量水建築物 的英文怎麼說
中文拼音 [liángshuǐjiànwù]
量水建築物
英文
water measuring structure- 量 : 量動1. (度量) measure 2. (估量) estimate; size up
- 水 : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
- 建 : Ⅰ動詞1 (建築) build; construct; erect 2 (建立; 設立; 成立) establish; set up; found 3 (提出;...
- 築 : 築名詞(貴陽的別稱) another name for guiyang
- 物 : 名詞1 (東西) thing; matter; object 2 (指自己以外的人或與己相對的環境) other people; the outsi...
-
1 sedimentation anyslys of soil under the action of deadweight ; 2 sedimentation anyslys of structure in using ; 3 endogen force anyslys of structure in using ; 4 soil remolding type anyslys ; 5 homogenous flush works anyslys ; 6 anyslys of the structure sedimentation effects of different flushing amount at the same place ; 7 anyslys of the structure sedimentation effects of different flushing places ; 8 anyslys of the structure sedimentation effects of different horizontal flushing places ; 9 anyslys of the structure sedimentation effects of different vertical flushing places ; getting the different between the endogen force of common structure and that of slant structure. the rule of stricture sedimentation and the effect of different soil remolding type were also gained
對掏土糾偏過程做了以下9個方面的分析: 1 、土體在自重作用下的沉降分析; 2 、建築物在使用階段的沉降分析; 3 、建築物在使用階段的內力分析; 4 、土體受擾動類型分析; 5 、均勻沖水施工過程分析; 6 、同一個地方沖水量大小不同對建築物沉降影響分析; 7 、不同沉井沖水對建築物沉降影響分析; 8 、進深不同的土層沖水對建築物沉降影響分析; 9 、不同埋深土體沖水對建築物沉降影響分析。Ideal for homeowners or small businesses needing small quantities of hot water or for remote baths in outbuildings
希望少量熱水或在附屬建築物里享受熱水的、家庭用戶或小企業的理想選擇。In this paper, the finite - element numerical analysis calculation is applied to the foundation of high - rise and multi - floor building and the evolvement law of stress and displacement of tunnel used by urban traffic to explore the mutual influence between the wall rock of underground space and high - rise building foundation, taking account of the specific construction situation in the " sanmu garden " project in dadukou district in chongqing, from the perspective of underground space static - force structure stability analysis to open a underground tunnel with 6m in span and 7. 5m in height for track traffic 20m below the surface. this paper, taking considerations of three different states, i. e. the natural state without any artificial interference, the state of high - rise buildings on the surface, and the underground tunnel state with excavation for track traffic, and four plane lines and four vertical lines, analyzes and studies the distributing law of stress and displacement of calculation section from the following aspects : ( 1 ) the main stress vectorgraph, displacement distribution graph ( ux, uy ) and chromatogram graph of stress isoline ( 1, 2, xy ) of section under different states ; ( 2 ) the contrastive distribution curve of stress ( 1, 2, xy ) of different plane and vertical lines under the same state ; ( 3 ) the contrastive distribution curve of stress ( 1, 2, xy ) of the same plane and vertical lines under different states, wishing to provide references for underground space utilization and project designing and construction of the tunnel under high - rise buildings in the future
本文結合重慶市大渡口區「三木花園」開發建設項目,從地下空間靜力結構穩定性分析角度出發,針對在該項目中涉及的高層和多層建築物以及在其地下20米處開挖了一個用於軌道交通的跨度6米,高7 . 5米的地下隧道這一具體工程情況,採用2d - 3d -有限元結構分析程序對高層與多層建築物的地基基礎及其與城市軌道交通使用的地下隧道圍巖的應力與位移演變規律進行了有限元數值分析計算,探索了地下空間圍巖與高層或多層建築物地基基礎之間的相互影響,通過考慮未受到任何人為擾動影響的天然狀態、地表存在多層或高層建築物狀態和地下開挖用於軌道交通的地下隧道狀態等三種不同狀態以及4個水平剖線和4個垂直剖線等不同情況,從以下幾個方面具體分析研究了計算斷面的應力與位移分佈規律: ( 1 )在各種不同狀態下計算斷面的主應力矢量圖、位移分布圖( ux 、 uy )以及應力等值線色譜圖( _ 1 、 _ 2 、 _ ( xy ) )等; ( 2 )相同狀態下不同水平與垂直剖線的應力_ 1 、 _ 2和_ ( xy )對比分佈曲線; ( 3 )不同狀態下相同水平或垂直剖線的應力_ 1 、 _ 2和_ ( xy )的對比分佈曲線等,為今後在對地下空間的開發利用以及在高層建築物地下開挖硐室時的工程設計和工程施工提供參考依據。To avoid manual labor of chiseling - grossness, in the area of second - stage concrete construction, permanently non - removed metal molding boards nets are used as molding boards of first - stage concrete. substitution joints of reinforcing steel bars for traditional electric welding and usage of equipments for joints of reinforcing steel bars efficiently improve strength of junctions and rate of connecting reinforcing steel bars, and safety of construction and stability of quality, and greatly reduce cost. it ' s possible that three gorges project become top - ranking project in the world by study on systems engineering of high - strength concrete construction
混凝土縫面處理採用高壓水流沖毛技術,大大提高了施工工效,減少了倉面污染;模板工程大量採用定型鋼模板施工技術,提高了壩體混凝土成型質量和工程進度;在二期混凝土施工區域,為免除人工鑿毛勞動強度,採用永久性免拆金屬模板網作為一期混凝土模板;鋼筋連接改進傳統的電焊連接方式,採用大量採用鋼筋接頭機械連接技術,有效提高了接頭強度和鋼筋連接速度,施工安全性大大加強,質量穩定性有效提高,經濟成本大大降低;三峽二期工程持續高強度混凝土施工系統工程的研究,使三峽工程成為名符其實的「世界一流工程」成為可能;三峽二期工程混凝土溫控綜合技術的應用,有效降低了壩體混凝土溫度的產生;混凝土表面處理及裂縫處理技術的應用,提高了建築物的整體性和耐久性。The recommendations assume that, in the aftermath of major hurricanes or floods, buildings wet for > 48 hours will generally support visible and extensive mold growth and should be remediated, and excessive exposure to mold - contaminated materials can cause adverse health effects in susceptible persons regardless of the type of mold or the extent of contamination
建議假設在颶風及水災之後,建築物浸泡於水中超過48小時,將會滋生許多?菌,應進行公共衛生介入,且大量暴露于?菌污染的物質,不論?菌的類型或污染程度,對較敏感的人可能造成健康危害。Moreover, there are drawbacks like difficulties in stimulation, complexity of calculation and heavy work in all these models because of many other factors. for example, the complexity of the dam structure, difficulties in measuring the physical and mechanical parameters of building materials and subgrade soil, stimulating the geologic structure of subgrade, predicting effects of loads, construction and environment on the dam and so on
此外,由於大壩結構復雜,建築材料和地基巖土的物理力學指標難以測定,復雜地基的地質構造還很難模擬,荷載、施工及環境因素對水工建築物的影響還很難準確預測,應用各種模型都存在著模擬困難、計算復雜、工作量大等不足。Abstract : through a series of hydraulic model tests for researching actual power tunnel operation, a conclusion is reached that in order to get a better flow pattern the profile of the wate - carrying structure should be adapted to the variation of water streamline shrinkage, flow velocity and pressure intensity. the configuration and dimension of the kinetic energy dissipator should be selected carefully to make the water tunnel safe and reliable at different levels of diversion dischage
文摘:針對實際工程中的發電引水隧洞運行的各種工況進行了水工模型試驗研究,指明要獲得良好的水流流態,過水建築物各部位結構輪廓的造型應適應水流流線的收縮、流速及壓強的變化;為使引水隧洞在各級引水流量下能安全可靠地運行,需慎重確定洞內消能工的體形和尺寸。Water conditioning equipment inside buildings - chemical dosing systems - pre - set dosing systems - requirements for performance, safety and testing ; german version en 14812 : 2005
建築物內水調節設備.化學藥品劑量.預調劑量系統.性能The calculation measures of obstructions " parameters deals with many hydrotechnic buildings and refers to many latest national standards and achievements in scientific research
礙航物通航參數的計算方法涉及到了較多的水工建築物,計算方法參考了大量的最新國家標準或科研成果。This dissertation analyzes the characteristics of hydrotechnic obstructions. and it uses the achievement in scientific research there have been and the standards there have been issued, chooses the appropriate contents and the appropriate objects to study. form the analysis, the dissertation evaluates the water traffic safety degrees effected by hydrotechnic obstructions, makes the main indexes that effect obstructions degree quantificationally, finds out the optimal using state for navigation resources
論文從分析內河水工礙航物礙航特性出發,借鑒國內已有的科研成果或已頒布的標準,擇其合適的內容,選擇合適的對象進行研究,分析、評價、認定水工礙航物對水上通航安全的影響程度,將判斷水工礙航物礙航程度的主要指標量化,尋求通航資源的最佳利用狀態,使水工建築物的規模在滿足航運發展的前提下得到合理控制。The paper analyzes the non - lineal relations of the quantity of heat exchange and water flux of coil exchanger in part - load operating condition, the shortage of deciding the water flux in bypass pipe, the disadvantage that the operating condition of pumps and chiller ca n ' t be met with the load change of the air conditioning system in different operating condition of using pressure - difference bypassing control in primary water pump system. using load control method in the change of the operating condition of primary water pump system can realize that the load change is small and reasonable in the on / off condition of pumps and m m chiller by comparing load control method in primary variable - flow water pump system with pressure - difference bypassing control method, back water temperature control method
本論文從目前空調工程中使用的變流量水系統入手,研究了盤管換熱器在部分負荷下水流量與換熱量的非線性關系,分析了文獻中介紹的旁通管通流能力選擇的不足之處和一次泵水系統採用壓差旁通控制時,工況轉換不能滿足系統控制要求的缺陷;比較了一次泵變流量水系統中壓差旁通控製法、回水溫度控製法、負荷控製法的精確性,並得出了在一次泵水系統的工況轉換時,採用負荷控製法能使冷水機組及其相應水泵在啟停時的負荷變化范圍較小,更符合建築物的冷量需求,節能效果較好的結論。In this paper, we study the most serious damming section of the east - one main canal, which is from the entrance of the hao wan flume ( chainage12 + 123. 6 ) to the exit of shang tian yuan tunnel ( chainage24 + 091. 1 ). the main content is analyzing the flow characteristic of the canal, setting up mathematical model of the discharge condition of the east - one main canal, according to the survey section and actual roughness factors, building, bend and so on, we divided the canal into more than loocaculation segments. each segment is calculated by microsoft excel electrical table through computer as permanent transition flow of non - prismatic channel
本論文研究的渠段為陸渾灌區東一乾渠壅水最為嚴重的渠段,從郝灣渡槽進口(樁號12 + 123 . 6 )至上天院隧洞出口(樁號24 + 091 . 1 ) ,其主要內容是,分析渠道水流特徵,建立東一乾渠輸水狀況的數學模型,根據測量斷面及實際糙率、建築物、彎道等因素的不同,將渠道劃分成120多個計算段,每段按非稜柱體恆定漸變流,運用microsoftexcel電子表格進行編程計算。Evaluation of hydraulic structure appearance quality
水工建築物外觀質量評定The presentation quality control of the hydraulic structures
水工建築物的外觀質量控制By analyzing risk sources and those uncertain factors affecting the risk, the diversion risk is defined as the probability of the maximum discharge after being adjusted and held higher than the maximum design flood
通過對導流風險來源和引起導流風險的各種不確定性因素的論述和分析,把施工導流風險定義為天然來(洪)水經過調蓄后,導流泄水建築物的最大泄水流量超過其設計最大泄水能力的概率。The comparative analysis is made firstly, which shows that the truss arch aqueduct can be built on the weak foundation and is also satisfied with the demand for large span length and the great discharge ability, so the type of aqueduct is a better for the project. then the finite element program ( super sap93 ) is applied to the structural analysis of the space structure
首先通過對常用渡槽結構型式的對比分析,闡明該渡槽是一種可在軟弱地基上修建的、能滿足大跨度、大流量要求、適用於南水北調中線工程的排水建築物,然後運用有限元分析程序supersap93對桁架拱空間結構進行了受力分析。The horizontal swirling flow internal dissipater tunnel being built in gongboxia power station will be the first one reconstructed from a diversion tunnel whose discharge reaches to 1000m vs and water head is more than 100m in china. its scheme ' s argumentation, test research and future apply will have important meanings to the design. research and engineering application of internal dissipation discharge tunnel with swirling flow, will powerfully promote engineering application of this new kind of dissipation mode, which may solve some high velocity problems in high dam construction and provide a engineering example for technological and economical augmentation in a diversion tunnel reconstruction. it is of theoretical and practical importance to promote hydraulic structure researches and development
公伯峽水電站右岸旋流內消能泄洪洞是國內第一個泄量達1000m s 、水頭超過100m ,即將修建的旋流式內消能泄洪洞,其方案的論證與試驗研究以及建成后投入使用,將在國內外旋流式內消能泄洪洞設計、研究與工程應用中具有重要的意義,將有力的推動這一新的消能形式在工程中的應用,從而為解決高壩建設中泄水建築物的高速水流問題與導流洞改建的技術與經濟問題提供工程實例,對推動與發展水工水力學的研究與發展均具有重要的理論與實踐意義。In low developed non - karat mountain area, the main water supply patten is fetching water from a river, water - fetching building is built mostly on the bank or at the bottom of the river, it seemed to be fetching water from underground, but the quantity of the water depends on the runoff of the river, so it has close relationship with surfacewater actually
摘要人類利用開發程度較低的非巖溶山區一般以近河取水為主要供水方式,取水建築物多位於河岸或河底,從供水形式上看屬于取用地下水,但取水量的大小依賴于河流流量,因此實質上和地表水關系更加密切。The influence of water level differences on discharge of water - release structures of wide - shallow reservoir
寬淺式水庫庫水位差異對泄水建築物下泄流量的影響All water conveyance and water discharge structures are designed to locate at right bank strip ridge, due to special topography and land form. large excavation area and steep slope raising from close plan locations of adjacent structure lead to slope stability. in general, slope stability analysis and treatment are concerns of zipingpu project
由於其特殊的地形、地貌,工程的各輸、泄水建築物共7條隧洞均布置在右岸條形山脊內,各相鄰建築物進出口的平面位置距離較近,開挖范圍大、坡度高且陡,存在著大量因開挖而形成的高邊坡穩定問題。分享友人