重回電壓 的英文怎麼說

中文拼音 [zhònghuídiàn]
重回電壓 英文
revovery voltage
  • : 重Ⅰ名詞(重量; 分量) weight Ⅱ動詞(重視) lay [place put] stress on; place value upon; attach im...
  • : 回構詞成分。
  • : Ⅰ名詞1 (有電荷存在和電荷變化的現象) electricity 2 (電報) telegram; cable Ⅱ動詞1 (觸電) give...
  • : 壓構詞成分。
  • 重回 : again
  • 電壓 : voltage; electric tension; electric voltage
  1. Apply computer chip to control the circuit ; omron opto - elecrtonic control - ler and panasonic and mitsubishi inverter have stable performance, high precision, rapid reaction and long life - span ; the controlling plate applies tactile operation board which is handled easily ; vertical structural screen is easy to adjust the vertical printing pressure so as to ensure the quality of printing ; the frame lift is driven by electrical motor and installed with imported linear guide rails, of which the speed - adjust device, scraper and scraping blade can be adjusted within15 to 45 and can be set for many times so as to repeatedly printing with good precision and output, the flat bed is made of 2mm stain - less steel plates which are flat, smooth and indeformable ; it is also equiped with micromatic setting device in order to ensure the precision of multi - color overprint and auto air - intake device to ensure strong adsorption

    採用腦板控制路,歐姆龍光控制器,松下,三菱變頻器,行直穩定.精度高,反應快,壽命長,控制面板採用觸摸式操作面板,操作方便,六式結構型網版垂直升降印刷力可調保證印刷質量,機架升降採用機驅動安裝進口直線導軌,刮刀、墨刀可在15一45角調整,可設置多次,復印刷保證產品精度.平臺板採用2毫米不銹鋼板製作,平整光滑不變形配有微調裝置,確保多色套印精度,配自動吸氣裝置,確保強有力的吸附。
  2. Application of caving mining technology with bottom under condition of flat dipping mid - thick body and unstable rock caused the most of trench and bottom drift, located in abutment, to be destroyed and low recovery in south area, xishimen iron mine

    摘要在緩傾斜中厚礦體底板巖性不穩固的條件下,採用有底柱崩落法,由於耙道大多處于空區邊部應力集中的部位,致使塹溝及底部結構巷道破壞嚴而使收率極低,採用無底柱崩落卸則可有效解決上述難題。
  3. Firstly, the thesis briefly reviews the history of voltage and reactive power control technology, focusing on the defects of the equipment in use. then, with the theoretical analysis and the discussion on voltage and the characteristic of power system as well as the basic principle of voltage and reactive power control, the thesis makes a research on the character of voltage and reactive power control and interprets the controlling regularity of substation. in addition, with the consideration of the changes of transformer tips and the combined influence of capacity groups and reactive power and voltage, the thesis makes adjustment suggestion to the different operating - zones of voltage and reactive power

    本文從降低網損和提高變站自動化水平著眼,對變無功控制應用方面的問題進行了研究,本文首先簡要無功控制的發展概況,著指出了現有無功控制裝置的缺陷;通過理論分析,在討論力系統、無功調節特點以及無功總體控制原則的基礎上討論了變、無功控制特性以及控制原理,給出了變無功的控制規律;考慮了變器分接頭的變化及容器組的投切對無功和的綜合影響,針對、無功的各種運行控制區域給出了相應調節策略。
  4. The second chapter simply introduces the development of alternate asynchronous inverter technology and retrospects some types of energy - saving systems for hydraulic elevators. then the working principles of the project are discussed and analyzed at four different working status, i. e. light load upwards, heavy load upwards, light load downwards and heavy load downwards. and the chapter focus on the introduction of structure design of pump station, calculation and type selection of pump / motor reversible units, research on oil leakage principles of accumulator circuit, design of accumulator - pump / motor pressure - energy transformer and integrated valve blocks, etc. the last but not the least, the electrical wiring of vector inverter control cabin and design of computer control and data acquisition system are introduced

    論文第二章首先簡單介紹了交流異步動機變頻調速技術的發展概況,在梯液控制系統節能技術的基礎上,介紹了本課題研製的「採用蓄能器的液梯變頻節能控制系統研究」的基本原理,分析了動力系統在梯轎廂輕載上下行、載上下行等四種典型工況下的基本工作狀態和工作方式;詳細地介紹了本課題節能系統液動力泵站的結構設計和參數設計,點研究了液動力泵站的結構設計、液泵馬達可逆性問題及其選型設計計算、蓄能器迴路泄漏油損失機理的研究及其補償裝置的設計、蓄能器-泵馬達力能量轉換裝置的設計、多功能集成控制閥組的設計等內容;最後簡單介紹了本課題矢量控制變頻控制櫃的外部附件氣接線、計算機控制及數據採集系統的硬體設計等內容。
  5. Analyze item by item the position of unintact cycle, the running clearance of unintact cycle, locking - deform, datum dimension regulating, repeatly install, power voltage wave and marking running etc. at the same time, we give the calculating formula to calculating the running marking random error, and use it to calculate the system error of big diameter measure instrument - - datum dimension frame error, gyro - wheel diameter error, error caused by circumstance temperature, error caused by backing distance, angle error, delay error of data collecting circuit, lathe main shaft running error, workpiece install partial error

    對不完整圓的位置、不完整圓的轉動間隙、鎖緊變形、基準尺調整、復安裝、波動、標記轉動等隨機誤差進行了逐項分析,並給出轉動標記隨機誤差的計算公式。對大直徑測量儀的系統誤差?基準尺尺架誤差、滾輪直徑誤差、環境溫度引起的誤差、後退距離引起的誤差、角度誤差、數據採集路延時誤差、車床主軸轉誤差、工件安裝偏心誤差分別進行了計算,最後對誤差進行合成。
  6. Jdy - 280b double electromagnetic lock product characteristic : strong holding force, no left magnet easily installed, low noise, durable no mechanical failure with signal feed back function applications : can be used with intercoms and access control systems, especially for fireproof door working voltage : 12vdc 24vdc working current : 12vdc 0. 27a, 24vdc 0. 46a power consumption : 3. 3w, 3. 5w, absolutely insulative power supply mode : successively working temperature : - 40 50 dimension : 473 x 45 x 30mm weight : 3920g yiwu qimingxing computer company copy right

    Jdy - 280b雙開門磁力鎖產品特性:吸力強無剩磁安裝方便噪音低壽命長具故障保護功能,無機械故障可具資訊饋功能鎖狀態有指示燈指示:鎖門時綠燈指示燈亮開門時,紅色指示燈亮帶鎖狀態指示燈及聯網信號輸出適用范圍:可與樓宇對講門禁系統配套使用特別適用於逃生門防火門氣性能:氣性能:使用: 12vdc 24vdc流: 12vdc 0 . 53a 24vdc 0 . 27a絕緣阻測試: dc500v 1分鐘無擊穿通形式連續使用溫度: 40 50外形尺寸: 473 x 45 x 30mm量: 3920g
  7. The results show that the elastic membrane thickness, actuator span and gap spacing have a strong effect on the deflection, the actuator undergoes the deflection increasing nonlinearly at voltages below pull - in voltage and snap through instability at voltages above pull - in voltage when subjected to a voltage ramp, the re - set time and repeatability are attractive when the actuated voltage is set to zero

    結果表明,驅動器的彈性薄板厚度、跨度和極間距明顯影響變形位移;驅動器的變形位移隨驅動的增加出現穩定的非線性增加和不穩定的「拉入」現象;驅動撤除后鏡面復時間短,復性好。
  8. To test the time parameter, namely, is to test the operate time, release time and bounce time when the relay ' s winding is put or removed the rated voltage. these parameters ( especially the bounce time ) are very essential to relay ' s rated load

    檢測時間參數的目的是檢查繼器在線圈施加或切除額定時的動作、釋放、跳及穩定時間,這些參數(特別是觸點跳及穩定時間)對繼器通過額定負載是很要的。
  9. Chapter one introduces the recent development of usb2. 0 and the overall architecture of transceiver interface ; chapter two proposes the design flow and design style ; chapter three presents the whole system and module partition ; chapter four emphasizes on the dual - mode transmitter circuit, and gives out the simulation waveforms ; chapter five focuses on the design of over - sampling receiver and dll ( delay locked loop ) module ; chapter six designs the band - gap reference circuit. in the end, it concludes the design, and estimates the trend of usb. the dissertation is emphasized on dual - mode transmitter architecture, implementation of high speed dll using dba ( digital - based analog ) technology and a new design methodology for complex digital modules in mixed - signal circuit

    本文第一章介紹了usb2 . 0的發展現狀和收發器介面晶元系統;第二章介紹了該晶元的設計流程和風格;第三章介紹了該介面晶元的總體構架以及模塊劃分;第四章著介紹雙模發送器路設計並給出了模擬驗證波形;接下來第五章分析了過采樣接收器的設計並對其中的dll ( delaylockedloop )模塊設計進行了詳細的分析;第六章介紹了本晶元內置的基準源的設計;最後對本文的設計一個總的顧和總結,並展望下一代usb的發展方向。
分享友人