重力鋪裝 的英文怎麼說
中文拼音 [zhònglìpūzhuāng]
重力鋪裝
英文
gravity spread forming- 重 : 重Ⅰ名詞(重量; 分量) weight Ⅱ動詞(重視) lay [place put] stress on; place value upon; attach im...
- 力 : Ⅰ名1 (力量; 能力) power; strength; ability; capacity 2 [物理學] (改變物體運動狀態的作用) forc...
- 鋪 : 鋪名詞1. (鋪子; 商店) shop; store 2. (用板子搭的床) plank bed3. (舊時的驛站, 現多用於地名) post (often used in place names)
- 裝 : Ⅰ名詞1 (服裝) dress; outfit; attire; clothing 2 (演員的化裝品) stage makeup and costume Ⅱ動詞...
- 重力 : [力學] gravity; force of gravity; gravity force; power of gravity; pull of gravity; gravitational...
-
Changes in strand tension can be easily determined if the bridge deck is resurfaced.
當橋面重新鋪裝時,易於確定鋼索內拉力的變化情況。Electrical reinforcement and rewiring programme
加強供電及重鋪電力裝置計劃During the 3d finite element calculation, try to simulate different procedure of the construction ( like sunk well in - filling, main cable erection, box girder hoist, bridge flooring and opening to traffic ). and then, reveal the regulation of deformation and displacement on the foundation and soil during different period. after got these, this thesis put great attention on the analysis of the reason which cause the horizontal displacement of the cable saddle, as well as the regulation of the pressure ' s changing in the soil located on the front side of the sunk well foundation
在三維有限元計算中,對不同工況(沉井充填、錨體澆築、主纜架設、箱梁吊裝、橋面鋪裝以及通車運營)下的施工過程作了模擬,全面揭示了各工況下錨碇沉井基礎與地基土的變形變位規律,著重分析了影響散索鞍水平位移的因素以及不同工況下沉井前測地基土水平向抗力變化規律,並提出了不同深度地基土水平向抗力與水平位移間的擬合關系。Earth - moving machinery. lift capacity of pipelayers and wheeled tractors or loaders equipped with side boom
土方機械.裝有側起重臂的鋪管機輪式拖拉機和裝卸機的提升能力This type of cable tray is good for cables with larger diameter used for high or low voltage application, is light weight, low cost and easy to assemble yet, it has better heat dissiopation
梯級式玻璃鋼橋架用於直徑較大電纜的鋪設,最適合高、低壓動力電纜的鋪設,重量輕,成本低,安裝方便,散熱和透氣性好是其最大的特點。分享友人