氣流荷載下門窗玻璃和玻璃裝配系統的標準試驗方法Based on the fast ethernet technology standards, the hardware platform integrates the field analysis facilities, the water quality detecting facilities, boat carried gps and hydrometeorological facilities to a fast boat carried entironment monitoring system. the system realizes the auto collection, pretreatment and distribution of the sample of the marine water, the field collecting, distill, analysis and storage of the monitoring data and sending of the data to land supporting system to finish the producing and rele ase of the information product
該硬體平臺採用符合internet intranet技術標準的交換式快速以太網技術和星型連接拓撲結構建設船載局域網路,支持局域網上10mbps的數據傳輸速度,將現場分析儀器、水質檢測設備、船載gps以及水文氣象等設備集成為一個船載海洋生態環境快速監測系統,實現樣品的自動採集、預處理與分配,以及監測數據的現場收集、提取、分析處理與存儲,同時將監測數據實時傳回地面支持系統進行信息產品製作和發布。Research on automatic management of aircraft electrical power automatic distribution system
飛機自動配電管理系統電氣負載管理技術的研究The effect of girth weld strength match on the limit load and fracture resistance of high - grade, large diameter pipelines was analyzed with failure analysis diagram ( fad ) method
摘要採用失效評定圖技術分析了油氣長輸管道特別是高強度大口徑管道環焊縫不同強度匹配形式對管道極限承載能力以及抗斷性能的影響。Effect of girth weld strength match on limit load and fracture resistance of high strength, large diameter pipelines steel is analyzed with fad ( failure analysis diagram ) method
摘要採用失效評定圖技術分析了油氣長輸管道中高強度管?鋼大口徑管道環焊縫不同強度匹配形式對管道極度限承載能力以及抗斷性能的影響。分享友人