重聯運行試驗 的英文怎麼說

中文拼音 [zhòngliányùnhángshìyàn]
重聯運行試驗 英文
test on coupled operation
  • : 重Ⅰ名詞(重量; 分量) weight Ⅱ動詞(重視) lay [place put] stress on; place value upon; attach im...
  • : Ⅰ動詞(聯結; 聯合) unite; join Ⅱ名詞(對聯) antithetical couplet
  • : Ⅰ動詞1 (物體位置不斷變化) move; revolve 2 (搬運; 運輸) carry; transport 3 (運用) use; wield...
  • : 行Ⅰ名詞1 (行列) line; row 2 (排行) seniority among brothers and sisters:你行幾? 我行三。where...
  • : 名詞(古代占卜用的器具) astrolabe
  • : 動詞1. (察看; 查考) examine; check; test 2. (產生預期的效果) prove effective; produce the expected result
  • 運行 : move; be in motion; run; working; machine run; operation; corotation; propulsion (影片)
  • 試驗 : trial; experiment; test
  1. In accordance with some wolfram - tin effuse come from cleaner in aconcentrating mill, this study adopt vibrate dslimes shaking table combining with centrifugal separator to put up a roughers. tousegravity - flotation and magnetic con - centration as combined proces s of technology, succeed in solving a problem of multipurpose returning in wolfram - tinslimes

    針對某選廠廢棄的鎢錫精選溢流進了選礦研究,採用振動礦泥搖床與離心機組合粗選,選浮選磁選(水冶)合工藝流程,有效地解決了鎢錫細泥綜合回收問題。
  2. 5 a multi - thread software cooperated with smp ( 2 cpu ) hardware performs the image - preprocessing correlation and post - processing synchronously, thus an automatic working module is realized. 6 systematic designed software, including grabing sarnies constructing rfl diging roi, and trainning ann offline and inline modules, has passed the practical tests which indicates that the opr could reach the recogniton possibility above 85 % and decrease the false alarm in the environment of high noise low contrast and multi - objects. and these are proved stable and repeatable in statistics, and so an advanced progress toward practical systems is achieved

    6 、系統化設計的軟體,包括了樣本採集、參考濾波器庫構成、相關平面的roi採集,以及ann脫機訓練、 ann的軟體功能模塊,在實時的測結果中表明了該opr系統對處于高噪聲、低反差、多目標的惡劣條件下,對三維畸變目標的判識率( > 85 % ) ,降低了虛警率,並通過大量的實數據證明了該系統各項指標的穩定性和可復性(從統計意義上講) ,向實用系統邁進了一大步。
  3. Answer : preparative job includes : understands workplace one, the moving circumstance of 2 equipment, this job has with moving equipment without direct connection, have the job that cooperates without need with other team and group ; makes working priority discipline and the blemish that prepare to solve and weak point ; the staff member makes clear to divide the work and be familiar with the concerned data such as blueprint and test gauge cheng ; should be had the blueprint that agrees with actual state, record that examines last, newest rectify spare parts of the instrument that decides requisition, test gauge cheng, qualification, machine parts or tools kept in reserve, tool and join lead to wait ; is a few righter important equipment, especially complex protector or couplet jumps loop protector, should weave test program, working controller should fill in ticket of protection safety precaution, examine and approve via technical chief, just can carry out

    答:預備的工作包括:了解工作地點一、二次設備的情況,本工作與設備有無直接系,與其他班組有無需要配合的工作;制定工作點項目及預備解決的缺陷和薄弱環節;工作人員明確分工並熟悉圖紙與檢規程等有關資料;應具備與實際狀況一致的圖紙、上次檢的記錄、最新整定通知單、檢規程、合格的儀器、備品備件、工具和連接導線等;對一些要設備,非凡是復雜保護裝置或有跳迴路保護裝置,應編制方案,工作負責人應填寫繼電保護安全措施票,並經技術負責人審批,方能實施。
  4. To bj1027 pick up, for former - brind " generally great change augmenting tyre " landscape - orientation - mete, then result tyre leaning - grind. through plentiful market researching, correlative examination, data stat analyse, theory calculating and the same products and car comparating, we make clear the relation and the movement connection in suspend, veer and tyre, confirm again veer trapezia - cut - point, and adopt a series of measures, resovle tyre leaning - grind completely, elevate the whole track " capability

    我們通過大量的市場調查、相關的檢測與、數據的統計分析、理論分析計算,並對比同類產品及轎車進分析研究,弄清了懸架、轉向與輪胎之間的相互系與動關系,新確定了轉向梯形斷開點的位置,並相應採取了一系列措施,徹底解決了輪胎偏磨這一問題,使整車性能得到了明顯提高。
分享友人