重鋪路面工程 的英文怎麼說

中文拼音 [zhòngmiàngōngchéng]
重鋪路面工程 英文
road resurfacing works
  • : 重Ⅰ名詞(重量; 分量) weight Ⅱ動詞(重視) lay [place put] stress on; place value upon; attach im...
  • : 鋪名詞1. (鋪子; 商店) shop; store 2. (用板子搭的床) plank bed3. (舊時的驛站, 現多用於地名) post (often used in place names)
  • : 1 (道路) road; way; path 2 (路程) journey; distance 3 (途徑; 門路) way; means 4 (條理) se...
  • : Ⅰ名詞1 (頭的前部; 臉) face 2 (物體的表面) surface; top 3 (外露的一層或正面) outside; the ri...
  • : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
  • : 名詞1 (規章; 法式) rule; regulation 2 (進度; 程序) order; procedure 3 (路途; 一段路) journe...
  • 重鋪 : relaying
  • 路面 : road surface; pavement; roadbed路面板 road deck; roadway slab; 路面標高 grade elevation; 路面標線...
  1. There are many factors which contribute to the uneven surface of precast paving slabs. this may be due to the heavy loading caused by illegal parking of vehicles on the footway ; improper construction methods and substandard reinstatement works after road excavation

    (二)導致預制磚表凹凸不平的因素很多,包括在行人上違例泊車,以致負荷過砌方法不當;以及掘后進行的修復不合標準等。
  2. At about 4 am, the first lane and second lane of lantau link before the toll plaza were closed for roadwork. a private car driven by a 42 - year - old man was travelling along lantau link towards the airport and reportedly rammed the rear part of a truck parking on the first lane before the toll plaza to direct traffic

    早上約四時,青嶼干線近收費亭前的第一及第二行車線正進行重鋪路面工程,一輛由一名四十二歲男子駕駛的私家車沿青嶼干線行駛,該輛私家車到達收費亭前據報撞向一輛停泊在第一線指揮交通的車。
  3. Half of the roads are borderline cases and will need frequent re - surfacing, but once all 72 road sections are re - paved, 40 000 flats will benefit

    上述的72段道中,約半數屬于邊緣個案,日後必須經常。然而以後,全港將有4萬個住宅單位受惠。
  4. Half of the roads are borderline cases and will need frequent re - surfacing, but once all 72 road sections are re - paved, 40 000 flats will have benefited

    上述的72段道中,約半數屬于邊緣個案,日後必須經常。然而以後,全港將有四萬個住宅單位受惠。
  5. Road resurfacing works

    重鋪路面工程
  6. Two directors and a foreman of a road maintenance company were sentenced to jail terms ranging from two years and three months to three years for conspiring to defraud the highways department in relation to road resurfacing works

    兩名維修公司董事及一名管,在進行重鋪路面工程中,串謀以假土芯樣本詐騙政署,被判入獄兩年三個月至三年。
  7. Extruded concrete curb technology was introduced in 20th congress icold held in beijing in year 2000, this method draw more attention for its improving the compaction of transition material, excellent performance of slope protection, and convenient construction. this extruded concrete curb technology was developed in ita dam construction in brazil, the ita method consists of building and extruded concrete curb by using an extruding machine before the construction of a layer of the transition material, then spread and level the transition material in layers inside the curb, and compact the layer by vib ' ratory roller horizontally

    巴西界在埃塔( ita )板堆石壩建設中,借鑒道園林中道沿機的擠壓滑模原理,創造性使用邊墻施法,在每填築一層墊層料之前,用擠壓式邊墻機製作出一個半透水混凝土小墻,然後在其內側按設計填壩料,用振動碾平碾壓,合格后復以上序。
  8. Based on understanding of many practices of asphalt overlay on old cement concrete pavement in our country and rehabilitation of boai road in zhongshan city, this paper analyzes and studies the rehabilitation technology of old cement concrete pavement systematically, includes : ( 1 ) the assessment for structure characteristic of old cement concrete pavement a correct assessment for pavement distress and structure characteristic of old cement concrete pavement before overlay is the stick point of preventing reflection cracking and guarantee the success of rehabilitation, which requires understanding how the structure characteristic of old pavement effects the stress and reflection cracking of the asphalt overlay

    本文在調查了解國內許多舊改造實踐的前提下,基於中山市博愛一的改造實踐,對舊水泥混凝土瀝青罩改造進行了系統的分析研究。主要的研究內容包括: ( 1 )原有結構性能的評估在瀝青混凝土加之前對舊水泥混凝土的損壞情況和結構狀況進行正確的評價是解決反射裂縫和保證加罩成功至關要的一環,其前提就是要了解舊水泥混凝土的結構特性對瀝青罩層中的應力和反射裂縫的影響。
  9. Motorists are advised that to facilitate road resurfacing works, with effect from

    駕駛人士請注意,為配合進行,由
  10. Temporary lane closure of victoria park road eastbound for road realignment and resurfacing works

    為配合置行車線
  11. Motorists are advised that in order to facilitate road resurfacing works, traffic lanes on fanling highway

    駕駛人士請注意,為配合進行
  12. Members of the public are advised that in order to facilitate road resurfacing works, traffic lanes on the section of po heung street northbound between po yick street and tai po tai wo road near luk heung san tsuen public school in tai po will be temporarily closed on 5 and 6 march 2007 as follows

    請注意,為配合進行,大埔寶鄉街介乎普益街與大埔太和之間近六鄉新村公立學校的一段北行線的部份行車線,將于
分享友人