量測結果 的英文怎麼說

中文拼音 [liángjiēguǒ]
量測結果 英文
measurement
  • : 量動1. (度量) measure 2. (估量) estimate; size up
  • : 動詞1. (測量) survey; fathom; measure 2. (測度; 推測) conjecture; infer
  • : 結動詞(長出果實或種子) bear (fruit); form (seed)
  • : Ⅰ名詞1 (果子) fruit 2 (事情的結局; 結果) result ; consequence 3 (姓氏) a surname Ⅱ動詞(吃...
  • 量測 : measuration量測精度 accuracy in measurement
  • 結果 : 結果bear fruit; fruit
  1. In our efforts to make forecasts for the quantity demand of auto car within the period of the next five years, three methods such as gray forecast, econometrics equation set and time - trend forecast are used. since the results of these three methods are very close, they may be reliable and used as reference for auto car industry

    在對未來五年轎車需求的預中,利用灰色預、經濟計方程組和時間趨勢預三種方法分別對2000年和2005年的轎車需求進行預,三種方法的預值非常接近,預應有一定的借鑒意義。
  2. Calculations of the density of alloys based on bernal - type models of the alloys metal component agreed fairly well with the experimentally determined values from measurements on alloys consisting of a noble metal together with a metalloid, such as alloys of palladium and silicon, or alloys consisting of iron, phosphorus, and carbon, although small discrepancies remained

    對于合金密度的計算,以伯納爾建立的金屬模型為基礎的計算,很大程度上等同於實驗中是針對于貴重金屬和非金屬的合金,比如說,鈀和硅的合金,或者由鐵、磷、和碳組成的合金,盡管還存在一些小的差異。
  3. Given the initial conditions including ( 1 ) number density distribution in space which has the similar form to the present day ones, ( 2 ) both the power law and gaussian mass functions for clusters, and ( 3 ) two different velocity distributions which one has a constant dispersion and the other is described by the eddington formula, the dynamical evolution of globular clusters in our milky way galaxy is investigated in detail by means of monte carlo simulations

    本文採用與觀具有相同形式的球狀星團空間密度分佈函數,在給定兩種球狀星團系統的初始質譜(冪律的和對數高斯的)和兩種球狀星團系統的初始速度分佈函數(愛丁頓速度分佈函數和常數的速度彌散度)條件下,我們採用montecarlo的方法對球狀星團系統的動力學演化進行討論。
  4. Averages will usually be interpreted as ensemble averages, taken over a large number of independent experiments or observations.

    「平均」通常應理解為「總體平均」,也就是說,是指對大獨立實驗或觀進行平均。
  5. By using both the prediction model from transportation ministry and the fhwa models, the prediction results were analyzed for high ways at different sections, different design speeds, detection points, traffic volumes, distances, heights, and at various other road conditions. the prediction results and the actual results were compared and the accuracy of prediction were assessed

    本文通過比較分析了fhwa預模式和交通部預模式在高速公路不同監路段、設計時速、點、車流、距離、高差、地面狀況條件下的預,並對預和實進行預精度和變化趨勢的比較研究。
  6. The deficiency of these substances will directly lead to a low productive capacity of animals, a poor resistance, a slow growth of fat, a small output of milk, and a weak fertility, etc. in order to help the herders find solutions to these problems, mr. bazil confected a feedstuff with necessary minerals for local herders based on the results of the float grass testing and his own personal work experience of many years

    去年秋天對當地水草進行檢發現缺少多種牲畜體內所需的礦物質和微元素。這些物質的缺乏會直接導致牲畜生產能力低下,抵抗力差,長膘慢,奶產低,繁殖能力差等。為了能幫助牧民找到解決這些問題的方法,巴茲爾先生根據水草檢及自己多年的工作經驗為當地牧民配製了所需礦物質飼料。
  7. The thermodynamic free energy on mixing and the spinodal equation in ternary homopolymer blends were obtained by making plausible approximation based on flory ' s equation of state theory. because of the non - linear behavior of the spinodal equation, a numerical solution approach was used and succeeded in solving the problem. spinodal of polystyrene ( ps ) / poly ( vinyl methyl ether ) ( pvme ) / poly ( 2, 6 - dimethyl - 1, 4 - phenylene oxide ) ( ppe ) were simulated over a wide temperature range and the calculated result was coincidence with that of the literature

    將上述方法用於已知狀態方程參數的二元均聚共混體系聚苯乙烯( ps ) /聚甲基乙烯基醚( pvme ) ,三元均聚共混體系聚苯乙烯( ps ) /聚甲基乙烯基醚( pvme ) /聚2 , 6 -二甲基1 , 4 -苯撐氧( ppe ) ,得到一系列不同溫度下的spinodal相圖,預與文獻報道吻合,在此基礎上進一步研究了聚合物的分子對體系相行為的影響。
  8. In order to detect the bottom thickness, cavity, leak and deformation of steel meshes in secondary lining of concrete in tunnel construction, the authors evaluate the wave character and the detected result in the second lining of the tunnel using surveying radar technology and conclude the wave character in the tunnel lining which has mass defect and tested the accuracy and reliability of this technique

    摘要為檢明隧道混凝土二次襯砌中的底界厚度、空洞、漏水、鋼筋網變形等質問題,利用探地雷達技術,通過對檢方法及工程檢實驗的研究,進行隧道二次襯砌中雷達波形特徵參數及檢評價,總了隧道襯砌質問題的雷達波形特徵,驗證檢方法的精度和可靠性。
  9. Finally, the present method is applied to the modal identification from the i / o data of fem dynamic analysis and on board measurement for a container ship

    最後以一貨櫃輪之有限元素動態分析模擬與實船量測結果為例進行船體整體振動之態特性識別。
  10. Based on yulingguan twin - arch tunnel, the author regards the structural design of tunnel as relatively reasonable by virtue of analyzing the results of tunnel field monitoring measurement, while some aspects of tunnel construction still remain to be improved

    本文以昱嶺關連拱隧道為研究背景,通過對隧道現場監控量測結果分析,認為隧道構設計較為合理,而隧道施工中存在一些需要改進的方面。
  11. After the comparison between numerical prediction and measured result, the numerical computation gives good agreement for both qualitative and quantitative point of view

    數值計算與實驗量測結果比較,在定性與定上皆能提供相當可靠的預
  12. Measurable results of the environmental management system, related to an organization ' s control of its environmental aspects, based on its environmental policy, objectives and targets

    組織的環境管理系統根據環境政策、目標及標的控制其環境考面所獲得之可量測結果
  13. The modal identifications for a 5 floors steel frame model from the measured vibration data subjected to earthquake, which was conducted by national earthquake research center [ yeh et al ( 1999 ) ], have been carried out to validate the applicability and effectiveness of the proposed method

    本文先以國家地震中心完成五層樓鋼構模型受地震引致振動的量測結果[葉士青等( 1999 ) ]為例,驗證本文提出方法的實用性與正確性。
  14. Finally, the special emphasis is laid upon the construction operation process of leigongshan tunnel. furthermore, analysis of results from monitoring measurement and its guide to construction operation is briefed. in addition, the bad situation in the construction process is commented

    最後扼要介紹了雷公山隧道的施工方法和過程,重點闡述了監控量測結果的分析及其在施工中的指導作用,並對施工中發生的不良現象進行了評述。
  15. Special emphasis is laid upon the construction operation process of flat tunnels with outsized span at even shallow depth, meanwhile, how to build large span flat tunnel is briefed in this article. measures taken to reduce vibrations caused by explosion in driving tunnel and surface subsidence and methods of monitoring and surveying in the course of construction are detailed in this article

    本文扼要介紹了大跨扁平隧道的施工方法,重點闡述了特大跨超淺埋扁平隧道的施工工藝過程,對爆破振動和地表沉降的控制方法,以及施工監控的過程和方法,並通過對量測結果的分析,說明監控對施工的指導作用,並對圍巖穩定性進行了一些簡要分析。
  16. And then according to every process of tunnel construction, simulated analysis is carried out. by combining with monitoring and instrumentation of surround rock periphery displacement and the face of land to sink, surround rock with spray laminating force, surround rock body internal displacement, anchor rod axle force and protect and lining build strength, we have carried out scientific analysis and synthesis judgement of the stability of tunnel wall rock and the security of timbering structure

    然後,根據隧道施工的各個工序進行模擬分析,並合對圍巖周邊位移、地表下沉、圍巖與噴層壓力、圍巖體內部位移、錨桿軸力、支護及襯砌強度進行的與監控,對量測結果作出了科學分析,從而對隧道圍巖的穩定性和支護構的安全性做出了綜合評判。
  17. According to the result of monitoringmeasurement and the test data of surrounding rock pressure, primary supportstress and structure internal force, analyzed the law of soft rock deformationin the extremely high ground - stress portion of baozhen tunnel, and adjusted therelevant construction parameter, that insured construction safety

    根據現場監控量測結果和對圍巖壓力、初支應力、構內力的試數據,分析了堡鎮隧道極高地應力段軟巖大變形的規律,及時調整相應施工參數,確保了施工安全。
  18. Then the coupling beams with new reinforcement layout were made an inquiry into, and the improvement on the seismic behavior by coupling beams diagonally reinforced with a few rows in end regions was found out at last, based on the observations of the experimental phenomena and the analysis of the measurement result, and by the comparison of seismic behavior by making use of hysteretic response, ductility and energy dissipation behavior, a conclusion is presented : the code for design and construction of reinforced concrete high - rise structures ( the draft asked for advise hi 2000 ) ca n ' t ensure that the coupling beams have fairly good seismic ductility ; the result of improvement of the seismic ductility of the coupling beams by the increase hi stirrups besides the strengthen of longitudinal detailing reinforcement was n ' t obvious ; the coupling beams diagonally reinforced with a few rows in end regions have fairly good mechanisms, and the ductility and the behavior of energy dissipation are better than conventionally reinforced concrete coupling beams, so it is suitable to te tised in short coupling beams

    本文通過對三根小跨高比(均為l h = 1 . 0 )剪力墻洞口連系梁在低周反復荷載作用下的試驗,了解了嚴格按《鋼筋混凝土高層建築構設計與施工規程》 ( 2000年徵求意見稿)設計的連梁具有的抗震性能,研究了採取增大連梁配箍同時加強縱向構造筋的方案對抗震性能的影響,並進一步對新的配筋形式的連梁進行了探討,了解了在連梁梁端配置多排交叉斜筋方案對連梁抗震性能的改善。通過對試驗現象的觀察和量測結果的分析,利用荷載?位移滯回曲線、延性和耗能性能等指標對各個試件的抗震性能進行了比較,最後得出論: 《鋼筋混凝土高層建築構設計與施工規程》 ( 2000年徵求意見稿)不能保證小跨高比連梁具有較好的抗震延性:通過增大連梁配箍同時加強縱向構造筋的方案對改善連梁的抗震延性的效不太明顯;梁端配置多排交叉斜筋的連梁具有相對較好的受力性能,其延性和耗能性能等各項性能指標均優于普通配筋連梁,宜在深連梁中採用。
  19. In all these 20 specimens, the embedded electronic steel - concrete slip transfer were respectively embedded on the steel shape webs and inside and outside of the flanges at certain intervals along the embedment length to measure the distributions of the interior slip, and the electronic strain gauges were also installed on the shallow grooves of each steel shape web and flanges at close intervals along the length to measure the distributions of the steel shape web and flanges strain, from which the distributions of bond stress were obtained. with these methods of measuring the distributions of slip and bond stresses, the establishment of the bond - slip constitutive relations were ensured

    用力的平衡方程,得到推出試驗中型鋼混凝土粘應力的大小及其分佈規律;根據鋼一混凝土電子滑移傳感器的滑移量測結果,分析了沿型鋼埋置長度的內部滑移分佈規律,並對試驗的特徵滑移值進行了統計回歸;根據粘應力和內部滑移,得出沿型鋼埋置長度方向上各截面的局部粘應力一滑移關系曲線,建立了局部粘滑移本構模型嘆x )一s仁, , … , c , … c 。
  20. First, based on comprehension analysis of the present study status on optimizing method to displacement back analysis in underground engineering home and abroad, intelligent optimizing method, which fits the features of underground engineering, has been developed by introducing annealing algorithm and genetic algorithm and improving them. second, according to practical features of nonlinear displacement for underground engineering, the mechanical model on back analysis to initial ground stress and mechanical parameters of surrounding rock mass in underground engineering is established, which is based on the measuring results of displacement of convergence in underground holes. while, by introducing finite element method and combining improved annealing algorithm and improved genetic - annealing algorithm, the theory and method of elastic - plastic displacement back analysis to surrounding rock in underground engineering has been founded

    首先,本文在綜合分析國內外地下工程優化位移反分析方法研究現狀的基礎上,引進模擬退火與遺傳演算法,並對其進行改進,建立了適合於地下工程問題特點的智能優化演算法;其次,根據地下工程非線性特點,基於地下工程洞周收斂位移量測結果,建立了用於地下工程初始地應力與圍巖力學參數反演分析的力學模型,並引進有限元分析手段,合改進模擬退火演算法與改進遺傳-模擬退火演算法,分別建立了基於這兩種智能優化演算法的地下工程圍巖彈塑性位移反分析理論與方法,並開發了相應的分析計算程序,為地下工程圍巖穩定性與開挖順序優化分析奠定了基礎;然後,在上述基礎上,根據地下工程開挖施工順序優化設計的特點,建立了基於圍巖塑性區面積的地下工程開挖施工順序優化分析模型,基於改進模擬退火演算法與改進遺傳-模擬退火演算法建立了地下工程開挖施工順序優化分析方法,並開發了相應的分析計算程序;最後,將上述分析計算程序用於工程實例分析,探討了其應用方法,證明了該文研究成的合理性和可靠性。
分享友人